Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Simplex Infrastructures Team. If you also belong to the team, you can get access from here

Simplex Infrastructures Verified Tick

Compare button icon Compare button icon Compare
3.3

based on 2k Reviews

Filter interviews by

Simplex Infrastructures Engineer Interview Questions and Answers

Updated 23 Aug 2021

Simplex Infrastructures Engineer Interview Experiences

1 interview found

Engineer Interview Questions & Answers

user image Anonymous

posted on 23 Aug 2021

I applied via Company Website and was interviewed before Aug 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Transmission Line experience
  • Ans. 

    I have experience in designing and analyzing transmission lines for power distribution.

    • Designed and analyzed transmission lines for power distribution projects

    • Performed load flow analysis and short circuit analysis for transmission lines

    • Experience in using software tools like PLS-CADD and PLS-POLE

    • Knowledge of industry standards and regulations for transmission line design

    • Collaborated with cross-functional teams to ensu

  • Answered by AI
  • Q2. Design of foundation
  • Ans. 

    Design of foundation is crucial for the stability and safety of any structure.

    • The type of foundation depends on the soil type and load-bearing capacity.

    • Factors like building height, weight, and seismic activity must be considered.

    • Proper drainage and waterproofing must be incorporated.

    • Foundation design must comply with local building codes and regulations.

    • Examples of foundation types include shallow, deep, and pile foun

  • Answered by AI
  • Q3. Stringing
  • Q4. Tower design

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be confident and answer

Interview questions from similar companies

Engineer Interview Questions & Answers

TCE user image Anonymous

posted on 5 Jan 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

After the shortlisting of CVs, list was sent for those who were eligible for the OT. The online test included aptitude + technical. There were pretty easy to moderate questions but time was less.

Round 2 - One-on-one 

(1 Question)

  • Q1. It was the technical round interview. Ours was online. It went up to 50 mins.
Round 3 - Video Call 

(1 Question)

  • Q1. The portal will be open for 1 hr and within that time some questions are to be answered by making a video and uploading it.
Round 4 - HR 

(1 Question)

  • Q1. Questions related to HR
Round 5 - Medical Test Round 

(1 Question)

  • Q1. Selected candidates would be asked to visit the mentioned hospital for this round.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Ask about Career employment History
  • Q2. Ask about my self introduction
Round 3 - Technical 

(2 Questions)

  • Q1. Ask about my previous company employment history and work experience briefly
  • Q2. Ask about last working project with brief explanation various project structure components

Interview Preparation Tips

Interview preparation tips for other job seekers - Please be prepared last working project details and experience
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Lime plant TBD capacity of Tata steel
  • Ans. 

    The capacity of Tata Steel's lime plant is yet to be determined.

    • The capacity of the lime plant is currently unknown and is still to be decided by Tata Steel.

    • Tata Steel is likely in the process of determining the optimal capacity for their lime plant.

    • The capacity of the lime plant will depend on various factors such as production requirements, market demand, and technological capabilities.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Concrete and site management
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Describe out your self
  • Q2. What is your job responsibilty
Round 3 - HR 

(2 Questions)

  • Q1. What is your salary expectation
  • Q2. Why you change the job

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & listen careful to the interviewer.why you change the job
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Who mach experience you have
  • Q2. Which company works and project

Interview Questionnaire 

2 Questions

  • Q1. Have you visited in steel plant ,power plant, cement plant?
  • Q2. Yes i visited in the plant

Interview Preparation Tips

Interview preparation tips for other job seekers - Come with your self confidence

Interview Questionnaire 

6 Questions

  • Q1. Percentage of steel in pile
  • Ans. 

    The percentage of steel in a pile varies depending on the type and design of the pile.

    • The percentage of steel in a pile can range from 0% to over 90%.

    • The type of pile (e.g. steel, concrete, timber) and its design (e.g. diameter, length, wall thickness) determine the percentage of steel.

    • Steel piles typically have a higher percentage of steel than other types of piles.

    • The percentage of steel in a pile can also affect its

  • Answered by AI
  • Q2. Pile built-up above cut off level as per IS code
  • Ans. 

    Pile built-up above cut off level as per IS code

    • IS code specifies the maximum allowable pile length above cut off level

    • Pile length above cut off level should not exceed 3 times the pile diameter

    • Built-up pile above cut off level can cause structural instability and failure

  • Answered by AI
  • Q3. Pile vertical tolerance as per IS code
  • Ans. 

    Vertical tolerance for piles as per IS code

    • As per IS 2911-1:2010, the vertical tolerance for piles is +/- 25mm

    • This tolerance is applicable for both driven and cast-in-situ piles

    • The tolerance is measured at the top of the pile and at intervals of 3m along the length

    • If the deviation exceeds the tolerance limit, the pile may need to be rejected or remedial measures taken

  • Answered by AI
  • Q4. Pile concrete consumption +- tolerance
  • Ans. 

    Pile concrete consumption tolerance depends on various factors.

    • Pile diameter and length

    • Concrete mix design

    • Placement method

    • Quality control measures

    • Environmental conditions

    • Tolerance typically ranges from 5-10% of estimated consumption

    • Regular monitoring and adjustment of concrete consumption is necessary

  • Answered by AI
  • Q5. Unit weight of steel
  • Ans. 

    Unit weight of steel is 7850 kg/m³

    • The unit weight of steel is the weight of a specific volume of steel

    • It is measured in kilograms per cubic meter (kg/m³)

    • The unit weight of steel is 7850 kg/m³

    • This value may vary slightly depending on the composition and manufacturing process of the steel

  • Answered by AI
  • Q6. Contractor MB related

Interview Questionnaire 

1 Question

  • Q1. Solar renewable energy

Interview Preparation Tips

Interview preparation tips for other job seekers - Electrical engineer

Simplex Infrastructures Interview FAQs

What are the top questions asked in Simplex Infrastructures Engineer interview?

Some of the top questions asked at the Simplex Infrastructures Engineer interview -

  1. Transmission Line experien...read more
  2. Design of foundati...read more
  3. Tower desi...read more

Tell us how to improve this page.

Simplex Infrastructures Engineer Salary
based on 12 salaries
₹3 L/yr - ₹6.5 L/yr
20% less than the average Engineer Salary in India
View more details

Simplex Infrastructures Engineer Reviews and Ratings

based on 6 reviews

3.4/5

Rating in categories

4.2

Skill development

3.1

Work-life balance

3.2

Salary

2.8

Job security

3.1

Company culture

3.2

Promotions

3.4

Work satisfaction

Explore 6 Reviews and Ratings
Assistant Manager
193 salaries
unlock blur

₹3.5 L/yr - ₹11.1 L/yr

Assistant Engineer
164 salaries
unlock blur

₹1.8 L/yr - ₹5.1 L/yr

Assistant Engineer - Civil
161 salaries
unlock blur

₹2.6 L/yr - ₹4.7 L/yr

Project Engineer
145 salaries
unlock blur

₹2.9 L/yr - ₹7.8 L/yr

Deputy Manager
115 salaries
unlock blur

₹5.5 L/yr - ₹12.6 L/yr

Explore more salaries
Compare Simplex Infrastructures with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview