Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by G R Infraprojects Team. If you also belong to the team, you can get access from here

G R Infraprojects Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

G R Infraprojects Senior Manager Interview Questions and Answers

Updated 7 Jul 2023

G R Infraprojects Senior Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Complete interview through system
Round 3 - Technical 

(1 Question)

  • Q1. Need expertise in SAP and Excel

Interview Preparation Tips

Interview preparation tips for other job seekers - Excel and SAP must

Senior Manager Jobs at G R Infraprojects

View all

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Know how of technical design.
  • Q2. Possible way of design optimisation.
  • Ans. 

    Design optimization can be achieved through various methods such as simulation, iteration, and utilization of advanced tools.

    • Utilize simulation software to test different design scenarios and identify the most optimal solution

    • Iterate on the design by making incremental changes and evaluating the impact on performance

    • Use advanced tools like finite element analysis (FEA) or computational fluid dynamics (CFD) for detailed...

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Expectations in terms of monetary benifits
  • Ans. 

    Expectations for monetary benefits should align with industry standards and reflect the level of responsibility and experience required for the Senior Manager role.

    • Monetary benefits should be competitive with market rates for Senior Manager positions.

    • Consider additional perks such as bonuses, stock options, or benefits packages.

    • Negotiate for salary increases based on performance and achievements.

    • Ensure transparency and...

  • Answered by AI
  • Q2. Company culture

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm & careful while answering

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. What is your role and responsibilities in current organisation
  • Q2. What size of team you handling
  • Q3. What is the maximum target you had achieved and explain how.
  • Ans. 

    I achieved a 150% increase in sales target by implementing a new marketing strategy.

    • Set ambitious but achievable targets

    • Analyzed market trends and customer behavior

    • Implemented a new marketing strategy focusing on customer engagement

    • Provided training and motivation to the sales team

    • Regularly monitored progress and made adjustments as needed

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. What is the notice period

Interview Preparation Tips

Interview preparation tips for other job seekers - Be master in your core field.Because your interview depends on your interviewers knowledge and hence you never underestimate them.Always show your leadership qualities,can handle big teams
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Costing for transmission line
  • Ans. 

    Costing for transmission line involves calculating the total expenses for materials, labor, equipment, and overhead costs.

    • Calculate the total length of the transmission line needed

    • Estimate the cost of materials such as cables, poles, insulators, and connectors

    • Factor in labor costs for installation and maintenance

    • Include equipment costs for specialized tools and machinery

    • Consider overhead costs such as permits, land acq...

  • Answered by AI
  • Q2. Execution of transmission line
  • Ans. 

    Execution of transmission line involves planning, design, construction, and maintenance of power lines.

    • Planning involves route selection, environmental impact assessment, and obtaining necessary permits.

    • Design includes determining the type of towers, conductor size, and insulator selection.

    • Construction involves clearing the right-of-way, setting foundations, erecting towers, and stringing conductors.

    • Maintenance include...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Larsen & Toubro Limited Senior Manager interview:
  • Project Management
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Quality Control Questions
  • Q2. Self Compacting Concrete
  • Q3. Conducting Mix Design
  • Q4. Quality Management System
Round 3 - HR 

(1 Question)

  • Q1. Salary Details & Key results area

Interview Preparation Tips

Topics to prepare for Welspun Enterprises Senior Manager interview:
  • Concrete Technology
Interview preparation tips for other job seekers - Good Organisation
Interview experience
4
Good
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Apr 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Subject matters knowledge question.
  • Q2. Market intelligence queries.
  • Q3. Weakness and strength

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Subject matter expert.
Be little flexible and adaptable in working hours.
Be ready for multiple assignment.
Great company and good vision of company
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Details of past project responsibility
Round 3 - HR 

(1 Question)

  • Q1. Existing package and expectations

I applied via Recruitment Consultant and was interviewed in Dec 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Technical questions and experience details
  • Q2. Project cost,Plan

Interview Preparation Tips

Interview preparation tips for other job seekers - Profile matches with the company they will hire you
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Tell me about tough scenario you reolved
  • Ans. 

    I successfully resolved a conflict between two team members by facilitating open communication and finding a compromise.

    • Facilitated a meeting between the two team members to discuss the issues

    • Encouraged open communication and active listening

    • Helped them identify common ground and reach a compromise

    • Followed up to ensure the resolution was sustainable

  • Answered by AI

I applied via Referral and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. How to make a budget of any project
  • Ans. 

    To make a budget for a project, identify all expenses and allocate funds accordingly.

    • Identify all expenses including labor, materials, equipment, and any other costs

    • Estimate the cost of each expense and allocate funds accordingly

    • Consider any potential risks or unexpected expenses and allocate contingency funds

    • Regularly review and adjust the budget as needed throughout the project

    • Use budgeting software or tools to help ...

  • Answered by AI
  • Q2. Detailed process of budget and CTC is to be explained
Round 2 - One-on-one 

(2 Questions)

  • Q1. Analysis of rate of RCC or reinforcement or shuttering
  • Ans. 

    The rate of RCC, reinforcement, or shuttering can be analyzed through various factors.

    • Factors affecting the rate of RCC include the type of concrete mix, the size and shape of the structure, and the location of the project.

    • Reinforcement rates depend on the type and size of the reinforcement used, as well as the complexity of the design.

    • Shuttering rates are influenced by the type of material used, the size and shape of ...

  • Answered by AI
  • Q2. Aor is to be made and showed

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and do not bluff be straight forward and said no if u don't know honesty is important in TATA

G R Infraprojects Interview FAQs

How many rounds are there in G R Infraprojects Senior Manager interview?
G R Infraprojects interview process usually has 3 rounds. The most common rounds in the G R Infraprojects interview process are Resume Shortlist, One-on-one Round and Technical.
How to prepare for G R Infraprojects Senior Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at G R Infraprojects. The most common topics and skills that interviewers at G R Infraprojects expect are Senior Management, 400Kv, Tender Estimation, Budgeting and Contracts.
What are the top questions asked in G R Infraprojects Senior Manager interview?

Some of the top questions asked at the G R Infraprojects Senior Manager interview -

  1. Need expertise in SAP and Ex...read more
  2. Complete interview through sys...read more

Tell us how to improve this page.

G R Infraprojects Senior Manager Interview Process

based on 2 interviews

Interview experience

3
  
Average
View more
G R Infraprojects Senior Manager Salary
based on 53 salaries
₹9.1 L/yr - ₹23.9 L/yr
23% less than the average Senior Manager Salary in India
View more details

G R Infraprojects Senior Manager Reviews and Ratings

based on 19 reviews

4.2/5

Rating in categories

3.3

Skill development

3.7

Work-life balance

4.0

Salary

3.3

Job security

3.4

Company culture

3.8

Promotions

3.7

Work satisfaction

Explore 19 Reviews and Ratings
Senior Manager/ AGM- Hydro Planning

Dibang Valley

10-15 Yrs

Not Disclosed

Explore more jobs
Assistant Manager
347 salaries
unlock blur

₹4.6 L/yr - ₹11.5 L/yr

Senior Engineer
228 salaries
unlock blur

₹3.6 L/yr - ₹8.6 L/yr

Engineer
136 salaries
unlock blur

₹2 L/yr - ₹6.5 L/yr

Deputy Manager
126 salaries
unlock blur

₹6.6 L/yr - ₹17.5 L/yr

Structural Engineer
123 salaries
unlock blur

₹2 L/yr - ₹6.3 L/yr

Explore more salaries
Compare G R Infraprojects with

Nagarjuna Construction Company

4.1
Compare

PNC Infratech

3.9
Compare

Ashoka Buildcon

4.0
Compare

IRB Infrastructure

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview