I applied via Company Website and was interviewed in May 2021. There were 4 interview rounds.
Risk assessment involves identifying hazards, evaluating the likelihood and severity of harm, and implementing control measures.
Identify hazards and potential sources of harm
Evaluate the likelihood and severity of harm
Implement control measures to eliminate or reduce risks
Review and monitor the effectiveness of control measures
Communicate findings and control measures to relevant parties
Major hazards associated with metro project include electrical hazards, fire hazards, construction hazards, and health hazards.
Electrical hazards due to high voltage power lines and electrical equipment
Fire hazards due to flammable materials and inadequate fire safety measures
Construction hazards such as falls, collapsing structures, and heavy machinery accidents
Health hazards due to dust, noise, and exposure to hazard...
LG stands for Lifting Gear. Safety devices and procedures for lifting include proper training, inspection of equipment, and use of personal protective equipment.
LG refers to equipment used for lifting heavy loads, such as cranes, hoists, and slings
Safety devices for lifting include limit switches, overload protection, and emergency stop buttons
Procedures for lifting include proper rigging, load balancing, and communica...
To prepare a lifting plan, factors such as weight, size, shape, and center of gravity of the load must be considered. For tandem lifting, coordination between the two cranes is crucial.
Determine the weight, size, shape, and center of gravity of the load
Select appropriate lifting equipment and rigging
Identify potential hazards and plan for contingencies
Ensure proper communication and coordination between the two cranes
A...
HSE plan includes policies, procedures, and guidelines for managing health, safety, and environmental risks in the workplace.
Risk assessment and management
Emergency response procedures
Training and education programs
Incident reporting and investigation
Environmental management
Safety audits and inspections
Personal protective equipment requirements
Contractor management
Regulatory compliance
Communication and consultation wit
Public interference can be controlled through effective communication, crowd management techniques, and strict enforcement of rules and regulations.
Establish clear communication channels with the public and provide them with regular updates on the situation.
Train staff in crowd management techniques to ensure that they can handle large crowds safely and efficiently.
Enforce rules and regulations strictly to deter indivi...
Top trending discussions
posted on 22 Apr 2022
I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2021. There were 4 interview rounds.
Yes, I have experience in handling RVNL projects.
I have previously managed a similar railway project
I am familiar with the processes and regulations involved
I have a strong team to support me
I am confident in my ability to deliver the project on time and within budget
posted on 20 Dec 2020
I applied via Naukri.com and was interviewed in Nov 2020. There was 1 interview round.
The percentage of bitumen in DBM varies depending on the specific mix design and project requirements.
DBM stands for Dense Bituminous Macadam, which is a type of road construction material.
The percentage of bitumen in DBM typically ranges from 4% to 6% by weight.
The exact percentage of bitumen is determined based on factors such as traffic load, climate conditions, and desired durability.
Higher percentages of bitumen a...
posted on 17 Feb 2021
I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.
posted on 4 Jan 2021
I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.
posted on 16 May 2021
I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.
I can join within two weeks.
I am currently serving a two-week notice period at my current job.
I have already completed all necessary paperwork and background checks.
I am ready to start as soon as possible.
I can adjust my start date based on the company's requirements.
I left my last company to pursue new opportunities and challenges.
Seeking growth and advancement in my career
Looking for a company with a better cultural fit
Wanting to broaden my skill set
Desire for a higher level of responsibility
Company downsizing or restructuring
posted on 18 Jan 2020
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Maintain elevation of underground piping by using level instruments and proper installation techniques.
Use a level instrument to check the elevation of the piping during installation.
Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.
Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.
Consider using supports o...
In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.
Managed a team of employees and delegated tasks effectively
Handled customer complaints and resolved issues in a timely manner
Created and implemented strategies to improve efficiency and productivity
Collaborated with other departments to achieve company goals
Conducted performanc
Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.
Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.
Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.
Cast iron electrodes have a high nickel content to prevent cracking.
Aluminum electrodes have a special coating ...
Some of the top questions asked at the G R Infraprojects Deputy Manager Safety interview -
based on 1 review
Rating in categories
Assistant Manager
357
salaries
| ₹4.4 L/yr - ₹11.5 L/yr |
Senior Engineer
227
salaries
| ₹3.6 L/yr - ₹8.4 L/yr |
Engineer
138
salaries
| ₹2.2 L/yr - ₹6.5 L/yr |
Deputy Manager
131
salaries
| ₹6.6 L/yr - ₹16 L/yr |
Structural Engineer
122
salaries
| ₹2 L/yr - ₹6.3 L/yr |
Larsen & Toubro Limited
Tata Projects
L&T Construction
Megha Engineering & Infrastructures