Junior Engineer Interview Questions & Answers

user image Vengatesh Nadarajan

posted on 23 Mar 2025

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
  • Q1. Basic qualifications
  • Q2. Comfortable with working environment
  • Ans. 

    I thrive in dynamic environments, adapting quickly to challenges and collaborating effectively with teams to achieve project goals.

    • Adaptability: I can adjust to new tools and technologies, as seen when I learned a new software in a week for a project.

    • Team Collaboration: I enjoy working in teams, demonstrated by my role in a group project where we successfully completed tasks ahead of schedule.

    • Problem-Solving: I approac...

  • Answered by AI

Junior Engineer Interview Questions asked at other Companies

Q1. What is the main role of Junior engineer in Electrical maintenance and How to provide the company facilities ?
View answer (25)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is the main role in quality engineer of construction field ?
  • Ans. 

    The main role of a quality engineer in the construction field is to ensure that all construction processes and materials meet quality standards and regulations.

    • Ensuring compliance with building codes and regulations

    • Conducting quality inspections and tests on construction materials and processes

    • Identifying and resolving quality issues and defects

    • Implementing quality control measures to improve overall construction quali...

  • Answered by AI
  • Q2. How to maintain the role of Quality and control Department ?
  • Ans. 

    Maintain the role of Quality and control Department by implementing robust quality management systems, continuous improvement initiatives, and regular audits.

    • Implement robust quality management systems to ensure adherence to quality standards and regulations

    • Promote a culture of quality within the organization through training and awareness programs

    • Conduct regular audits and inspections to identify areas for improvement...

  • Answered by AI

Quality Engineer Interview Questions asked at other Companies

Q1. What is MSA and addition of msa version, type of msa ,what different between variable data and attibute data .why difine flase and miss rate calculate by msa .
View answer (10)

Purchase Officer Interview Questions & Answers

user image AMBATI SWAMY

posted on 25 Jun 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Why filters need for machinery
  • Ans. 

    Filters are needed for machinery to prevent contaminants from entering the system, ensuring optimal performance and longevity.

    • Filters help to remove dirt, debris, and other contaminants from entering the machinery

    • They improve the efficiency and performance of the machinery by ensuring clean and proper flow of fluids or air

    • Filters also help to protect sensitive components within the machinery from damage

    • Regular maintena...

  • Answered by AI
  • Q2. What is major reasons to engine seize.
  • Ans. 

    Major reasons for engine seize include lack of lubrication, overheating, and foreign object damage.

    • Lack of lubrication causing friction and heat buildup

    • Overheating leading to thermal expansion and seizing of moving parts

    • Foreign object damage such as debris or metal particles causing blockages

    • Improper maintenance and neglect of oil changes

    • Running the engine at high speeds for extended periods without proper cooling

  • Answered by AI

Purchase Officer Interview Questions asked at other Companies

Q1. HOW YOU WILL HANDLE SITUATIONS WHERE THE USER LACKS KNOWLEDGE AND IS UNABLE TO UNDERSTAND THE EXECUTION OF SOME PURCHASE WORKS?
View answer (5)

Interview Questions & Answers

user image Anonymous

posted on 1 Oct 2022

I applied via Approached by Company and was interviewed in Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Aap कौन-कौन sa work kar sakte hai
  • Ans. Box cement launching RCC gatar and PSC cutter precast and JC barrier cross barrier drain box covered cement production and gutter launching
  • Answered Anonymously
  • Q2. Ab purani company kyon chhodana chahte Hai
  • Ans. Salary timely nahin milati isliye company change karna chahta hu
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - 1. Box cement launching and I getar launching
2 casting yard all work setring concrete

KNR Constructions interview questions for popular designations

 Junior its Engineer

 (1)

 Quality Engineer

 (1)

 Purchase Officer

 (1)

 Mechanical Engineer

 (1)

 Junior Engineer

 (1)

Interview Questionnaire 

1 Question

  • Q1. About concrete steel B. B. S

Junior its Engineer Interview Questions asked at other Companies

Q1. What is the main role of Junior engineer in Electrical maintenance and How to provide the company facilities to the Junior engineer.
View answer (2)

Mechanical Engineer Interview Questions & Answers

user image Satya Prakash Chauhan

posted on 1 Jul 2020

I applied via Naukri.com and was interviewed in Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About maintenance in vehicle and machine

Mechanical Engineer Interview Questions asked at other Companies

Q1. What we need to do if pressure valve fail in boiler
View answer (8)

Jobs at KNR Constructions

View all

Interview questions from similar companies

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mainly consantraint for pump and high temp lines and material.

Interview Preparation Tips

Interview preparation tips for other job seekers - As above questions mention

I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load distribution under rigid and flexible footings,water tank design, steel foundation design
  • Q2. Mix design of concrete, btech project
  • Ans. 

    Mix design of concrete and BTech project

    • Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete

    • Factors like strength, workability, durability, and cost are considered while designing the mix

    • BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design

    • Examples of BTech projects...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared with basics and if you are already experienced, be prepared with site knowledge

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Related to girder,segment,pier,pier table

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic knowledge about ur own work u worked recently

KNR Constructions Interview FAQs

How many rounds are there in KNR Constructions interview?
KNR Constructions interview process usually has 1-2 rounds. The most common rounds in the KNR Constructions interview process are Technical, Resume Shortlist and One-on-one Round.
How to prepare for KNR Constructions interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KNR Constructions. The most common topics and skills that interviewers at KNR Constructions expect are MS Office, Flyovers, Accounting Software, Building Construction and Cell Culture.
What are the top questions asked in KNR Constructions interview?

Some of the top questions asked at the KNR Constructions interview -

  1. What is the main role in quality engineer of construction fiel...read more
  2. How to maintain the role of Quality and control Department...read more
  3. What is major reasons to engine sei...read more

Tell us how to improve this page.

KNR Constructions Interview Process

based on 7 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 749 Interviews
Tata Projects Interview Questions
4.2
 • 442 Interviews
TCE Interview Questions
3.8
 • 249 Interviews
AECOM Interview Questions
4.2
 • 116 Interviews
Apco Infratech Interview Questions
3.7
 • 115 Interviews
AtkinsRealis Interview Questions
3.9
 • 87 Interviews
View all

KNR Constructions Reviews and Ratings

based on 171 reviews

4.2/5

Rating in categories

4.0

Skill development

3.8

Work-life balance

3.7

Salary

4.0

Job security

3.7

Company culture

3.3

Promotions

4.0

Work satisfaction

Explore 171 Reviews and Ratings
Graduate Engineer Trainee (SAP) - Mechanical (Freshers)

Ongole,

Karnataka

+1

0-1 Yrs

Not Disclosed

Convention Hall Operations Head

Hyderabad / Secunderabad

10-15 Yrs

Not Disclosed

Explore more jobs
Junior Engineer Civil
43 salaries
unlock blur

₹1.7 L/yr - ₹4.5 L/yr

Junior Engineer
34 salaries
unlock blur

₹1.5 L/yr - ₹4 L/yr

Civil Site Engineer
33 salaries
unlock blur

₹1.6 L/yr - ₹4 L/yr

Highway Engineer
27 salaries
unlock blur

₹1.5 L/yr - ₹5.8 L/yr

Structural Engineer
19 salaries
unlock blur

₹2 L/yr - ₹5 L/yr

Explore more salaries
Compare KNR Constructions with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview