i
G R Infraprojects
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
WBS stands for Work Breakdown Structure, which is a hierarchical decomposition of the total scope of work to be carried out by the project team.
WBS for a highway project would include major components like earthwork, pavement, drainage, signage, lighting, etc.
WBS for a structure project would include components like foundation, superstructure, finishes, MEP (mechanical, electrical, plumbing), etc.
Each major component i...
I have 5 years of experience in store handling, including inventory management, customer service, and team supervision.
Managed inventory to ensure accurate stock levels
Provided excellent customer service to increase customer satisfaction
Supervised a team of employees to ensure smooth store operations
Effective inventory management involves proper processing and coordination with a team of 80 members.
Implement efficient inventory tracking systems to monitor stock levels and prevent overstocking or stockouts.
Establish clear communication channels to ensure all team members are informed of inventory updates and tasks.
Delegate responsibilities based on team members' strengths and skills to maximize efficiency.
Provide r...
Inventory management for projects involves tracking and controlling the flow of goods and materials needed for a specific project.
Utilize inventory management software to track stock levels and reorder supplies as needed
Implement a system for categorizing and organizing inventory to easily locate items
Regularly conduct inventory audits to ensure accuracy and prevent stockouts
Collaborate with project managers to forecas...
Forecasting project material involves analyzing past data, current needs, and future requirements to ensure timely delivery.
Utilize historical data to identify trends and patterns in material usage
Collaborate with project managers to understand upcoming needs and deadlines
Consider lead times for ordering and delivery of materials
Use forecasting tools or software to predict future material requirements
Regularly review a...
I applied via Company Website and was interviewed in Nov 2023. There were 3 interview rounds.
Sanik school G+2 , Quantity survey, estimation and costing
Box type structures are commonly used in construction for their strength and durability, often supported by pile foundations with coating for protection against corrosion.
Box type structures are known for their rigid and strong design, providing stability and support for various applications.
Pile foundations are used to transfer the load of the structure to a deeper, more stable soil or rock layer.
Coating on pile found...
G R Infraprojects interview questions for popular designations
Get interview-ready with Top G R Infraprojects Interview Questions
I have extensive experience implementing and enforcing safety protocols on construction sites.
Implemented daily safety briefings for all workers
Enforced proper use of personal protective equipment (PPE)
Conducted regular safety inspections and audits
Developed emergency response plans and conducted drills
Trained workers on safe work practices and procedures
To declare an object in JavaScript, you can use the 'let' or 'const' keyword followed by the object name and curly braces {}.
Use 'let' or 'const' keyword to declare the object
Followed by the object name and curly braces {}
Example: let person = {};
The MR value of DBM with PMB is more than DBM with VG40.
MR value refers to the Marshall Stability value, which measures the strength and stability of an asphalt mix.
DBM stands for Dense Bituminous Macadam, VG40 and PMB are types of bitumen used in the mix.
DBM with PMB has a higher MR value compared to DBM with VG40 due to the improved properties of PMB.
PMB (Polymer Modified Bitumen) enhances the durability, flexibility...
I applied via Company Website and was interviewed in Mar 2023. There were 3 interview rounds.
Current company Job Responsibilities,Background achievement, Qualification..etc
Top trending discussions
Some of the top questions asked at the G R Infraprojects interview -
The duration of G R Infraprojects interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 154 interviews
Interview experience
based on 1.5k reviews
Rating in categories
Assistant Manager
389
salaries
| â‚ą4.4 L/yr - â‚ą11.5 L/yr |
Senior Engineer
224
salaries
| â‚ą3.6 L/yr - â‚ą8.6 L/yr |
Engineer
137
salaries
| â‚ą2 L/yr - â‚ą6.8 L/yr |
Deputy Manager
125
salaries
| â‚ą6.6 L/yr - â‚ą17.5 L/yr |
Structural Engineer
123
salaries
| â‚ą2 L/yr - â‚ą6.3 L/yr |
Nagarjuna Construction Company
Ashoka Buildcon
IRB Infrastructure
Simplex Infrastructures