Upload Button Icon Add office photos

Filter interviews by

KNR Constructions Interview Questions, Process, and Tips

Updated 23 Mar 2025

Top KNR Constructions Interview Questions and Answers

KNR Constructions Interview Experiences

Popular Designations

6 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is the main role in quality engineer of construction field ?
  • Ans. 

    The main role of a quality engineer in the construction field is to ensure that all construction processes and materials meet quality standards and regulations.

    • Ensuring compliance with building codes and regulations

    • Conducting quality inspections and tests on construction materials and processes

    • Identifying and resolving quality issues and defects

    • Implementing quality control measures to improve overall construction quali...

  • Answered by AI
  • Q2. How to maintain the role of Quality and control Department ?
  • Ans. 

    Maintain the role of Quality and control Department by implementing robust quality management systems, continuous improvement initiatives, and regular audits.

    • Implement robust quality management systems to ensure adherence to quality standards and regulations

    • Promote a culture of quality within the organization through training and awareness programs

    • Conduct regular audits and inspections to identify areas for improvement...

  • Answered by AI

Quality Engineer Interview Questions asked at other Companies

Q1. What is MSA and addition of msa version, type of msa ,what different between variable data and attibute data .why difine flase and miss rate calculate by msa .
View answer (10)

Junior Engineer Interview Questions & Answers

user image Vengatesh Nadarajan

posted on 23 Mar 2025

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
  • Q1. Basic qualifications
  • Q2. Comfortable with working environment
  • Ans. 

    I thrive in dynamic environments, adapting quickly to challenges and collaborating effectively with teams to achieve project goals.

    • Adaptability: I can adjust to new tools and technologies, as seen when I learned a new software in a week for a project.

    • Team Collaboration: I enjoy working in teams, demonstrated by my role in a group project where we successfully completed tasks ahead of schedule.

    • Problem-Solving: I approac...

  • Answered by AI

Junior Engineer Interview Questions asked at other Companies

Q1. What is the main role of Junior engineer in Electrical maintenance and How to provide the company facilities ?
View answer (25)

Purchase Officer Interview Questions & Answers

user image AMBATI SWAMY

posted on 25 Jun 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Why filters need for machinery
  • Ans. 

    Filters are needed for machinery to prevent contaminants from entering the system, ensuring optimal performance and longevity.

    • Filters help to remove dirt, debris, and other contaminants from entering the machinery

    • They improve the efficiency and performance of the machinery by ensuring clean and proper flow of fluids or air

    • Filters also help to protect sensitive components within the machinery from damage

    • Regular maintena...

  • Answered by AI
  • Q2. What is major reasons to engine seize.
  • Ans. 

    Major reasons for engine seize include lack of lubrication, overheating, and foreign object damage.

    • Lack of lubrication causing friction and heat buildup

    • Overheating leading to thermal expansion and seizing of moving parts

    • Foreign object damage such as debris or metal particles causing blockages

    • Improper maintenance and neglect of oil changes

    • Running the engine at high speeds for extended periods without proper cooling

  • Answered by AI

Purchase Officer Interview Questions asked at other Companies

Q1. HOW YOU WILL HANDLE SITUATIONS WHERE THE USER LACKS KNOWLEDGE AND IS UNABLE TO UNDERSTAND THE EXECUTION OF SOME PURCHASE WORKS?
View answer (5)

Interview Questions & Answers

user image Anonymous

posted on 1 Oct 2022

I applied via Approached by Company and was interviewed in Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Aap कौन-कौन sa work kar sakte hai
  • Ans. Box cement launching RCC gatar and PSC cutter precast and JC barrier cross barrier drain box covered cement production and gutter launching
  • Answered Anonymously
  • Q2. Ab purani company kyon chhodana chahte Hai
  • Ans. Salary timely nahin milati isliye company change karna chahta hu
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - 1. Box cement launching and I getar launching
2 casting yard all work setring concrete

KNR Constructions interview questions for popular designations

 Junior its Engineer

 (1)

 Quality Engineer

 (1)

 Purchase Officer

 (1)

 Mechanical Engineer

 (1)

 Junior Engineer

 (1)

Interview Questionnaire 

1 Question

  • Q1. About concrete steel B. B. S

Junior its Engineer Interview Questions asked at other Companies

Q1. What is the main role of Junior engineer in Electrical maintenance and How to provide the company facilities to the Junior engineer.
View answer (2)

Mechanical Engineer Interview Questions & Answers

user image Satya Prakash Chauhan

posted on 1 Jul 2020

I applied via Naukri.com and was interviewed in Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About maintenance in vehicle and machine

Mechanical Engineer Interview Questions asked at other Companies

Q1. What we need to do if pressure valve fail in boiler
View answer (8)

Jobs at KNR Constructions

View all

Interview questions from similar companies

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is the most challenging situation you have been through in your career?

Interview Preparation Tips

Interview preparation tips for other job seekers - To ace an interview you need to be a good listener as much as a good speaker. Try to listen and understand what the interviewer is asking and then reply. Never be in a hurry to answer, take time. If you did not understand what interviewer is asking simply ask him to repeat, pls don't presume anything and answer anything that comes to your mind. Most importantly never fake in an interview just try to be your best...

I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Basic questions

Interview Preparation Tips

Interview preparation tips for other job seekers - candidates which were recruited by JMC in the year 2018 are getting less payments than the students recruited in the year 2019. The same happened to me and I left just because casual behavior from the management.

I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Excavation safety, EHS management, Lifting & Erection safety

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to explain basic concepts clearly

KNR Constructions Interview FAQs

How many rounds are there in KNR Constructions interview?
KNR Constructions interview process usually has 1-2 rounds. The most common rounds in the KNR Constructions interview process are Technical, Resume Shortlist and One-on-one Round.
How to prepare for KNR Constructions interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KNR Constructions. The most common topics and skills that interviewers at KNR Constructions expect are MS Office, Flyovers, Accounting Software, Building Construction and Cell Culture.
What are the top questions asked in KNR Constructions interview?

Some of the top questions asked at the KNR Constructions interview -

  1. What is the main role in quality engineer of construction fiel...read more
  2. How to maintain the role of Quality and control Department...read more
  3. What is major reasons to engine sei...read more

Tell us how to improve this page.

KNR Constructions Interview Process

based on 7 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 758 Interviews
Tata Projects Interview Questions
4.2
 • 453 Interviews
TCE Interview Questions
3.8
 • 251 Interviews
AECOM Interview Questions
4.2
 • 118 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
View all

KNR Constructions Reviews and Ratings

based on 172 reviews

4.2/5

Rating in categories

4.0

Skill development

3.8

Work-life balance

3.7

Salary

4.0

Job security

3.7

Company culture

3.3

Promotions

4.0

Work satisfaction

Explore 172 Reviews and Ratings
Graduate Engineer Trainee (SAP) - Mechanical (Freshers)

Ongole,

Karnataka

+1

0-1 Yrs

Not Disclosed

Convention Hall Operations Head

Hyderabad / Secunderabad

10-15 Yrs

Not Disclosed

Explore more jobs
Junior Engineer Civil
43 salaries
unlock blur

₹1.7 L/yr - ₹4.5 L/yr

Junior Engineer
34 salaries
unlock blur

₹1.5 L/yr - ₹4 L/yr

Civil Site Engineer
33 salaries
unlock blur

₹1.6 L/yr - ₹4 L/yr

Highway Engineer
25 salaries
unlock blur

₹1.5 L/yr - ₹5 L/yr

Structural Engineer
19 salaries
unlock blur

₹2 L/yr - ₹5 L/yr

Explore more salaries
Compare KNR Constructions with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview