Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by MKC Infrastructure Ltd. Team. If you also belong to the team, you can get access from here

MKC Infrastructure Ltd. Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

MKC Infrastructure Ltd. Deputy Manager Interview Questions and Answers

Updated 8 Feb 2024

MKC Infrastructure Ltd. Deputy Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. About experience and job profile

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. BBS preparation
  • Q2. Drawings related

Interview Preparation Tips

Interview preparation tips for other job seekers - They should work on KSA ( knowledge, skill, attitude) to get dream job.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About job profile on the present
  • Q2. About job profile the overall
Round 3 - One-on-one 

(1 Question)

  • Q1. What is the roles and responsibilities
Round 4 - HR 

(5 Questions)

  • Q1. Why are you looking for a change?
  • Q2. What are your strengths and weaknesses?
  • Q3. Share details of your previous job.
  • Q4. Tell me about yourself.
  • Q5. What are the challenges faced

Interview Preparation Tips

Interview preparation tips for other job seekers - Final discussion on being selected

I applied via Naukri.com and was interviewed before Jan 2021. There were 2 interview rounds.

Round 1 - Group Discussion 

About store procedures and systems

Round 2 - One-on-one 

(1 Question)

  • Q1. Planning in inventory management
  • Ans. 

    Planning in inventory management involves forecasting demand, setting inventory levels, and replenishing stock.

    • Forecasting demand based on historical sales data and market trends

    • Setting inventory levels to balance customer demand and cost of holding inventory

    • Replenishing stock in a timely manner to avoid stockouts and overstocking

    • Using inventory management software to track inventory levels and automate replenishment

    • Re...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Store Manager interview:
  • Material Management
Interview preparation tips for other job seekers - Clear about your role in stores management and adopt new policy /tools and procedures required for better control it will help us to grow speedly at previous market
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Current project details, BBS, shuttering schematic drowning, waterproofing SOP,
Round 3 - HR 

(1 Question)

  • Q1. Only for salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepration of BBC , all construction activities SOP prepration

I applied via Newspaper Ad and was interviewed before Jul 2021. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Who is our customer ? You have applied for this post. Are you sure that you are deserve for this post . Explain... What is inventory control? How it works ? What is perpetual inventory control ? What are...
Round 2 - Technical 

(1 Question)

  • Q1. How you will measure a full truck load of sand ? Explain What is cft ? Do you knpw the safety rule for job site ? Explain the disposal method of steel scrap materials. What is reconciliation ? What is the...
  • Ans. 

    To measure a full truck load of sand, calculate the volume in cubic feet (cft) by multiplying the length, width, and height of the truck bed.

    • Measure the length, width, and height of the truck bed

    • Multiply the three measurements to get the volume in cubic feet (cft)

    • For example, if the truck bed is 10 feet long, 5 feet wide, and 3 feet high, the volume would be 150 cubic feet (10 x 5 x 3)

    • Ensure the truck is loaded evenly

  • Answered by AI
Round 3 - Case Study 

Pls tell me one of your achievements in your last employer ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Tha above questionare are enough for the candidates those are
selected for an interview.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Question of inventory and scrap analysis,stock reconciliation
  • Ans. Type of consumable,asset, bulk item, scaffolding,doka item ,minimum and maximum stock, information of ho for scrap sales
  • Answered Anonymously
  • Q2. Rate analysis,costing ,cs, controlling of consumption
  • Ans. Each material self checking and prepare of inspection report
  • Answered Anonymously
  • Q3. Material quality survey of raw material, physical verification,coding,surplus item list generated in sap or cema

Interview Preparation Tips

Topics to prepare for L&T Construction Store Manager interview:
  • Company website
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Costing and planning
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell me about u
  • Q2. Tell me about work experience

Interview Preparation Tips

Topics to prepare for L&T Construction Senior Manager interview:
  • Strategic Planning
  • Team Management
  • Resources management
  • Team Motivation
Interview preparation tips for other job seekers - Keep on focus on new developments
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Know how of technical design.
  • Q2. Possible way of design optimisation.
  • Ans. 

    Design optimization can be achieved through various methods such as simulation, iteration, and utilization of advanced tools.

    • Utilize simulation software to test different design scenarios and identify the most optimal solution

    • Iterate on the design by making incremental changes and evaluating the impact on performance

    • Use advanced tools like finite element analysis (FEA) or computational fluid dynamics (CFD) for detailed...

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Expectations in terms of monetary benifits
  • Ans. 

    Expectations for monetary benefits should align with industry standards and reflect the level of responsibility and experience required for the Senior Manager role.

    • Monetary benefits should be competitive with market rates for Senior Manager positions.

    • Consider additional perks such as bonuses, stock options, or benefits packages.

    • Negotiate for salary increases based on performance and achievements.

    • Ensure transparency and...

  • Answered by AI
  • Q2. Company culture

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm & careful while answering

Skills evaluated in this interview

MKC Infrastructure Ltd. Interview FAQs

How many rounds are there in MKC Infrastructure Ltd. Deputy Manager interview?
MKC Infrastructure Ltd. interview process usually has 1 rounds. The most common rounds in the MKC Infrastructure Ltd. interview process are HR.
How to prepare for MKC Infrastructure Ltd. Deputy Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at MKC Infrastructure Ltd.. The most common topics and skills that interviewers at MKC Infrastructure Ltd. expect are Business continuity management, CNC Machines, Cataloguing, Cobol and Commercial Leasing.

Tell us how to improve this page.

MKC Infrastructure Ltd. Deputy Manager Interview Process

based on 4 interviews

Interview experience

4.8
  
Excellent
View more
MKC Infrastructure Ltd. Deputy Manager Salary
based on 15 salaries
₹6 L/yr - ₹7.8 L/yr
28% less than the average Deputy Manager Salary in India
View more details

MKC Infrastructure Ltd. Deputy Manager Reviews and Ratings

based on 8 reviews

4.0/5

Rating in categories

4.0

Skill development

4.0

Work-life balance

4.1

Salary

4.3

Job security

4.0

Company culture

4.1

Promotions

4.5

Work satisfaction

Explore 8 Reviews and Ratings
Executive Accountant
32 salaries
unlock blur

₹2.3 L/yr - ₹4.2 L/yr

Junior Engineer
30 salaries
unlock blur

₹1.8 L/yr - ₹4 L/yr

Senior Engineer
29 salaries
unlock blur

₹4 L/yr - ₹7.8 L/yr

Assistant Manager
26 salaries
unlock blur

₹4.2 L/yr - ₹9.6 L/yr

Mechanical Engineer
25 salaries
unlock blur

₹2.4 L/yr - ₹4.8 L/yr

Explore more salaries
Compare MKC Infrastructure Ltd. with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.3
Compare

ITD Cementation India

4.3
Compare

Ashoka Buildcon

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview