I applied via Campus Placement and was interviewed before Feb 2021. There were 2 interview rounds.
3 tests are conducted
DCS is used for continuous processes while PLC is used for discrete processes.
DCS stands for Distributed Control System and is used for continuous processes like oil refining, power generation, etc.
PLC stands for Programmable Logic Controller and is used for discrete processes like assembly lines, packaging machines, etc.
DCS is designed to handle large amounts of data from multiple sources and control multiple processe...
Control valves regulate fluid flow by adjusting the size of the valve opening.
Control valves are used in various industries such as oil and gas, chemical, and power generation.
They work by adjusting the size of the valve opening to regulate the flow of fluid.
The valve opening is controlled by a signal from a controller, which can be manual or automated.
Control valves can be classified into different types such as globe...
A pressure switch is a device that monitors pressure levels and triggers an action when a certain pressure is reached.
Pressure switch consists of a sensing element, switch mechanism, and a pressure port.
When the pressure reaches a certain level, the sensing element triggers the switch mechanism to open or close an electrical circuit.
Pressure switches are used in various applications such as HVAC systems, water pumps, a
I appeared for an interview before Oct 2016.
Turbine erection alignment and commissioning procedure involves the process of aligning and commissioning a turbine for optimal performance.
Turbine erection alignment involves ensuring the turbine is properly aligned with the foundation and other components.
Commissioning procedure includes testing and verifying the functionality of the turbine.
Alignment is typically done using laser alignment tools to ensure precise po...
The turbine erection sequence refers to the specific order in which the components of a turbine are assembled and installed.
The foundation is prepared and the anchor bolts are installed.
The base frame is positioned and aligned with the anchor bolts.
The turbine tower sections are lifted and assembled on top of the base frame.
The nacelle, which houses the turbine's generator and other components, is installed on top of t...
Essar Projects India interview questions for designations
Top trending discussions
posted on 12 Jul 2022
I applied via Campus Placement and was interviewed before Jul 2021. There were 2 interview rounds.
Computer aptitude test
I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.
posted on 11 May 2018
I appeared for an interview before Mar 2020.
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
posted on 12 Oct 2020
I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.
based on 4 interviews
Interview experience
based on 33 reviews
Rating in categories
Assistant Manager
44
salaries
| ₹3 L/yr - ₹9 L/yr |
Manager
33
salaries
| ₹6.3 L/yr - ₹15 L/yr |
Deputy Manager
30
salaries
| ₹5 L/yr - ₹14 L/yr |
Mechanical Engineer
17
salaries
| ₹11.9 L/yr - ₹14.2 L/yr |
Deputy General Manager
11
salaries
| ₹15 L/yr - ₹25 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Kalpataru Projects International