I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.
I expect the company to provide opportunities for growth, a positive work environment, and clear communication.
Opportunities for career advancement
Positive work culture
Clear communication channels
I prefer not to disclose my previous salary as I believe my value is based on my skills and experience.
It is not appropriate to discuss previous salary in an interview
Focus on discussing the value you can bring to the company
Emphasize your skills, experience, and qualifications instead of past salary
I applied via Approached by Company and was interviewed before Jul 2021. There were 3 interview rounds.
Earthwork quantity can be calculated by using the formula: Volume = Area x Depth
Calculate the area of the earthwork site (length x width)
Determine the depth of excavation or fill required
Multiply the area by the depth to get the volume of earthwork
Consider any slopes or irregular shapes in the calculation
Use software like AutoCAD or Excel for accurate calculations
To calculate re wall quantity and rate, measure the area of the wall and determine the cost per unit area.
Measure the length and height of the wall to calculate the area in square feet or square meters.
Determine the cost per unit area by dividing the total cost of materials and labor by the total area of the wall.
Multiply the area of the wall by the cost per unit area to calculate the total cost of the wall.
Example: If...
I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Jan 2022. There were 2 interview rounds.
Road quantity can be calculated by measuring the length, width, and depth of the road and multiplying them together.
Measure the length of the road using a measuring tape or GPS
Measure the width of the road using a measuring tape or by counting the number of lanes
Measure the depth of the road by taking samples or using ground-penetrating radar
Multiply the length, width, and depth together to get the road quantity
Selecting construction materials involves considering factors such as durability, cost, and environmental impact.
Consider the purpose of the structure and the load it will bear
Evaluate the durability and lifespan of the materials
Compare the cost of different materials and factor in long-term maintenance expenses
Assess the environmental impact of the materials and choose sustainable options
Consult with architects, engin...
Output batching plant is a machine used in construction to mix and produce concrete in large quantities.
Output batching plant is used in construction to produce large quantities of concrete
It mixes different ingredients like cement, water, and aggregates to produce concrete
The machine can be computerized or manually operated
Output batching plant can produce different types of concrete like ready-mix, precast, and centr...
G R Infraprojects interview questions for designations
I applied via Campus Placement and was interviewed before Sep 2022. There were 4 interview rounds.
The test was normal and anyone can crack it easily
I applied via LinkedIn and was interviewed in Feb 2022. There were 2 interview rounds.
Top trending discussions
posted on 22 Apr 2022
I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2021. There were 4 interview rounds.
Yes, I have experience in handling RVNL projects.
I have previously managed a similar railway project
I am familiar with the processes and regulations involved
I have a strong team to support me
I am confident in my ability to deliver the project on time and within budget
posted on 16 May 2021
I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.
I can join within two weeks.
I am currently serving a two-week notice period at my current job.
I have already completed all necessary paperwork and background checks.
I am ready to start as soon as possible.
I can adjust my start date based on the company's requirements.
I left my last company to pursue new opportunities and challenges.
Seeking growth and advancement in my career
Looking for a company with a better cultural fit
Wanting to broaden my skill set
Desire for a higher level of responsibility
Company downsizing or restructuring
based on 6 interviews
1 Interview rounds
based on 86 reviews
Rating in categories
Assistant Manager
357
salaries
| ₹4.4 L/yr - ₹11.5 L/yr |
Senior Engineer
227
salaries
| ₹3.6 L/yr - ₹8.4 L/yr |
Engineer
138
salaries
| ₹2.2 L/yr - ₹6.5 L/yr |
Deputy Manager
129
salaries
| ₹6.6 L/yr - ₹16 L/yr |
Structural Engineer
122
salaries
| ₹2 L/yr - ₹6.3 L/yr |
Larsen & Toubro Limited
Tata Projects
L&T Construction
Megha Engineering & Infrastructures