Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There were 2 interview rounds.
Design optimization can be achieved through various methods such as simulation, iteration, and utilization of advanced tools.
Utilize simulation software to test different design scenarios and identify the most optimal solution
Iterate on the design by making incremental changes and evaluating the impact on performance
Use advanced tools like finite element analysis (FEA) or computational fluid dynamics (CFD) for detailed...
Expectations for monetary benefits should align with industry standards and reflect the level of responsibility and experience required for the Senior Manager role.
Monetary benefits should be competitive with market rates for Senior Manager positions.
Consider additional perks such as bonuses, stock options, or benefits packages.
Negotiate for salary increases based on performance and achievements.
Ensure transparency and...
I applied via Naukri.com and was interviewed in Sep 2024. There was 1 interview round.
I successfully resolved a conflict between two team members by facilitating open communication and finding a compromise.
Facilitated a meeting between the two team members to discuss the issues
Encouraged open communication and active listening
Helped them identify common ground and reach a compromise
Followed up to ensure the resolution was sustainable
I applied via Approached by Company and was interviewed in Feb 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed before Dec 2023. There was 1 interview round.
L&T Construction interview questions for designations
Top trending discussions
posted on 8 Jul 2024
I applied via Naukri.com and was interviewed in Jun 2024. There was 1 interview round.
Costing for transmission line involves calculating the total expenses for materials, labor, equipment, and overhead costs.
Calculate the total length of the transmission line needed
Estimate the cost of materials such as cables, poles, insulators, and connectors
Factor in labor costs for installation and maintenance
Include equipment costs for specialized tools and machinery
Consider overhead costs such as permits, land acq...
Execution of transmission line involves planning, design, construction, and maintenance of power lines.
Planning involves route selection, environmental impact assessment, and obtaining necessary permits.
Design includes determining the type of towers, conductor size, and insulator selection.
Construction involves clearing the right-of-way, setting foundations, erecting towers, and stringing conductors.
Maintenance include...
I applied via Approached by Company and was interviewed in May 2023. There were 3 interview rounds.
posted on 26 May 2023
posted on 8 Dec 2023
I applied via LinkedIn and was interviewed before Dec 2022. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed in Dec 2021. There were 3 interview rounds.
based on 4 interviews
Interview experience
based on 34 reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹6 L/yr - ₹18.2 L/yr |
Senior Engineer
714
salaries
| ₹3 L/yr - ₹12 L/yr |
Assistant Construction Manager
499
salaries
| ₹5.4 L/yr - ₹17.5 L/yr |
Civil Site Engineer
368
salaries
| ₹1.2 L/yr - ₹8.3 L/yr |
Construction Management
328
salaries
| ₹7.8 L/yr - ₹28.5 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA