Q1. turbine erection alignment and comissioning procedure

Ans.

Turbine erection alignment and commissioning procedure involves the process of aligning and commissioning a turbine for optimal performance.

  • Turbine erection alignment involves ensuring the turbine is properly aligned with the foundation and other components.

  • Commissioning procedure includes testing and verifying the functionality of the turbine.

  • Alignment is typically done using laser alignment tools to ensure precise positioning.

  • Commissioning involves conducting performance te...read more

Add your answer

Q2. What is the process for calculating HVAC (Heating, Ventilation, and Air Conditioning) requirements?

Ans.

The process for calculating HVAC requirements involves determining the heating and cooling loads for a space based on factors like size, insulation, occupancy, and climate.

  • Calculate the heating load by considering factors such as the size of the space, insulation levels, number of occupants, and desired temperature.

  • Calculate the cooling load by taking into account factors like solar heat gain, equipment heat output, and ventilation requirements.

  • Use software tools like Manual ...read more

Add your answer

Q3. How control valve works

Ans.

Control valves regulate fluid flow by adjusting the size of the valve opening.

  • Control valves are used in various industries such as oil and gas, chemical, and power generation.

  • They work by adjusting the size of the valve opening to regulate the flow of fluid.

  • The valve opening is controlled by a signal from a controller, which can be manual or automated.

  • Control valves can be classified into different types such as globe, butterfly, and ball valves.

  • They can also have different ...read more

Add your answer

Q4. How pressure switch works

Ans.

A pressure switch is a device that monitors pressure levels and triggers an action when a certain pressure is reached.

  • Pressure switch consists of a sensing element, switch mechanism, and a pressure port.

  • When the pressure reaches a certain level, the sensing element triggers the switch mechanism to open or close an electrical circuit.

  • Pressure switches are used in various applications such as HVAC systems, water pumps, and air compressors.

Add your answer
Discover Sree Ji Sai Plast Ind. interview dos and don'ts from real experiences

Q5. What types of filters are used in bag filters?

Ans.

Bag filters typically use fabric filters, cartridge filters, and HEPA filters.

  • Fabric filters are commonly used in bag filters to capture larger particles.

  • Cartridge filters are used to capture smaller particles that may pass through fabric filters.

  • HEPA filters are high-efficiency filters used for capturing very fine particles and allergens.

  • Bag filters may also use activated carbon filters for odor control or gas removal.

Add your answer

Q6. Difference between DCS and plc

Ans.

DCS is used for continuous processes while PLC is used for discrete processes.

  • DCS stands for Distributed Control System and is used for continuous processes like oil refining, power generation, etc.

  • PLC stands for Programmable Logic Controller and is used for discrete processes like assembly lines, packaging machines, etc.

  • DCS is designed to handle large amounts of data from multiple sources and control multiple processes simultaneously.

  • PLC is designed to handle simple logic op...read more

Add your answer
Are these interview questions helpful?

Q7. turbine erection sequence

Ans.

The turbine erection sequence refers to the specific order in which the components of a turbine are assembled and installed.

  • The foundation is prepared and the anchor bolts are installed.

  • The base frame is positioned and aligned with the anchor bolts.

  • The turbine tower sections are lifted and assembled on top of the base frame.

  • The nacelle, which houses the turbine's generator and other components, is installed on top of the tower.

  • The rotor, including the blades, is mounted on th...read more

Add your answer

Q8. What is absolute humidity?

Ans.

Absolute humidity is the measure of water vapor in the air regardless of temperature.

  • Absolute humidity is the actual amount of water vapor present in a unit volume of air.

  • It is expressed in grams of water vapor per cubic meter of air.

  • Unlike relative humidity, absolute humidity does not change with temperature.

  • Absolute humidity is an important factor in determining air quality and comfort levels.

  • For example, a room with high absolute humidity may feel muggy and uncomfortable.

Add your answer
Share interview questions and help millions of jobseekers 🌟

Q9. What is ESHF in HVAC?

Ans.

ESHF stands for Energy Saving Heat Recovery in HVAC systems.

  • ESHF is a technology used in HVAC systems to recover waste heat and reuse it to improve energy efficiency.

  • It helps in reducing energy consumption and operating costs of HVAC systems.

  • Examples of ESHF technologies include heat exchangers, heat pumps, and thermal storage systems.

Add your answer

Q10. Time limited vs resource limited

Ans.

Time limited projects have fixed deadlines while resource limited projects have fixed resources.

  • Time limited projects require completion by a specific deadline.

  • Resource limited projects have a fixed amount of resources available.

  • Balancing time and resources is crucial for project success.

  • Example: A construction project with a deadline to finish before winter (time limited) vs a project with a fixed budget (resource limited).

Add your answer

Q11. Free float vs Total Float

Ans.

Free float is the amount of time an activity can be delayed without delaying the project, while total float is the amount of time an activity can be delayed without delaying the successor activity.

  • Free float is specific to an activity, while total float is related to the entire project schedule.

  • Free float is calculated by subtracting the early start of the activity from the early start of the successor activity, while total float is calculated by subtracting the early start o...read more

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Sree Ji Sai Plast Ind.

based on 16 interviews
Interview experience
4.2
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

4.1
 • 383 Interview Questions
4.1
 • 217 Interview Questions
3.8
 • 208 Interview Questions
3.8
 • 167 Interview Questions
4.2
 • 155 Interview Questions
3.3
 • 154 Interview Questions
View all
Top Essar Projects India Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
75 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter