Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is the main role in quality engineer of construction field ?
  • Ans. 

    The main role of a quality engineer in the construction field is to ensure that all construction processes and materials meet quality standards and regulations.

    • Ensuring compliance with building codes and regulations

    • Conducting quality inspections and tests on construction materials and processes

    • Identifying and resolving quality issues and defects

    • Implementing quality control measures to improve overall construction quali...

  • Answered by AI
  • Q2. How to maintain the role of Quality and control Department ?
  • Ans. 

    Maintain the role of Quality and control Department by implementing robust quality management systems, continuous improvement initiatives, and regular audits.

    • Implement robust quality management systems to ensure adherence to quality standards and regulations

    • Promote a culture of quality within the organization through training and awareness programs

    • Conduct regular audits and inspections to identify areas for improvement...

  • Answered by AI

Quality Engineer Interview Questions asked at other Companies

Q1. What is MSA and addition of msa version, type of msa ,what different between variable data and attibute data .why difine flase and miss rate calculate by msa .
View answer (8)

Purchase Officer Interview Questions & Answers

user image AMBATI SWAMY

posted on 25 Jun 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Why filters need for machinery
  • Ans. 

    Filters are needed for machinery to prevent contaminants from entering the system, ensuring optimal performance and longevity.

    • Filters help to remove dirt, debris, and other contaminants from entering the machinery

    • They improve the efficiency and performance of the machinery by ensuring clean and proper flow of fluids or air

    • Filters also help to protect sensitive components within the machinery from damage

    • Regular maintena...

  • Answered by AI
  • Q2. What is major reasons to engine seize.
  • Ans. 

    Major reasons for engine seize include lack of lubrication, overheating, and foreign object damage.

    • Lack of lubrication causing friction and heat buildup

    • Overheating leading to thermal expansion and seizing of moving parts

    • Foreign object damage such as debris or metal particles causing blockages

    • Improper maintenance and neglect of oil changes

    • Running the engine at high speeds for extended periods without proper cooling

  • Answered by AI

Purchase Officer Interview Questions asked at other Companies

Q1. HOW YOU WILL HANDLE SITUATIONS WHERE THE USER LACKS KNOWLEDGE AND IS UNABLE TO UNDERSTAND THE EXECUTION OF SOME PURCHASE WORKS?
View answer (5)

Interview Questions & Answers

user image Anonymous

posted on 1 Oct 2022

I applied via Approached by Company and was interviewed in Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Aap कौन-कौन sa work kar sakte hai
  • Ans. Box cement launching RCC gatar and PSC cutter precast and JC barrier cross barrier drain box covered cement production and gutter launching
  • Answered Anonymously
  • Q2. Ab purani company kyon chhodana chahte Hai
  • Ans. Salary timely nahin milati isliye company change karna chahta hu
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - 1. Box cement launching and I getar launching
2 casting yard all work setring concrete

Interview Questionnaire 

1 Question

  • Q1. About concrete steel B. B. S

Junior its Engineer Interview Questions asked at other Companies

Q1. What is the main role of Junior engineer in Electrical maintenance and How to provide the company facilities to the Junior engineer.
View answer (2)

KNR Constructions interview questions for popular designations

 Junior its Engineer

 (1)

 Quality Engineer

 (1)

 Purchase Officer

 (1)

 Mechanical Engineer

 (1)

Mechanical Engineer Interview Questions & Answers

user image Satya Prakash Chauhan

posted on 1 Jul 2020

I applied via Naukri.com and was interviewed in Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About maintenance in vehicle and machine

Mechanical Engineer Interview Questions asked at other Companies

Q1. What we need to do if pressure valve fail in boiler
View answer (8)

Interview questions from similar companies

I was interviewed before Jul 2016.

Interview Preparation Tips

Round: Group Discussion
Duration: 4 hours 5 minutes

Round: Test
Duration: 2 hours 5 minutes

I applied via Recruitment Consultant and was interviewed in Apr 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About HT/LT,Motor/Feeder & Substation Errection & Commission.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Questions Are Asked.

I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. ELSR MEANS

Interview Preparation Tips

Interview preparation tips for other job seekers - Elevated service level Reservoir

Interview Questionnaire 

3 Questions

  • Q1. Basically questions related to power distribution field & some of college courses.
  • Q2. In this round questions basically related to management & technical composition.
  • Q3. He only asked your previous n current financial requirements as per your interview.

I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Machinery maintenance Dpr maintenance,local purchasing,

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice,good and teritical intrew done and completed
Contribute & help others!
anonymous
You can choose to be anonymous

KNR Constructions Interview FAQs

How many rounds are there in KNR Constructions interview?
KNR Constructions interview process usually has 1-2 rounds. The most common rounds in the KNR Constructions interview process are Technical, Resume Shortlist and One-on-one Round.
How to prepare for KNR Constructions interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KNR Constructions. The most common topics and skills that interviewers at KNR Constructions expect are MS Office, Flyovers, Accounting Software, Building Construction and Cell Culture.
What are the top questions asked in KNR Constructions interview?

Some of the top questions asked at the KNR Constructions interview -

  1. What is the main role in quality engineer of construction fiel...read more
  2. How to maintain the role of Quality and control Department...read more
  3. What is major reasons to engine sei...read more

Recently Viewed

JOBS

Browse jobs

Discover jobs you love

COMPANY BENEFITS

KNR Constructions

20 benefits

COMPANY BENEFITS

IRB Infrastructure

60 benefits

COMPANY BENEFITS

Dilip Buildcon

304 benefits

COMPANY BENEFITS

Dilip Buildcon

304 benefits

DESIGNATION

DESIGNATION

JOBS

Shiprocket Private Limited

No Jobs

JOBS

Loop Work

No Jobs

DESIGNATION

Tell us how to improve this page.

KNR Constructions Interview Process

based on 6 interviews

Interview experience

4.5
  
Good
View more

KNR Constructions Reviews and Ratings

based on 164 reviews

4.2/5

Rating in categories

4.1

Skill development

3.8

Work-life balance

3.7

Salary

4.1

Job security

3.7

Company culture

3.3

Promotions

4.0

Work satisfaction

Explore 164 Reviews and Ratings
Convention Hall Operations Head

Hyderabad / Secunderabad

10-15 Yrs

Not Disclosed

Graduate Engineer Trainee (SAP) - Mechanical (Freshers)

Karnataka,

Kerala

0-1 Yrs

Not Disclosed

General Manager

Hyderabad / Secunderabad

15-20 Yrs

Not Disclosed

Explore more jobs
Junior Engineer Civil
48 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
33 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Highway Engineer
27 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Junior Engineer
24 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Structural Engineer
20 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare KNR Constructions with

Nagarjuna Construction Company

4.1
Compare

PNC Infratech

3.9
Compare

Ashoka Buildcon

4.1
Compare

IRB Infrastructure

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview