Essar Projects India Interview Questions, Process, and Tips

Updated 29 Jan 2025

Top Essar Projects India Interview Questions and Answers

View all 7 questions

Essar Projects India Interview Experiences

Popular Designations

6 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before Jan 2024.

Round 1 - Technical 

(5 Questions)

  • Q1. Can you describe your position and responsibilities at work?
  • Q2. What types of filters are used in bag filters?
  • Q3. What is the process for calculating HVAC (Heating, Ventilation, and Air Conditioning) requirements?
  • Q4. What is absolute humidity?
  • Q5. What is ESHF in HVAC?
Round 2 - Aptitude Test 

What are your strengths and weaknesses?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident in your profile and your responses.

Deputy Manager Interview Questions asked at other Companies

Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with us and which products...3.what is main business in your area and its functions...4 Previous comoany achevements 5.Your strengts and weakness.
View answer (67)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

My personal Profile, working knowledge,

Round 2 - Aptitude Test 

My nature, behavior, honesty, simplicity, connecting people, positive attitude, relationship with other, communications, adjustment, negotiation, working Exposure,time management.

Round 3 - HR 

(4 Questions)

  • Q1. What's your qualifications?
  • Q2. What's your work experience
  • Q3. What is your current address
  • Q4. What is your current CTC
Round 4 - One-on-one 

(1 Question)

  • Q1. Are you interest to work with our company?

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (86)
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Why do you want to leave your previous company
Round 3 - Technical 

(2 Questions)

  • Q1. Free float vs Total Float
  • Ans. 

    Free float is the amount of time an activity can be delayed without delaying the project, while total float is the amount of time an activity can be delayed without delaying the successor activity.

    • Free float is specific to an activity, while total float is related to the entire project schedule.

    • Free float is calculated by subtracting the early start of the activity from the early start of the successor activity, while ...

  • Answered by AI
  • Q2. Time limited vs resource limited
  • Ans. 

    Time limited projects have fixed deadlines while resource limited projects have fixed resources.

    • Time limited projects require completion by a specific deadline.

    • Resource limited projects have a fixed amount of resources available.

    • Balancing time and resources is crucial for project success.

    • Example: A construction project with a deadline to finish before winter (time limited) vs a project with a fixed budget (resource lim

  • Answered by AI

Skills evaluated in this interview

Planning Engineer Interview Questions asked at other Companies

Q1. Prepare a small given example site schedule with sequencing and duration determine project duration in MSP/on Paper What is critical path method? How will you identify while making on paper rather than MSP? How would you track schedule-Proc... read more
View answer (1)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at School of Architecture CEPT, Ahmedabad and was interviewed before Jul 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Time bound test with logical reasoning & analytical skills

Round 2 - Group Discussion 

Which engineering discipline most important?

Deputy Manager Interview Questions asked at other Companies

Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with us and which products...3.what is main business in your area and its functions...4 Previous comoany achevements 5.Your strengts and weakness.
View answer (64)

Essar Projects India interview questions for popular designations

 Assistant Manager

 (3)

 Deputy Manager

 (2)

 Planning Engineer

 (1)

I applied via Campus Placement and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Aptitude Test 

3 tests are conducted

Round 2 - Technical 

(4 Questions)

  • Q1. In which are u have sound knowledge ? Field or system
  • Q2. Difference between DCS and plc
  • Ans. 

    DCS is used for continuous processes while PLC is used for discrete processes.

    • DCS stands for Distributed Control System and is used for continuous processes like oil refining, power generation, etc.

    • PLC stands for Programmable Logic Controller and is used for discrete processes like assembly lines, packaging machines, etc.

    • DCS is designed to handle large amounts of data from multiple sources and control multiple processe...

  • Answered by AI
  • Q3. How control valve works
  • Ans. 

    Control valves regulate fluid flow by adjusting the size of the valve opening.

    • Control valves are used in various industries such as oil and gas, chemical, and power generation.

    • They work by adjusting the size of the valve opening to regulate the flow of fluid.

    • The valve opening is controlled by a signal from a controller, which can be manual or automated.

    • Control valves can be classified into different types such as globe...

  • Answered by AI
  • Q4. How pressure switch works
  • Ans. 

    A pressure switch is a device that monitors pressure levels and triggers an action when a certain pressure is reached.

    • Pressure switch consists of a sensing element, switch mechanism, and a pressure port.

    • When the pressure reaches a certain level, the sensing element triggers the switch mechanism to open or close an electrical circuit.

    • Pressure switches are used in various applications such as HVAC systems, water pumps, a

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - For apptitude my approach was not to attempt all questions but ensure that whatever i am able to answer those are correct...hence i took my sweet time to answer each question.

Skills evaluated in this interview

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (86)

Assistant Manager Interview Questions & Answers

user image Azmeera Shankar

posted on 25 Oct 2017

I was interviewed before Oct 2016.

Interview Questionnaire 

2 Questions

  • Q1.  turbine erection alignment and comissioning procedure
  • Ans. 

    Turbine erection alignment and commissioning procedure involves the process of aligning and commissioning a turbine for optimal performance.

    • Turbine erection alignment involves ensuring the turbine is properly aligned with the foundation and other components.

    • Commissioning procedure includes testing and verifying the functionality of the turbine.

    • Alignment is typically done using laser alignment tools to ensure precise po...

  • Answered by AI
  • Q2. Turbine erection sequence
  • Ans. 

    The turbine erection sequence refers to the specific order in which the components of a turbine are assembled and installed.

    • The foundation is prepared and the anchor bolts are installed.

    • The base frame is positioned and aligned with the anchor bolts.

    • The turbine tower sections are lifted and assembled on top of the base frame.

    • The nacelle, which houses the turbine's generator and other components, is installed on top of t...

  • Answered by AI

Interview Preparation Tips

Round: HR Interview
Experience: they are satisfy with my answers
Tips: explain exactly what you know

Round: Technical Interview
Experience: i explain what i know exactly

Skills: Thermal Power Plant Engineering

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (86)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - Technical 

(4 Questions)

  • Q1. The Electrical technician job description entails participating in independent maintenance related training activities organized by the field operations teams and coordinating shutdowns to ensure that ...
  • Q2. Commercial and Industrial Electrical Maintenance is the process of regularly inspecting, testing, cleaning, and repairing electrical systems and components to ensure they are safe and functioning Prope...
  • Q3. The technician’s role also includes participating in planning, ensuring effective spare parts management, and supervising continuous project improvement.
  • Q4. Electrical technicians perform various functions, depending on the particular operations of the company or organization they work with. However, their role is majorly to ensure effective repairs and mainte...

Interview Preparation Tips

Interview preparation tips for other job seekers - Electrical safety
Power suppliers
Electrical troubleshooting
PLC Electrical control panel
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Dec 2024. There were 2 interview rounds.

Round 1 - Assignment 

Proper reconciliation weakly and monthly Achive target

Round 2 - Technical 

(11 Questions)

  • Q1. All pendency work clear any way
  • Q2. Proper Quality with safty PPEs
  • Q3. Who to increase team for work
  • Q4. No leave without information
  • Q5. Achive your target
  • Q6. Completed target with time monthly
  • Q7. Performance with your senior is good and respected
  • Q8. Achive my target with time period
  • Q9. Maintain all work with Group discous
  • Q10. Achive target with Team work
  • Q11. Submitted data all with senior and company

Interview Preparation Tips

Interview preparation tips for other job seekers - Pls consider my Resume Dear mam's/ Sir

If there is any vacancy then please consider my resume.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Transmission Tower Detailing
  • Q2. Shop Drawing Bil of Meterial Tower Devlop & Re Devlop
  • Q3. Raice Chimney Drawing
  • Q4. Stub Template Prop Drawing
  • Q5. Structural Develop and Redevelop, Marking Erection Drawing , Bolts Nuts Grip Checking and Counting, Bill of Material , Shop Drawing Cad & Dxf and Shop Drawing Checking , Prop Drawing, Raise Chimney Transm...

Interview Preparation Tips

Interview preparation tips for other job seekers - Transmission Tower Detailing Shop Drawing Bill Of Meterial Tower Devlop & Re Devlop, RC, Prop
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. What was your experience like during the one-on-one interview with HR?
  • Q2. What types of questions will the manager ask?
Round 2 - One-on-one 

(2 Questions)

  • Q1. Can you explain your previous work experience?
  • Q2. Salary negotiable

Interview Preparation Tips

Interview preparation tips for other job seekers - Married women with kid should not join this company

Essar Projects India Interview FAQs

How many rounds are there in Essar Projects India interview?
Essar Projects India interview process usually has 2-3 rounds. The most common rounds in the Essar Projects India interview process are Aptitude Test, Technical and HR.
What are the top questions asked in Essar Projects India interview?

Some of the top questions asked at the Essar Projects India interview -

  1. turbine erection alignment and comissioning proced...read more
  2. How control valve wo...read more
  3. How pressure switch wo...read more

Tell us how to improve this page.

Essar Projects India Interview Process

based on 15 interviews

Interview experience

4.1
  
Good
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 412 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

Essar Projects India Reviews and Ratings

based on 289 reviews

3.7/5

Rating in categories

3.4

Skill development

3.6

Work-life balance

3.3

Salary

3.3

Job security

3.4

Company culture

3.0

Promotions

3.3

Work satisfaction

Explore 289 Reviews and Ratings
Assistant Manager
44 salaries
unlock blur

₹3 L/yr - ₹9 L/yr

Manager
33 salaries
unlock blur

₹6.3 L/yr - ₹15 L/yr

Deputy Manager
28 salaries
unlock blur

₹5 L/yr - ₹14 L/yr

Mechanical Engineer
18 salaries
unlock blur

₹10 L/yr - ₹23.7 L/yr

Deputy General Manager
11 salaries
unlock blur

₹15 L/yr - ₹25 L/yr

Explore more salaries
Compare Essar Projects India with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.2
Compare

Afcons Infrastructure

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview