Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by G R Infraprojects Team. If you also belong to the team, you can get access from here

G R Infraprojects Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

G R Infraprojects Structural Engineer Interview Questions, Process, and Tips

Updated 27 Mar 2024

Top G R Infraprojects Structural Engineer Interview Questions and Answers

View all 7 questions

G R Infraprojects Structural Engineer Interview Experiences

4 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. What should be the height of Tremie pipe from pile founding level during concrete?
  • Ans. 

    The height of Tremie pipe from pile founding level during concrete should be maintained at a certain level to ensure proper placement of concrete.

    • The Tremie pipe should typically be kept at a height of 1-2 meters above the pile founding level to prevent segregation of concrete.

    • Maintaining the correct height ensures that the concrete flows smoothly through the pipe and fills the pile without any gaps or voids.

    • Adjustment...

  • Answered by AI
  • Q2. Which all codes are used for structure engineering ?
  • Ans. 

    Various codes are used in structural engineering to ensure safety and compliance with regulations.

    • International Building Code (IBC)

    • American Society of Civil Engineers (ASCE) standards

    • American Concrete Institute (ACI) standards

    • American Institute of Steel Construction (AISC) standards

    • Eurocode

    • National Building Code of Canada (NBCC)

  • Answered by AI
  • Q3. What is the role of bearings in Bridges?
  • Ans. 

    Bearings in bridges help distribute loads and allow for movement due to temperature changes and seismic activity.

    • Bearings help distribute the loads from the bridge deck to the substructure, reducing stress on the bridge components.

    • Bearings allow for movement of the bridge deck due to temperature changes, seismic activity, and other factors.

    • Different types of bearings include elastomeric bearings, pot bearings, and slid...

  • Answered by AI
  • Q4. Which formula is used to calculate the elongation of PSC Girder?
  • Ans. 

    The formula used to calculate the elongation of PSC Girder is based on the modulus of elasticity and the change in length.

    • The formula for calculating elongation is: Elongation = (Load x Length) / (Modulus of Elasticity x Area)

    • Modulus of Elasticity is a measure of a material's stiffness and is specific to the material used in the PSC Girder

    • The change in length is the difference between the original length and the length...

  • Answered by AI
  • Q5. What is the Process of Making PSC Girder?
  • Ans. 

    The process of making PSC girder involves preparing the concrete mix, casting the girder in a formwork, curing, and testing for quality.

    • Prepare the concrete mix with a specific ratio of cement, aggregates, and water.

    • Pour the mix into a formwork that is designed to the shape and size of the girder.

    • Place prestressed steel strands or bars in the formwork before pouring the concrete to provide strength.

    • Cure the girder by m...

  • Answered by AI
  • Q6. What is socketing length in Pile?
  • Ans. 

    Socketing length in pile refers to the length of the pile that is embedded into the rock or hard strata to provide additional support and stability.

    • Socketing length is determined based on the strength and stability of the rock or strata at the pile tip.

    • It helps in transferring the load from the pile to the rock or hard strata, increasing the overall capacity of the pile.

    • Socketing length can vary depending on the site c...

  • Answered by AI
Round 3 - HR 

(4 Questions)

  • Q1. Why do you want to leave your previous Job?
  • Q2. Are you ready to relocate ?
  • Q3. How much salary do you expect?
  • Q4. Tell me am Example when you did Team Work.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared for the answer like your Job change decision with strong reason. And before appearing any Interview, Read all the notes , which all you prepared Earlier. And one more thing, read about the topic for which you have applied specially and about the company as well.

Structural Engineer Interview Questions & Answers

user image Deepak Kashyap

posted on 4 Apr 2021

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

Interview Questionnaire 

2 Questions

  • Q1. Type of pile , why we provide pile,pile dia , lvup vup svup type questions
  • Ans. 

    Piles are used in construction to transfer loads from a structure to a stronger layer of soil or rock below the surface.

    • Types of piles include driven piles, bored piles, and screw piles.

    • Piles are provided to support structures on weak or compressible soil, to resist uplift forces, or to provide lateral support.

    • The diameter of a pile is determined based on the load it needs to support and the soil conditions.

    • LVUP (Large...

  • Answered by AI
  • Q2. Mostly we use two types of pile (1) friction pile (2)end bearing pile

Interview Preparation Tips

Interview preparation tips for other job seekers - Please read MORTH AN

Structural Engineer Interview Questions Asked at Other Companies

Q1. 1. Find weight and COG of an irrrgular shape. Unit weight of memb ... read more
asked in WSP
Q2. How moment is transfer from beam to column, In I section what is ... read more
Q3. What should be the height of Tremie pipe from pile founding level ... read more
Q4. How much cement used for making 1m³ concrete
asked in Bechtel
Q5. Explain about recent work in details from initial stage to execut ... read more

Interview Questionnaire 

1 Question

  • Q1. Regarding our practical experience

I was interviewed in Apr 2021.

Interview Preparation Tips

Interview preparation tips for other job seekers - Face to face interview and clean communication

G R Infraprojects interview questions for designations

 Senior Structural Engineer

 (3)

 Civil Structural Engineer

 (1)

 Assistant Structural Manager

 (1)

 Civil Engineer

 (3)

 Site Engineer

 (2)

 Planning Engineer

 (1)

 Billing Engineer

 (1)

 Safety Engineer

 (1)

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - One-on-one 

(2 Questions)

  • Q1. How do you calculate the amount of material used in cubic meters?
  • Q2. Water absorpation related
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via campus placement at Birla Institute of Technology and Science (BITS), Pilani and was interviewed in Jul 2024. There were 3 interview rounds.

Round 1 - Group Discussion 

Social media connecting people

Round 2 - Technical 

(2 Questions)

  • Q1. Timoshenko beam theory
  • Q2. Sfd and bmd diagram
  • Ans. 

    Sfd and bmd diagrams show the variation of shear force and bending moment along the length of a structural member.

    • SFD (Shear Force Diagram) shows the variation of shear force along the length of a beam or structural member.

    • BMD (Bending Moment Diagram) shows the variation of bending moment along the length of a beam or structural member.

    • SFD and BMD are essential for analyzing the internal forces and moments in a structu...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Introduce yourself
  • Ans. 

    I am a structural engineer with 5 years of experience in designing and analyzing buildings and bridges.

    • Graduated with a degree in Civil Engineering

    • Worked on various projects including high-rise buildings and pedestrian bridges

    • Proficient in software such as AutoCAD and SAP2000

  • Answered by AI
  • Q2. Preference of job location
  • Ans. 

    I am open to job locations that offer opportunities for growth and development.

    • I am willing to relocate for the right job opportunity

    • I prefer job locations with good transportation options

    • I am open to both urban and rural locations depending on the job requirements

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well both technical and communication skills
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Basics of civil engineering
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the IS code of pile.
  • Ans. 

    IS 2911 is the Indian Standard code for design and construction of pile foundations.

    • IS 2911 is the code for design and construction of pile foundations in India.

    • It covers various types of piles including driven piles, bored cast-in-situ piles, etc.

    • The code provides guidelines for the design, materials, construction, and testing of piles.

    • It ensures the safety and stability of structures supported by piles.

    • Example: IS 29...

  • Answered by AI
  • Q2. What is the density of bentonite during piling.
  • Ans. 

    The density of bentonite during piling is typically around 1.0 to 1.2 g/cm^3.

    • The density of bentonite can vary depending on the specific type and concentration used.

    • Higher density bentonite is often preferred for better support during piling operations.

    • Typical range of density for bentonite during piling is 1.0 to 1.2 g/cm^3.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Auto cad commands
  • Q2. Trim Shortcut Key
  • Q3. Fillet Command Use Which Purpose
  • Ans. 

    The Fillet command is used in structural engineering to create a rounded corner between two lines or objects.

    • The Fillet command is used to create a smooth transition between two lines or objects by adding a rounded corner.

    • It is commonly used in structural engineering to create fillets at the junctions of beams, columns, and other structural elements.

    • The Fillet command can be used with different radius values to control...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - prepare the basic question and answers

Skills evaluated in this interview

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. What is mean by shear key
  • Ans. 

    Shear key is a device used to transfer shear forces between two components in a structure.

    • Shear keys are typically used in construction joints to prevent sliding between adjacent components.

    • They are designed to resist horizontal forces and ensure stability.

    • Shear keys can be found in structures such as bridges, buildings, and dams.

    • Examples include shear keys in bridge expansion joints to prevent movement between bridge

  • Answered by AI
  • Q2. Different between columns and beams
  • Ans. 

    Columns are vertical structural members that support loads, while beams are horizontal members that transfer loads to columns or walls.

    • Columns are vertical and primarily support compressive loads.

    • Beams are horizontal and primarily support bending loads.

    • Columns are typically taller than they are wide, while beams are typically wider than they are tall.

    • Examples: In a building, columns support the weight of the floors abo...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Ss

G R Infraprojects Interview FAQs

How many rounds are there in G R Infraprojects Structural Engineer interview?
G R Infraprojects interview process usually has 3 rounds. The most common rounds in the G R Infraprojects interview process are Resume Shortlist, Technical and HR.
How to prepare for G R Infraprojects Structural Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at G R Infraprojects. The most common topics and skills that interviewers at G R Infraprojects expect are AutoCAD, Staad Pro, Structural, Structural Design and marine.
What are the top questions asked in G R Infraprojects Structural Engineer interview?

Some of the top questions asked at the G R Infraprojects Structural Engineer interview -

  1. What should be the height of Tremie pipe from pile founding level during concr...read more
  2. Which formula is used to calculate the elongation of PSC Gird...read more
  3. Which all codes are used for structure engineerin...read more

Tell us how to improve this page.

G R Infraprojects Structural Engineer Interview Process

based on 2 interviews

Interview experience

5
  
Excellent
View more
G R Infraprojects Structural Engineer Salary
based on 123 salaries
₹2 L/yr - ₹6.3 L/yr
31% less than the average Structural Engineer Salary in India
View more details

G R Infraprojects Structural Engineer Reviews and Ratings

based on 38 reviews

3.8/5

Rating in categories

3.9

Skill development

3.6

Work-life balance

3.8

Salary

3.6

Job security

3.7

Company culture

3.7

Promotions

3.6

Work satisfaction

Explore 38 Reviews and Ratings
Assistant Manager
347 salaries
unlock blur

₹4.6 L/yr - ₹11.5 L/yr

Senior Engineer
228 salaries
unlock blur

₹3.6 L/yr - ₹8.6 L/yr

Engineer
136 salaries
unlock blur

₹2 L/yr - ₹6.5 L/yr

Deputy Manager
126 salaries
unlock blur

₹6.6 L/yr - ₹17.5 L/yr

Structural Engineer
123 salaries
unlock blur

₹2 L/yr - ₹6.3 L/yr

Explore more salaries
Compare G R Infraprojects with

Nagarjuna Construction Company

4.1
Compare

PNC Infratech

3.9
Compare

Ashoka Buildcon

4.0
Compare

IRB Infrastructure

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview