The process of making PSC girder involves preparing the concrete mix, casting the girder in a formwork, curing, and testing for quality.
Prepare the concrete mix with a specific ratio of cement, aggregates, and water.
Pour the mix into a formwork that is designed to the shape and size of the girder.
Place prestressed steel strands or bars in the formwork before pouring the concrete to provide strength.
Cure the girder...
Socketing length in pile refers to the length of the pile that is embedded into the rock or hard strata to provide additional support and stability.
Socketing length is determined based on the strength and stability of the rock or strata at the pile tip.
It helps in transferring the load from the pile to the rock or hard strata, increasing the overall capacity of the pile.
Socketing length can vary depending on the s...
Various codes are used in structural engineering to ensure safety and compliance with regulations.
International Building Code (IBC)
American Society of Civil Engineers (ASCE) standards
American Concrete Institute (ACI) standards
American Institute of Steel Construction (AISC) standards
Eurocode
National Building Code of Canada (NBCC)
The formula used to calculate the elongation of PSC Girder is based on the modulus of elasticity and the change in length.
The formula for calculating elongation is: Elongation = (Load x Length) / (Modulus of Elasticity x Area)
Modulus of Elasticity is a measure of a material's stiffness and is specific to the material used in the PSC Girder
The change in length is the difference between the original length and the l...
Bearings in bridges help distribute loads and allow for movement due to temperature changes and seismic activity.
Bearings help distribute the loads from the bridge deck to the substructure, reducing stress on the bridge components.
Bearings allow for movement of the bridge deck due to temperature changes, seismic activity, and other factors.
Different types of bearings include elastomeric bearings, pot bearings, and...
The height of Tremie pipe from pile founding level during concrete should be maintained at a certain level to ensure proper placement of concrete.
The Tremie pipe should typically be kept at a height of 1-2 meters above the pile founding level to prevent segregation of concrete.
Maintaining the correct height ensures that the concrete flows smoothly through the pipe and fills the pile without any gaps or voids.
Adjus...
Piles are used in construction to transfer loads from a structure to a stronger layer of soil or rock below the surface.
Types of piles include driven piles, bored piles, and screw piles.
Piles are provided to support structures on weak or compressible soil, to resist uplift forces, or to provide lateral support.
The diameter of a pile is determined based on the load it needs to support and the soil conditions.
LVUP (...
I applied via Walk-in and was interviewed before Sep 2022. There were 3 interview rounds.
The height of Tremie pipe from pile founding level during concrete should be maintained at a certain level to ensure proper placement of concrete.
The Tremie pipe should typically be kept at a height of 1-2 meters above the pile founding level to prevent segregation of concrete.
Maintaining the correct height ensures that the concrete flows smoothly through the pipe and fills the pile without any gaps or voids.
Adjustment...
Various codes are used in structural engineering to ensure safety and compliance with regulations.
International Building Code (IBC)
American Society of Civil Engineers (ASCE) standards
American Concrete Institute (ACI) standards
American Institute of Steel Construction (AISC) standards
Eurocode
National Building Code of Canada (NBCC)
Bearings in bridges help distribute loads and allow for movement due to temperature changes and seismic activity.
Bearings help distribute the loads from the bridge deck to the substructure, reducing stress on the bridge components.
Bearings allow for movement of the bridge deck due to temperature changes, seismic activity, and other factors.
Different types of bearings include elastomeric bearings, pot bearings, and slid...
The formula used to calculate the elongation of PSC Girder is based on the modulus of elasticity and the change in length.
The formula for calculating elongation is: Elongation = (Load x Length) / (Modulus of Elasticity x Area)
Modulus of Elasticity is a measure of a material's stiffness and is specific to the material used in the PSC Girder
The change in length is the difference between the original length and the length...
The process of making PSC girder involves preparing the concrete mix, casting the girder in a formwork, curing, and testing for quality.
Prepare the concrete mix with a specific ratio of cement, aggregates, and water.
Pour the mix into a formwork that is designed to the shape and size of the girder.
Place prestressed steel strands or bars in the formwork before pouring the concrete to provide strength.
Cure the girder by m...
Socketing length in pile refers to the length of the pile that is embedded into the rock or hard strata to provide additional support and stability.
Socketing length is determined based on the strength and stability of the rock or strata at the pile tip.
It helps in transferring the load from the pile to the rock or hard strata, increasing the overall capacity of the pile.
Socketing length can vary depending on the site c...
Piles are used in construction to transfer loads from a structure to a stronger layer of soil or rock below the surface.
Types of piles include driven piles, bored piles, and screw piles.
Piles are provided to support structures on weak or compressible soil, to resist uplift forces, or to provide lateral support.
The diameter of a pile is determined based on the load it needs to support and the soil conditions.
LVUP (Large...
I appeared for an interview in Apr 2021.
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.
posted on 14 Jul 2017
I appeared for an interview before Jul 2016.
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 10 Sep 2017
I appeared for an interview before Sep 2016.
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
I faced a critical project deadline with unexpected technical challenges, requiring quick problem-solving and team collaboration.
Led a team during a major software deployment that faced unexpected bugs just days before launch.
Implemented a rapid response strategy, organizing daily stand-ups to address issues in real-time.
Collaborated with cross-functional teams to identify root causes and develop effective solutions.
Su...
Some of the top questions asked at the G R Infraprojects Structural Engineer interview -
based on 2 interview experiences
Difficulty level
Duration
based on 40 reviews
Rating in categories
Assistant Manager
402
salaries
| ₹4.4 L/yr - ₹11.5 L/yr |
Senior Engineer
226
salaries
| ₹3.7 L/yr - ₹8.6 L/yr |
Deputy Manager
152
salaries
| ₹6.6 L/yr - ₹16.9 L/yr |
Engineer
138
salaries
| ₹2.2 L/yr - ₹5.6 L/yr |
Structural Engineer
114
salaries
| ₹2 L/yr - ₹6.3 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures