Upload Button Icon Add office photos

Filter interviews by

KNR Constructions Purchase Officer Interview Questions and Answers

Updated 25 Jun 2024

KNR Constructions Purchase Officer Interview Experiences

1 interview found

Purchase Officer Interview Questions & Answers

user image AMBATI SWAMY

posted on 25 Jun 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Why filters need for machinery
  • Ans. 

    Filters are needed for machinery to prevent contaminants from entering the system, ensuring optimal performance and longevity.

    • Filters help to remove dirt, debris, and other contaminants from entering the machinery

    • They improve the efficiency and performance of the machinery by ensuring clean and proper flow of fluids or air

    • Filters also help to protect sensitive components within the machinery from damage

    • Regular maintena...

  • Answered by AI
  • Q2. What is major reasons to engine seize.
  • Ans. 

    Major reasons for engine seize include lack of lubrication, overheating, and foreign object damage.

    • Lack of lubrication causing friction and heat buildup

    • Overheating leading to thermal expansion and seizing of moving parts

    • Foreign object damage such as debris or metal particles causing blockages

    • Improper maintenance and neglect of oil changes

    • Running the engine at high speeds for extended periods without proper cooling

  • Answered by AI

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Jul 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. What is ABC Analysis
  • Ans. 

    ABC Analysis is a method used in inventory management to categorize items based on their importance and prioritize them accordingly.

    • ABC Analysis categorizes items into three groups: A, B, and C.

    • Group A items are the most important and high-value items that require close monitoring and frequent replenishment.

    • Group B items are moderately important and have a moderate value.

    • Group C items are the least important and low-va...

  • Answered by AI

Interview Questionnaire 

4 Questions

  • Q1. Pls tell about yourself.
  • Q2. On subject matter.
  • Q3. CTC
  • Q4. Close

Interview Preparation Tips

Interview preparation tips for other job seekers - Discuss with confidently and if you haven't answer--- say without hesitation.

I applied via Naukri.com and was interviewed in Mar 2021. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Totally related on work experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice

I applied via Other and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Pure technical questions are asked.
  • Q2. Power transmission in transit mixer & operation of batching plant.
  • Ans. 

    Power transmission & operation of batching plant in transit mixer is crucial for efficient concrete mixing.

    • Power transmission in transit mixer is done through a hydraulic motor which is connected to the mixer drum.

    • The batching plant is responsible for mixing the ingredients in the right proportion and delivering it to the transit mixer.

    • The operation of the batching plant involves loading the ingredients into the hopper...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Clear about basic concepts & technical specifications of equipment

I applied via Naukri.com and was interviewed in May 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Basics and details of compressed air system, EOT cranes,
  • Q2. Basics of stacker reclaimer, bag filter, thickener

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident. Be thorough with the basics. You will clear the interview if you have really worked on the systems.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Orifice rating calculation
  • Q2. Mass spectrometer

I applied via Referral and was interviewed in Jul 2021. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Related to Hospital Project

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep going and full confidence whatever knowledge you have.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Nov 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Based on last project mentioned in resume
  • Q2. Piping support related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Write in resume only things which you actually performed

Manager Interview Questions & Answers

Tata Projects user image Niteenkumar Belkoniker

posted on 24 May 2024

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Background and qualifications
Round 2 - Technical 

(1 Question)

  • Q1. About experience

KNR Constructions Interview FAQs

How many rounds are there in KNR Constructions Purchase Officer interview?
KNR Constructions interview process usually has 1 rounds. The most common rounds in the KNR Constructions interview process are One-on-one Round.
How to prepare for KNR Constructions Purchase Officer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KNR Constructions. The most common topics and skills that interviewers at KNR Constructions expect are Cost Reduction, Negotiation, Purchase Management, Purchase Order and Purchase Requisition.
What are the top questions asked in KNR Constructions Purchase Officer interview?

Some of the top questions asked at the KNR Constructions Purchase Officer interview -

  1. What is major reasons to engine sei...read more
  2. Why filters need for machin...read more

Tell us how to improve this page.

KNR Constructions Purchase Officer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 758 Interviews
Tata Projects Interview Questions
4.2
 • 453 Interviews
TCE Interview Questions
3.8
 • 251 Interviews
AECOM Interview Questions
4.2
 • 118 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
View all

KNR Constructions Purchase Officer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

4.0

Skill development

3.0

Work-life balance

3.0

Salary

3.0

Job security

4.0

Company culture

3.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Junior Engineer Civil
43 salaries
unlock blur

₹1.7 L/yr - ₹4.5 L/yr

Junior Engineer
34 salaries
unlock blur

₹1.5 L/yr - ₹4 L/yr

Civil Site Engineer
33 salaries
unlock blur

₹1.6 L/yr - ₹4 L/yr

Highway Engineer
25 salaries
unlock blur

₹1.5 L/yr - ₹5 L/yr

Structural Engineer
19 salaries
unlock blur

₹2 L/yr - ₹5 L/yr

Explore more salaries
Compare KNR Constructions with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview