G R Infraprojects Structural Engineer Interview Questions and Answers

Updated 27 Mar 2024

7 Interview questions

A Structural Engineer was asked
Q. What is the process of making a PSC Girder?
Ans. 

The process of making PSC girder involves preparing the concrete mix, casting the girder in a formwork, curing, and testing for quality.

  • Prepare the concrete mix with a specific ratio of cement, aggregates, and water.

  • Pour the mix into a formwork that is designed to the shape and size of the girder.

  • Place prestressed steel strands or bars in the formwork before pouring the concrete to provide strength.

  • Cure the girder...

A Structural Engineer was asked
Q. What is the socketing length in a pile foundation?
Ans. 

Socketing length in pile refers to the length of the pile that is embedded into the rock or hard strata to provide additional support and stability.

  • Socketing length is determined based on the strength and stability of the rock or strata at the pile tip.

  • It helps in transferring the load from the pile to the rock or hard strata, increasing the overall capacity of the pile.

  • Socketing length can vary depending on the s...

Structural Engineer Interview Questions Asked at Other Companies

asked in WSP
Q1. How moment is transfer from beam to column, In I section what is ... read more
Q2. 1. Find weight and COG of an irrrgular shape. Unit weight of memb ... read more
Q3. What should be the height of the Tremie pipe from the pile foundi ... read more
asked in Bechtel
Q4. Explain your recent work in detail, from the initial stage to the ... read more
Q5. How much cement is used to make 1m³ of concrete?
A Structural Engineer was asked
Q. Which codes are used for structural engineering?
Ans. 

Various codes are used in structural engineering to ensure safety and compliance with regulations.

  • International Building Code (IBC)

  • American Society of Civil Engineers (ASCE) standards

  • American Concrete Institute (ACI) standards

  • American Institute of Steel Construction (AISC) standards

  • Eurocode

  • National Building Code of Canada (NBCC)

A Structural Engineer was asked
Q. Which formula is used to calculate the elongation of a PSC Girder?
Ans. 

The formula used to calculate the elongation of PSC Girder is based on the modulus of elasticity and the change in length.

  • The formula for calculating elongation is: Elongation = (Load x Length) / (Modulus of Elasticity x Area)

  • Modulus of Elasticity is a measure of a material's stiffness and is specific to the material used in the PSC Girder

  • The change in length is the difference between the original length and the l...

A Structural Engineer was asked
Q. What is the role of bearings in bridges?
Ans. 

Bearings in bridges help distribute loads and allow for movement due to temperature changes and seismic activity.

  • Bearings help distribute the loads from the bridge deck to the substructure, reducing stress on the bridge components.

  • Bearings allow for movement of the bridge deck due to temperature changes, seismic activity, and other factors.

  • Different types of bearings include elastomeric bearings, pot bearings, and...

A Structural Engineer was asked
Q. What should be the height of the Tremie pipe from the pile founding level during concrete pouring?
Ans. 

The height of Tremie pipe from pile founding level during concrete should be maintained at a certain level to ensure proper placement of concrete.

  • The Tremie pipe should typically be kept at a height of 1-2 meters above the pile founding level to prevent segregation of concrete.

  • Maintaining the correct height ensures that the concrete flows smoothly through the pipe and fills the pile without any gaps or voids.

  • Adjus...

A Structural Engineer was asked
Q. Type of pile , why we provide pile,pile dia , lvup vup svup type questions
Ans. 

Piles are used in construction to transfer loads from a structure to a stronger layer of soil or rock below the surface.

  • Types of piles include driven piles, bored piles, and screw piles.

  • Piles are provided to support structures on weak or compressible soil, to resist uplift forces, or to provide lateral support.

  • The diameter of a pile is determined based on the load it needs to support and the soil conditions.

  • LVUP (...

Are these interview questions helpful?

G R Infraprojects Structural Engineer Interview Experiences

4 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. What should be the height of Tremie pipe from pile founding level during concrete?
  • Ans. 

    The height of Tremie pipe from pile founding level during concrete should be maintained at a certain level to ensure proper placement of concrete.

    • The Tremie pipe should typically be kept at a height of 1-2 meters above the pile founding level to prevent segregation of concrete.

    • Maintaining the correct height ensures that the concrete flows smoothly through the pipe and fills the pile without any gaps or voids.

    • Adjustment...

  • Answered by AI
  • Q2. Which all codes are used for structure engineering ?
  • Ans. 

    Various codes are used in structural engineering to ensure safety and compliance with regulations.

    • International Building Code (IBC)

    • American Society of Civil Engineers (ASCE) standards

    • American Concrete Institute (ACI) standards

    • American Institute of Steel Construction (AISC) standards

    • Eurocode

    • National Building Code of Canada (NBCC)

  • Answered by AI
  • Q3. What is the role of bearings in Bridges?
  • Ans. 

    Bearings in bridges help distribute loads and allow for movement due to temperature changes and seismic activity.

    • Bearings help distribute the loads from the bridge deck to the substructure, reducing stress on the bridge components.

    • Bearings allow for movement of the bridge deck due to temperature changes, seismic activity, and other factors.

    • Different types of bearings include elastomeric bearings, pot bearings, and slid...

  • Answered by AI
  • Q4. Which formula is used to calculate the elongation of PSC Girder?
  • Ans. 

    The formula used to calculate the elongation of PSC Girder is based on the modulus of elasticity and the change in length.

    • The formula for calculating elongation is: Elongation = (Load x Length) / (Modulus of Elasticity x Area)

    • Modulus of Elasticity is a measure of a material's stiffness and is specific to the material used in the PSC Girder

    • The change in length is the difference between the original length and the length...

  • Answered by AI
  • Q5. What is the Process of Making PSC Girder?
  • Ans. 

    The process of making PSC girder involves preparing the concrete mix, casting the girder in a formwork, curing, and testing for quality.

    • Prepare the concrete mix with a specific ratio of cement, aggregates, and water.

    • Pour the mix into a formwork that is designed to the shape and size of the girder.

    • Place prestressed steel strands or bars in the formwork before pouring the concrete to provide strength.

    • Cure the girder by m...

  • Answered by AI
  • Q6. What is socketing length in Pile?
  • Ans. 

    Socketing length in pile refers to the length of the pile that is embedded into the rock or hard strata to provide additional support and stability.

    • Socketing length is determined based on the strength and stability of the rock or strata at the pile tip.

    • It helps in transferring the load from the pile to the rock or hard strata, increasing the overall capacity of the pile.

    • Socketing length can vary depending on the site c...

  • Answered by AI
Round 3 - HR 

(4 Questions)

  • Q1. Why do you want to leave your previous Job?
  • Q2. Are you ready to relocate ?
  • Q3. How much salary do you expect?
  • Q4. Tell me am Example when you did Team Work.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared for the answer like your Job change decision with strong reason. And before appearing any Interview, Read all the notes , which all you prepared Earlier. And one more thing, read about the topic for which you have applied specially and about the company as well.

Structural Engineer Interview Questions & Answers

user image Deepak Kashyap

posted on 4 Apr 2021

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

Interview Questionnaire 

2 Questions

  • Q1. Type of pile , why we provide pile,pile dia , lvup vup svup type questions
  • Ans. 

    Piles are used in construction to transfer loads from a structure to a stronger layer of soil or rock below the surface.

    • Types of piles include driven piles, bored piles, and screw piles.

    • Piles are provided to support structures on weak or compressible soil, to resist uplift forces, or to provide lateral support.

    • The diameter of a pile is determined based on the load it needs to support and the soil conditions.

    • LVUP (Large...

  • Answered by AI
  • Q2. Mostly we use two types of pile (1) friction pile (2)end bearing pile

Interview Preparation Tips

Interview preparation tips for other job seekers - Please read MORTH AN

I appeared for an interview in Apr 2021.

Interview Preparation Tips

Interview preparation tips for other job seekers - Face to face interview and clean communication

Interview Questionnaire 

1 Question

  • Q1. Regarding our practical experience

Top trending discussions

View All
Interview Tips & Stories
1w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about G R Infraprojects?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Question about material reconciliation, allowable wastage question based on previous work experience
  • Q2. It's not easy to describe it in a few words because of the interview time is more

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare point base answer what u have done in ur present service and what u r going to offer them by considering a technical aspects

I appeared for an interview before Jul 2016.

Interview Preparation Tips

Round: Group Discussion
Duration: 4 hours 5 minutes

Round: Test
Duration: 2 hours 5 minutes

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)
Are these interview questions helpful?

I appeared for an interview before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

Interview Questionnaire 

1 Question

  • Q1. Technical question

I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is the most challenging situation you have been through in your career?
  • Ans. 

    I faced a critical project deadline with unexpected technical challenges, requiring quick problem-solving and team collaboration.

    • Led a team during a major software deployment that faced unexpected bugs just days before launch.

    • Implemented a rapid response strategy, organizing daily stand-ups to address issues in real-time.

    • Collaborated with cross-functional teams to identify root causes and develop effective solutions.

    • Su...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - To ace an interview you need to be a good listener as much as a good speaker. Try to listen and understand what the interviewer is asking and then reply. Never be in a hurry to answer, take time. If you did not understand what interviewer is asking simply ask him to repeat, pls don't presume anything and answer anything that comes to your mind. Most importantly never fake in an interview just try to be your best...

G R Infraprojects Interview FAQs

How many rounds are there in G R Infraprojects Structural Engineer interview?
G R Infraprojects interview process usually has 3 rounds. The most common rounds in the G R Infraprojects interview process are Resume Shortlist, Technical and HR.
How to prepare for G R Infraprojects Structural Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at G R Infraprojects. The most common topics and skills that interviewers at G R Infraprojects expect are AutoCAD, Staad Pro, Structural, Structural Design and marine.
What are the top questions asked in G R Infraprojects Structural Engineer interview?

Some of the top questions asked at the G R Infraprojects Structural Engineer interview -

  1. What should be the height of Tremie pipe from pile founding level during concr...read more
  2. Which formula is used to calculate the elongation of PSC Gird...read more
  3. Which all codes are used for structure engineerin...read more

Tell us how to improve this page.

Overall Interview Experience Rating

5/5

based on 2 interview experiences

Difficulty level

Moderate 100%

Duration

Less than 2 weeks 100%
View more
G R Infraprojects Structural Engineer Salary
based on 114 salaries
₹2 L/yr - ₹6.3 L/yr
32% less than the average Structural Engineer Salary in India
View more details

G R Infraprojects Structural Engineer Reviews and Ratings

based on 40 reviews

3.5/5

Rating in categories

3.6

Skill development

3.3

Work-life balance

3.5

Salary

3.3

Job security

3.4

Company culture

3.6

Promotions

3.6

Work satisfaction

Explore 40 Reviews and Ratings
Assistant Manager
402 salaries
unlock blur

₹4.4 L/yr - ₹11.5 L/yr

Senior Engineer
226 salaries
unlock blur

₹3.7 L/yr - ₹8.6 L/yr

Deputy Manager
152 salaries
unlock blur

₹6.6 L/yr - ₹16.9 L/yr

Engineer
138 salaries
unlock blur

₹2.2 L/yr - ₹5.6 L/yr

Structural Engineer
114 salaries
unlock blur

₹2 L/yr - ₹6.3 L/yr

Explore more salaries
Compare G R Infraprojects with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
write
Share an Interview