Upload Button Icon Add office photos

Filter interviews by

Essar Projects India Deputy Manager Interview Questions and Answers

Updated 19 Jul 2024

Essar Projects India Deputy Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at School of Architecture CEPT, Ahmedabad and was interviewed before Jul 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Time bound test with logical reasoning & analytical skills

Round 2 - Group Discussion 

Which engineering discipline most important?

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jun 2024. There were 3 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Steel density, steel lap zone in column & beam, steel weight formula
  • Q2. Mivan shuttering, full plywood weight, table formwork
  • Q3. Excavation slope, aggregate density, cement density, mix design, compressive strength of cement & concrete, slump test,free flow concrete
Round 2 - BOQ 

(2 Questions)

  • Q1. Item wise rate analysis
  • Q2. How to manage lose Making item
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Reason of job change
  • Q2. Why I hire you
Round 2 - Technical 

(2 Questions)

  • Q1. Describe the work profile
  • Q2. Reconciliation process of Raw material
  • Ans. 

    Reconciliation process of raw material involves comparing the physical inventory with the recorded inventory to identify discrepancies.

    • Verify the accuracy of raw material receipts and usage records

    • Compare physical inventory counts with the recorded inventory levels

    • Investigate and resolve any discrepancies found

    • Update inventory records accordingly

    • Implement controls to prevent future discrepancies

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. How can we receive Materials to store and what is the basic procedure
  • Ans. 

    Materials can be received through purchase orders, deliveries, or transfers. The basic procedure involves receiving, inspecting, documenting, and storing the materials.

    • Materials can be received through purchase orders placed with suppliers.

    • Deliveries can be made directly to the storage location or to a designated receiving area.

    • Materials can also be received through transfers from other departments or locations.

    • The bas...

  • Answered by AI
  • Q2. Procedure of client material receipt/BOQ Items
  • Ans. 

    Client material receipt/BOQ items procedure involves thorough inspection, documentation, and verification.

    • Upon receipt of client materials, conduct thorough inspection for damages or discrepancies.

    • Document all received items in a log or system for tracking purposes.

    • Verify received items against the Bill of Quantities (BOQ) to ensure accuracy.

    • Report any issues or discrepancies to the relevant stakeholders for resolution...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2023. There were 2 interview rounds.

Round 1 - Group Discussion 

Discussion about my working and experience on site

Round 2 - HR 

(2 Questions)

  • Q1. How many structure in your last project?
  • Ans. 

    There were three main structures in my last project: a database structure, a software architecture structure, and a project management structure.

    • Database structure included tables, relationships, and indexes.

    • Software architecture structure involved layers, components, and modules.

    • Project management structure consisted of timelines, tasks, and resources.

  • Answered by AI
  • Q2. How many type foundation casting in your last project ?
  • Ans. 

    There were a total of 10 type foundation castings in my last project.

    • There were different types of foundation castings used in the project such as pile foundation, strip foundation, and raft foundation.

    • Each type of foundation casting was used based on the specific requirements of the structure and soil conditions.

    • The number of each type of foundation casting was determined by the structural design and engineering calcu

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Related to piping knowledge as per ASME Section
Round 2 - HR 

(1 Question)

  • Q1. Working culture and salary package

I applied via Referral and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. How many PTR engaged at BT laying
  • Ans. 

    I don't have the available data to answer this question.

    • Sorry, I don't have access to the current data on the number of PTR engaged at BT laying.

    • I suggest checking with the relevant department or team for the latest information.

  • Answered by AI
  • Q2. 2 nos are engaged at BT lalying
  • Q3. Crusher make model and process of crushing ?
  • Ans. 

    The crusher make model and process of crushing depend on the type of material being crushed.

    • The make and model of the crusher will vary depending on the application and material being crushed.

    • The process of crushing also varies depending on the material and desired output size.

    • For example, a jaw crusher may be used for primary crushing of hard rock, while a cone crusher is more suitable for secondary or tertiary crushi...

  • Answered by AI
  • Q4. Puzolona 300TPh

Interview Preparation Tips

Interview preparation tips for other job seekers - Concentrate on road construction equipments

I applied via Naukri.com and was interviewed in Jan 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Simple question which is mention in our resume.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared according to your c.v

I applied via Approached by Company and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Were your current company, salary
  • Q2. Which years expearance
  • Ans. 

    I have 5 years of experience in management roles.

    • I have worked as a team leader for 2 years.

    • I have been an assistant manager for 3 years.

    • During my time as an assistant manager, I was responsible for training new employees and managing schedules.

    • I have experience in budgeting and financial management.

    • I have also worked on various projects that involved cross-functional teams.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please don't join this company. Very very dangoures persons have this company. Future 100% spoil. Time waste. Politics 10000%. After work salary not give.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Jan 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Related to project life cycle and how to manage in intermediate levels
  • Q2. Regarding planning and programming procedures
Round 2 - Technical 

(2 Questions)

  • Q1. Regarding methodology of works handled
  • Q2. Regarding work responsibilities performed
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiations

Interview Preparation Tips

Interview preparation tips for other job seekers - It was a good experience

Essar Projects India Interview FAQs

How many rounds are there in Essar Projects India Deputy Manager interview?
Essar Projects India interview process usually has 2 rounds. The most common rounds in the Essar Projects India interview process are Aptitude Test and Group Discussion.

Tell us how to improve this page.

People are getting interviews through

based on 1 Essar Projects India interview
Campus Placement
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.
Essar Projects India Deputy Manager Salary
based on 28 salaries
₹5 L/yr - ₹14 L/yr
13% less than the average Deputy Manager Salary in India
View more details

Essar Projects India Deputy Manager Reviews and Ratings

based on 19 reviews

4.1/5

Rating in categories

3.7

Skill development

4.3

Work-Life balance

4.3

Salary & Benefits

3.8

Job Security

4.7

Company culture

3.2

Promotions/Appraisal

3.9

Work Satisfaction

Explore 19 Reviews and Ratings
Assistant Manager
44 salaries
unlock blur

₹3 L/yr - ₹9 L/yr

Manager
33 salaries
unlock blur

₹6.3 L/yr - ₹15 L/yr

Deputy Manager
28 salaries
unlock blur

₹5 L/yr - ₹14 L/yr

Mechanical Engineer
18 salaries
unlock blur

₹10 L/yr - ₹23.7 L/yr

Deputy General Manager
11 salaries
unlock blur

₹15 L/yr - ₹25 L/yr

Explore more salaries
Compare Essar Projects India with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.2
Compare

Afcons Infrastructure

4.3
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview