Upload Button Icon Add office photos

L&T Construction

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

L&T Construction Assistant Manager Operations Interview Questions, Process, and Tips

Updated 2 Mar 2025

L&T Construction Assistant Manager Operations Interview Experiences

1 interview found

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
4-6 weeks
Result
Selected Selected

I was interviewed in Sep 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the density of pu
  • Ans. 

    The density of pu is 19.84 g/cm³.

    • The density of pu is 19.84 grams per cubic centimeter.

    • Density is a measure of how much mass is contained in a given volume.

    • Pu likely refers to plutonium, a radioactive element with a high density.

    • Density can be calculated by dividing the mass of an object by its volume.

  • Answered by AI
  • Q2. Tell me the method statment
  • Ans. 

    A method statement is a document that outlines the steps and procedures for completing a specific task or project.

    • Clearly define the scope of work

    • Identify the resources required

    • Outline the sequence of activities

    • Specify any safety precautions

    • Include quality control measures

    • Provide a timeline for completion

  • Answered by AI
Round 2 - Aptitude Test 

What about the share market

Round 3 - Technical 

(2 Questions)

  • Q1. What do you decide in basment waterproofing
  • Ans. 

    In basement waterproofing, decisions are made regarding the best methods and materials to prevent water damage and leakage in basements.

    • Assessing the source of water infiltration

    • Choosing the appropriate waterproofing method (e.g. interior or exterior)

    • Selecting the right materials for waterproofing (e.g. sealants, membranes)

    • Considering factors like soil type, drainage, and foundation condition

    • Determining if additional m...

  • Answered by AI
  • Q2. What do you decide on terrace water proofing
  • Ans. 

    Terrace water proofing decision is based on factors like budget, climate, type of terrace, and quality of materials.

    • Consider the budget available for water proofing

    • Take into account the climate of the area to choose appropriate materials

    • Evaluate the type of terrace (flat, sloped, etc.) to determine the best water proofing method

    • Research and select high-quality water proofing materials for long-lasting results

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Learn the tds and method statmentd

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
No response

I applied via Job Portal and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical,experience level
Round 3 - HR 

(1 Question)

  • Q1. Flexibility,Location,Reason for job change

I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Interviewer asked me about last activity process , material quality, more technical questions, and cost analysis of last projects.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majority a stress test.it lasted about 1hr 45 minutes.i tried to answer every question with example.

Interview Questionnaire 

3 Questions

  • Q1. PSC girder
  • Q2. Minor bridge
  • Q3. Related

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. Excavation safety, EHS management, Lifting & Erection safety

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to explain basic concepts clearly

I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions relating to our job in deep. That's it

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever you know about say genuinely and be confident always. Don't hesitate at all.
Put your thoughts clearly.

I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Machinery maintenance Dpr maintenance,local purchasing,

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice,good and teritical intrew done and completed

Interview Questionnaire 

3 Questions

  • Q1. Basically questions related to power distribution field & some of college courses.
  • Q2. In this round questions basically related to management & technical composition.
  • Q3. He only asked your previous n current financial requirements as per your interview.

I applied via Company Website and was interviewed in May 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What is MPLS and flow of labels in MPLS
  • Ans. 

    MPLS is a protocol used for efficient packet forwarding. It uses labels to identify paths instead of IP addresses.

    • MPLS stands for Multiprotocol Label Switching

    • Labels are assigned to packets at the ingress router

    • Labels are used to identify the path a packet should take through the network

    • Labels are swapped at each MPLS router along the path

    • The last MPLS router removes the label and forwards the packet based on the IP ad...

  • Answered by AI
  • Q2. What is route reflector in BGP
  • Ans. 

    Route reflector is a BGP feature that allows a router to advertise routes to its clients without requiring full mesh connectivity.

    • Route reflector reduces the number of iBGP peerings required in a network.

    • It helps in scaling the network by reducing the number of updates and processing required.

    • Route reflector can be configured in a hierarchical manner to further reduce the number of iBGP peerings.

    • It is commonly used in ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for the role or profile for which you are applying. Brushup basics about all the topics for your role

Skills evaluated in this interview

Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Based on experience and problem faced in project site
  • Q2. Previous site experience and the benifits
  • Q3. Roles and responsibilities of self and the factors affecting company growth

Interview Preparation Tips

Interview preparation tips for other job seekers - don't join in this black hole it is just like company there are no projects for this company the culture is so worst.
Contribute & help others!
anonymous
You can choose to be anonymous

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Assistant Manager Operations interview?
L&T Construction interview process usually has 3 rounds. The most common rounds in the L&T Construction interview process are Technical and Aptitude Test.
What are the top questions asked in L&T Construction Assistant Manager Operations interview?

Some of the top questions asked at the L&T Construction Assistant Manager Operations interview -

  1. What do you decide in basment waterproof...read more
  2. What do you decide on terrace water proof...read more
  3. What is the density of...read more

Recently Viewed

PHOTOS

InsuranceDekho

3 office photos

LIST OF COMPANIES

Credit Bajaar

Overview

INTERVIEWS

Sundaram Clayton

No Interviews

INTERVIEWS

Sundaram Clayton

No Interviews

INTERVIEWS

Akamai Technologies

No Interviews

INTERVIEWS

L&T Construction

No Interviews

INTERVIEWS

Akamai Technologies

No Interviews

INTERVIEWS

L&T Construction

No Interviews

INTERVIEWS

Sundaram Clayton

No Interviews

INTERVIEWS

Akamai Technologies

No Interviews

Tell us how to improve this page.

L&T Construction Assistant Manager Operations Interview Process

based on 3 interviews

Interview experience

3.7
  
Good
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 424 Interviews
Dilip Buildcon Interview Questions
4.0
 • 140 Interviews
G R Infraprojects Interview Questions
4.1
 • 132 Interviews
AtkinsRealis Interview Questions
4.0
 • 85 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
View all
L&T Construction Assistant Manager Operations Salary
based on 17 salaries
₹7.2 L/yr - ₹17 L/yr
58% more than the average Assistant Manager Operations Salary in India
View more details

L&T Construction Assistant Manager Operations Reviews and Ratings

based on 8 reviews

3.9/5

Rating in categories

3.1

Skill development

2.1

Work-life balance

3.3

Salary

4.0

Job security

2.9

Company culture

3.2

Promotions

2.7

Work satisfaction

Explore 8 Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
703 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Construction Manager
504 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
393 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineering Manager
323 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent