I applied via Walk-in and was interviewed before Sep 2022. There were 3 interview rounds.
The height of Tremie pipe from pile founding level during concrete should be maintained at a certain level to ensure proper placement of concrete.
The Tremie pipe should typically be kept at a height of 1-2 meters above the pile founding level to prevent segregation of concrete.
Maintaining the correct height ensures that the concrete flows smoothly through the pipe and fills the pile without any gaps or voids.
Adjustment...
Various codes are used in structural engineering to ensure safety and compliance with regulations.
International Building Code (IBC)
American Society of Civil Engineers (ASCE) standards
American Concrete Institute (ACI) standards
American Institute of Steel Construction (AISC) standards
Eurocode
National Building Code of Canada (NBCC)
Bearings in bridges help distribute loads and allow for movement due to temperature changes and seismic activity.
Bearings help distribute the loads from the bridge deck to the substructure, reducing stress on the bridge components.
Bearings allow for movement of the bridge deck due to temperature changes, seismic activity, and other factors.
Different types of bearings include elastomeric bearings, pot bearings, and slid...
The formula used to calculate the elongation of PSC Girder is based on the modulus of elasticity and the change in length.
The formula for calculating elongation is: Elongation = (Load x Length) / (Modulus of Elasticity x Area)
Modulus of Elasticity is a measure of a material's stiffness and is specific to the material used in the PSC Girder
The change in length is the difference between the original length and the length...
The process of making PSC girder involves preparing the concrete mix, casting the girder in a formwork, curing, and testing for quality.
Prepare the concrete mix with a specific ratio of cement, aggregates, and water.
Pour the mix into a formwork that is designed to the shape and size of the girder.
Place prestressed steel strands or bars in the formwork before pouring the concrete to provide strength.
Cure the girder by m...
Socketing length in pile refers to the length of the pile that is embedded into the rock or hard strata to provide additional support and stability.
Socketing length is determined based on the strength and stability of the rock or strata at the pile tip.
It helps in transferring the load from the pile to the rock or hard strata, increasing the overall capacity of the pile.
Socketing length can vary depending on the site c...
Work related questions
I have a strong background in railway OHE engineering with experience in design, installation, and maintenance.
Experience in designing overhead electrification systems for railways
Knowledge of installation procedures and safety regulations
Experience in maintenance and troubleshooting of OHE systems
Familiarity with relevant software and tools such as AutoCAD and PLS-CADD
Strong understanding of electrical engineering pri
G R Infraprojects interview questions for popular designations
I was interviewed in Jan 2025.
The number of beam lapping zones depends on the specific design and requirements of the project.
Beam lapping zones are typically determined based on structural requirements and load distribution.
The number of beam zones can vary based on factors such as beam size, material, and span length.
Consulting structural engineers and design specifications can help determine the appropriate number of beam lapping zones.
Overlap is the area where two VDF flooring sections meet, while confined zone is the area where the VDF flooring is contained during casting process.
Overlap is the junction between two VDF flooring sections, ensuring seamless connection.
Confined zone is the area where VDF flooring is poured and contained during casting process.
Properly managing overlap and confined zone is crucial for a successful VDF flooring installa
Get interview-ready with Top G R Infraprojects Interview Questions
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There was 1 interview round.
EOT proposal is a request for an extension of time in a construction project due to delays beyond the contractor's control.
EOT stands for Extension of Time.
It is a formal request made by the contractor to the client or project owner.
The request is usually accompanied by supporting documentation such as delay analysis reports, weather reports, and other relevant evidence.
EOT proposals are typically reviewed by the proje...
To plan 2 lacs Cum concrete in 1 year, calculate daily production target and number of RMC plants needed.
Calculate daily production target by dividing total volume by number of working days in a year
Determine the capacity of each RMC plant and divide the daily production target by it to find out how many plants are needed
Consider factors like downtime, maintenance, and transportation in your planning
I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.
I expect the company to provide opportunities for growth, a positive work environment, and clear communication.
Opportunities for career advancement
Positive work culture
Clear communication channels
I prefer not to disclose my previous salary as I believe my value is based on my skills and experience.
It is not appropriate to discuss previous salary in an interview
Focus on discussing the value you can bring to the company
Emphasize your skills, experience, and qualifications instead of past salary
QMS is adopted to ensure consistent quality, meet customer requirements, and improve processes.
Ensures consistent quality of products or services
Helps meet customer requirements and expectations
Improves processes and efficiency
Reduces risks and errors
Enhances customer satisfaction
Provides a framework for continuous improvement
Design mix procedure involves determining the proportions of materials to create a concrete mix with desired properties.
Identify the required strength and durability of the concrete
Select suitable materials such as cement, aggregates, and water
Calculate the proportions of each material based on mix design methods
Test the mix to ensure it meets specifications
Adjust the mix if necessary to achieve desired properties
Technical features description and share Karen comment using hai ma'am ne kia songs music Blog archive for the conveyance of the day
Technical features description and share Karen comment using hai ma'am ne kia songs music Blog archive for the conveyance of the day
Top trending discussions
Some of the top questions asked at the G R Infraprojects interview -
The duration of G R Infraprojects interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 156 interviews
Interview experience
based on 1.5k reviews
Rating in categories
Assistant Manager
389
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Senior Engineer
225
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Engineer
137
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Deputy Manager
125
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Structural Engineer
123
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Nagarjuna Construction Company
PNC Infratech
Ashoka Buildcon
IRB Infrastructure