I applied via Company Website and was interviewed in May 2021. There were 4 interview rounds.
Risk assessment involves identifying hazards, evaluating the likelihood and severity of harm, and implementing control measures.
Identify hazards and potential sources of harm
Evaluate the likelihood and severity of harm
Implement control measures to eliminate or reduce risks
Review and monitor the effectiveness of control measures
Communicate findings and control measures to relevant parties
Major hazards associated with metro project include electrical hazards, fire hazards, construction hazards, and health hazards.
Electrical hazards due to high voltage power lines and electrical equipment
Fire hazards due to flammable materials and inadequate fire safety measures
Construction hazards such as falls, collapsing structures, and heavy machinery accidents
Health hazards due to dust, noise, and exposure to hazard...
LG stands for Lifting Gear. Safety devices and procedures for lifting include proper training, inspection of equipment, and use of personal protective equipment.
LG refers to equipment used for lifting heavy loads, such as cranes, hoists, and slings
Safety devices for lifting include limit switches, overload protection, and emergency stop buttons
Procedures for lifting include proper rigging, load balancing, and communica...
To prepare a lifting plan, factors such as weight, size, shape, and center of gravity of the load must be considered. For tandem lifting, coordination between the two cranes is crucial.
Determine the weight, size, shape, and center of gravity of the load
Select appropriate lifting equipment and rigging
Identify potential hazards and plan for contingencies
Ensure proper communication and coordination between the two cranes
A...
HSE plan includes policies, procedures, and guidelines for managing health, safety, and environmental risks in the workplace.
Risk assessment and management
Emergency response procedures
Training and education programs
Incident reporting and investigation
Environmental management
Safety audits and inspections
Personal protective equipment requirements
Contractor management
Regulatory compliance
Communication and consultation wit
Public interference can be controlled through effective communication, crowd management techniques, and strict enforcement of rules and regulations.
Establish clear communication channels with the public and provide them with regular updates on the situation.
Train staff in crowd management techniques to ensure that they can handle large crowds safely and efficiently.
Enforce rules and regulations strictly to deter indivi...
Electrical maintenance involves regular inspections, repairs, and upgrades to ensure safe and efficient electrical systems.
Routine inspections to identify wear and tear, such as checking circuit breakers and wiring.
Testing and replacing faulty components, like light fixtures or outlets.
Upgrading systems to meet current codes, for example, installing GFCI outlets in wet areas.
Performing preventive maintenance to avoid f...
Work related questions
I have a strong background in railway OHE engineering with experience in design, installation, and maintenance.
Experience in designing overhead electrification systems for railways
Knowledge of installation procedures and safety regulations
Experience in maintenance and troubleshooting of OHE systems
Familiarity with relevant software and tools such as AutoCAD and PLS-CADD
Strong understanding of electrical engineering pri
G R Infraprojects interview questions for popular designations
I appeared for an interview in Jan 2025.
The number of beam lapping zones depends on the specific design and requirements of the project.
Beam lapping zones are typically determined based on structural requirements and load distribution.
The number of beam zones can vary based on factors such as beam size, material, and span length.
Consulting structural engineers and design specifications can help determine the appropriate number of beam lapping zones.
Overlap is the area where two VDF flooring sections meet, while confined zone is the area where the VDF flooring is contained during casting process.
Overlap is the junction between two VDF flooring sections, ensuring seamless connection.
Confined zone is the area where VDF flooring is poured and contained during casting process.
Properly managing overlap and confined zone is crucial for a successful VDF flooring installa
Get interview-ready with Top G R Infraprojects Interview Questions
I appeared for an interview before Mar 2024.
I am the supervisor of the lab assistants.
As a Quality Laboratory Assistant, I ensure accurate testing and compliance with quality standards in laboratory operations.
Conduct routine tests on samples to ensure they meet quality specifications.
Maintain laboratory equipment and ensure proper calibration.
Document test results and assist in preparing reports for quality assurance.
Follow safety protocols and maintain a clean laboratory environment.
Collaborate with o...
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There was 1 interview round.
EOT proposal is a request for an extension of time in a construction project due to delays beyond the contractor's control.
EOT stands for Extension of Time.
It is a formal request made by the contractor to the client or project owner.
The request is usually accompanied by supporting documentation such as delay analysis reports, weather reports, and other relevant evidence.
EOT proposals are typically reviewed by the proje...
To plan 2 lacs Cum concrete in 1 year, calculate daily production target and number of RMC plants needed.
Calculate daily production target by dividing total volume by number of working days in a year
Determine the capacity of each RMC plant and divide the daily production target by it to find out how many plants are needed
Consider factors like downtime, maintenance, and transportation in your planning
I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.
I expect the company to provide opportunities for growth, a positive work environment, and clear communication.
Opportunities for career advancement
Positive work culture
Clear communication channels
I prefer not to disclose my previous salary as I believe my value is based on my skills and experience.
It is not appropriate to discuss previous salary in an interview
Focus on discussing the value you can bring to the company
Emphasize your skills, experience, and qualifications instead of past salary
QMS is adopted to ensure consistent quality, meet customer requirements, and improve processes.
Ensures consistent quality of products or services
Helps meet customer requirements and expectations
Improves processes and efficiency
Reduces risks and errors
Enhances customer satisfaction
Provides a framework for continuous improvement
Design mix procedure involves determining the proportions of materials to create a concrete mix with desired properties.
Identify the required strength and durability of the concrete
Select suitable materials such as cement, aggregates, and water
Calculate the proportions of each material based on mix design methods
Test the mix to ensure it meets specifications
Adjust the mix if necessary to achieve desired properties
Top trending discussions
Some of the top questions asked at the G R Infraprojects interview -
The duration of G R Infraprojects interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 158 interviews
Interview experience
based on 1.5k reviews
Rating in categories
Assistant Manager
350
salaries
| ₹4.4 L/yr - ₹11.5 L/yr |
Senior Engineer
224
salaries
| ₹3.6 L/yr - ₹8.6 L/yr |
Engineer
137
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Deputy Manager
131
salaries
| ₹6.6 L/yr - ₹17.5 L/yr |
Structural Engineer
123
salaries
| ₹2 L/yr - ₹6.3 L/yr |
Nagarjuna Construction Company
PNC Infratech
Ashoka Buildcon
IRB Infrastructure