i
G R Infraprojects
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
Clear (1)
I applied via Company Website and was interviewed in May 2021. There were 4 interview rounds.
Risk assessment involves identifying hazards, evaluating the likelihood and severity of harm, and implementing control measures.
Identify hazards and potential sources of harm
Evaluate the likelihood and severity of harm
Implement control measures to eliminate or reduce risks
Review and monitor the effectiveness of control measures
Communicate findings and control measures to relevant parties
Major hazards associated with metro project include electrical hazards, fire hazards, construction hazards, and health hazards.
Electrical hazards due to high voltage power lines and electrical equipment
Fire hazards due to flammable materials and inadequate fire safety measures
Construction hazards such as falls, collapsing structures, and heavy machinery accidents
Health hazards due to dust, noise, and exposure to hazard...
LG stands for Lifting Gear. Safety devices and procedures for lifting include proper training, inspection of equipment, and use of personal protective equipment.
LG refers to equipment used for lifting heavy loads, such as cranes, hoists, and slings
Safety devices for lifting include limit switches, overload protection, and emergency stop buttons
Procedures for lifting include proper rigging, load balancing, and communica...
To prepare a lifting plan, factors such as weight, size, shape, and center of gravity of the load must be considered. For tandem lifting, coordination between the two cranes is crucial.
Determine the weight, size, shape, and center of gravity of the load
Select appropriate lifting equipment and rigging
Identify potential hazards and plan for contingencies
Ensure proper communication and coordination between the two cranes
A...
HSE plan includes policies, procedures, and guidelines for managing health, safety, and environmental risks in the workplace.
Risk assessment and management
Emergency response procedures
Training and education programs
Incident reporting and investigation
Environmental management
Safety audits and inspections
Personal protective equipment requirements
Contractor management
Regulatory compliance
Communication and consultation wit
Public interference can be controlled through effective communication, crowd management techniques, and strict enforcement of rules and regulations.
Establish clear communication channels with the public and provide them with regular updates on the situation.
Train staff in crowd management techniques to ensure that they can handle large crowds safely and efficiently.
Enforce rules and regulations strictly to deter indivi...
Top trending discussions
I was interviewed in Mar 2023.
I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.
Launching girder is a temporary structure used in construction to move and position heavy loads.
Launching girder is typically made of steel and consists of multiple sections that can be assembled and disassembled.
It is used in the construction of bridges, viaducts, and other structures to lift and move precast concrete segments into position.
The launching operation involves the step-by-step movement of the girder along...
posted on 30 Nov 2023
I was interviewed before Nov 2022.
I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.
posted on 30 Nov 2022
I applied via Job Portal
Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.
Bentonite is mixed with water to form a slurry and pumped into the borehole.
The slurry fills the borehole and stabilizes the walls, preventing collapse.
After the bentonite has set, pulsing can be done without the risk of borehole collapse.
Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.
posted on 30 May 2022
I applied via Referral and was interviewed in Nov 2021. There were 2 interview rounds.
The safety person's roles and responsibilities as per the BOCW act include ensuring safety measures are in place, conducting safety inspections, and providing safety training.
Ensuring safety measures are in place at the worksite
Conducting safety inspections to identify potential hazards
Providing safety training to workers and management
Maintaining records of safety inspections and incidents
Ensuring compliance with safe...
posted on 10 Sep 2017
I was interviewed before Sep 2016.
Some of the top questions asked at the G R Infraprojects Deputy Manager Safety interview -
based on 1 review
Rating in categories
Assistant Manager
389
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
225
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
137
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
125
salaries
| ₹0 L/yr - ₹0 L/yr |
Structural Engineer
123
salaries
| ₹0 L/yr - ₹0 L/yr |
Nagarjuna Construction Company
PNC Infratech
Ashoka Buildcon
IRB Infrastructure