G R Infraprojects Civil Foreman Interview Questions and Answers

Updated 10 Jan 2022

G R Infraprojects Civil Foreman Interview Experiences

2 interviews found

Civil Foreman Interview Questions & Answers

user image Anonymous

posted on 15 Dec 2021

I applied via Company Website and was interviewed in Nov 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Sariya setting

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview date and time.

Interview Questionnaire 

3 Questions

  • Q1. Road me civil structural engineering
  • Q2. Road civil structural
  • Q3. Sheet piling

Interview Preparation Tips

Interview preparation tips for other job seekers - Road safety and structural all questions

Civil Foreman Interview Questions Asked at Other Companies

Q1. How do prepare bbs. Shuttering work prosses , RCC and pqc work, l ... read more
asked in HIDADA
Q2. What is slump test constant temperature of concrete in site Dinfi ... read more
asked in Eros Group
Q3. 1.)What is reinforcement and rebar ?2.)where are used what block ... read more
Q4. How calculate zone Azone 3,700m B zone 1000ma& C zone remaini ... read more
Q5. How much slump in concrete grade m-40

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(7 Questions)

  • Q1. Quality and material control
  • Q2. Work Productivity
  • Q3. Rre_productivity
  • Q4. Post product activity
  • Q5. Good knowledge and good behaviour
  • Q6. Pre_productivity
  • Q7. Post productivity

Interview Preparation Tips

Interview preparation tips for other job seekers - PSP PROJECT LMT
Civil Foreman
Responsible for All works at Building Construction.
Barbending, Shuttering carpentery, Masonry and finishing works.
Responsible for work done with good productivity.
Labournet services India Pvt Ltd
Senior Civil Trainer
Working as a Civil construction Trainer.
Certified in Assistant mason and Shuttering carpentery trade by NSDC.
Worked in multiple Skill development projects.
NAREDCO, PMKVY, BOCW and Morth.
Trained more than 500 labourers under skill development program.
L&T Construction
Civil Supervisor
Responsible for All works at Building Construction.
Barbending, Shuttering carpentery, Masonry and finishing works.
Responsible for work done with good productivity.
Al Jaber Group Dubai UAE
Chargehand
Worked as a chargehand with the team of 15 labour.
Completed on time construction works.
Responsible for Barbending works completion as per drawing.
Al Jaber Group Dubai UAE
Civil Foreman
Worked as a Civil Formen with the team of 15 labour.
Barbending, Shuttering carpentery, Masonry and finishing works.
Completed on time construction works.
Responsible for Barbending works completion as per drawing.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. How to check beam reinforcement?
  • Ans. 

    Beam reinforcement can be checked by visually inspecting the placement, size, and spacing of the steel bars within the beam.

    • Visually inspect the placement of steel bars within the beam to ensure they are in the correct position as per the design drawings.

    • Check the size of the steel bars to ensure they meet the specifications outlined in the structural drawings.

    • Verify the spacing between the steel bars to ensure they ar...

  • Answered by AI
  • Q2. What is the minimum dia rebar of column?
  • Ans. 

    The minimum diameter of rebar for a column depends on the structural design and load requirements.

    • The minimum diameter of rebar for a column is typically specified in the structural drawings or design documents.

    • Common minimum diameters for column rebars range from 12mm to 25mm, depending on the size and load-bearing capacity of the column.

    • The minimum diameter of rebar is important for ensuring the structural integrity ...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Cover of reinforcement of slab?
  • Ans. 

    Cover of reinforcement of slab refers to the distance between the outer surface of the concrete and the reinforcement bars.

    • The cover of reinforcement is important for protecting the reinforcement from corrosion and ensuring structural integrity.

    • The typical cover of reinforcement for slabs is around 20-30mm, but it can vary depending on the design requirements.

    • Factors such as exposure conditions, concrete quality, and l...

  • Answered by AI
  • Q2. How to calculate of concrete quantity?
  • Ans. 

    Concrete quantity can be calculated by multiplying the volume of the area to be filled by the density of the concrete.

    • Calculate the volume of the area to be filled (length x width x height)

    • Determine the density of the concrete (usually around 2400 kg/m^3)

    • Multiply the volume by the density to get the total concrete quantity needed

    • Consider adding a percentage for wastage or spillage

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. Type of bricks joint?
  • Ans. 

    There are various types of brick joints used in construction, such as flush joint, raked joint, weathered joint, and v-joint.

    • Flush joint is a joint where the mortar is flush with the face of the brick.

    • Raked joint is a joint where the mortar is recessed slightly from the face of the brick.

    • Weathered joint is a joint where the mortar is sloped to allow water to run off.

    • V-joint is a joint where the mortar is shaped like a

  • Answered by AI
  • Q2. Type of bricks,?
  • Ans. 

    There are various types of bricks used in construction, such as clay bricks, concrete bricks, and fire bricks.

    • Clay bricks are made from clay and are commonly used for construction.

    • Concrete bricks are made from concrete and are known for their strength and durability.

    • Fire bricks are made to withstand high temperatures and are used in fireplaces and kilns.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I know the civil work. It' s very good.
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2023. There were 6 interview rounds.

Round 1 - Group Discussion 

Any questions asking related civil construction

Round 2 - Technical 

(2 Questions)

  • Q1. Any questions asking
  • Q2. Site work related
Round 3 - One-on-one 

(1 Question)

  • Q1. Step by step asking questions
Round 4 - HR 

(2 Questions)

  • Q1. Documents paper & site
  • Q2. Any questions available
Round 5 - Aptitude Test 

Behavior is must be staff & company

Round 6 - Case Study 

Safety related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Dear sir
I'm hard working in 14 years life
& completed work then other work start

I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Question will be what you have done, about that.
  • Q2. Like some kind of difficulties they can show you from your subject, question will be how you will be over come it?
  • Q3. They will be ask how your experience?
  • Q4. How many sites you have face?

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't talk any lie, what you have done tell them. They ask only in between of your spoken answer.

Interview Questionnaire 

11 Questions

  • Q1. Am civil service. I required job
  • Q2. Required job
  • Q3. Civil foreman job equired
  • Q4. I am civil foreman
  • Q5. Get you job
  • Q6. I am interested in jmc
  • Q7. Get job
  • Q8. Required for job
  • Q9. Job requirements
  • Q10. I am interested job
  • Q11. Please refer

I was interviewed in May 2018.

Interview Questionnaire 

7 Questions

  • Q1. Only construction line
  • Q2. Only my job
  • Q3. What type of your job
  • Ans. 

    As a Civil Foreman, my job involves overseeing construction projects, managing workers, ensuring safety regulations are followed, and coordinating with other professionals.

    • Supervising construction projects from start to finish

    • Managing and coordinating construction workers

    • Ensuring safety regulations and protocols are followed

    • Collaborating with engineers, architects, and other professionals

    • Scheduling and organizing work ...

  • Answered by AI
  • Q4. How much mm in 1"
  • Ans. 

    There are 25.4 millimeters in 1 inch.

    • 1 inch is equal to 25.4 millimeters.

    • The conversion factor from inches to millimeters is 25.4.

    • To convert inches to millimeters, multiply the number of inches by 25.4.

    • For example, 2 inches is equal to 50.8 millimeters (2 x 25.4).

  • Answered by AI
  • Q5. How much mm in 1mtr
  • Ans. 

    There are 1000 millimeters in 1 meter.

    • 1 meter is equal to 1000 millimeters.

    • The conversion factor from meters to millimeters is 1000.

    • To convert meters to millimeters, multiply the length in meters by 1000.

  • Answered by AI
  • Q6. Construction line
  • Q7. Technical field

Interview Preparation Tips

Round: Resume Shortlist
Experience: Civil foreman

General Tips: Good
Duration: 1-4 weeks
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Monster and was interviewed before May 2020. There were 5 interview rounds.

Round 1 - Civil site activity 

(2 Questions)

  • Q1. Earth work activity
  • Q2. Road activity embt. Subgrad bes GSB , wmm DBM
Round 2 - One-on-one 

(3 Questions)

  • Q1. Concrete pouring
  • Q2. Earth work of road
  • Ans. 

    Earth work of road involves excavation, filling, compaction, and shaping of the ground to create a stable foundation for the road.

    • Excavation is the process of removing soil and rocks to create space for the road.

    • Filling involves adding suitable materials like gravel or crushed stones to level the ground.

    • Compaction is essential to ensure the filled materials are tightly packed and stable.

    • Shaping the ground involves grad...

  • Answered by AI
  • Q3. Pedestal j bolting
Round 3 - Group Discussion 

Descusosin of road concreting Massonary work

Round 4 - HR 

(2 Questions)

  • Q1. Noida international airport Noida
  • Q2. Airside Earth work activity
Round 5 - Group Discussion 

Discuss of site civil activities

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil site working experience
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Casting ke liye kya chahiye
  • Q2. Sariya ka daya kitne hote hai
  • Q3. Setring ko kaise redi karte hai
Round 2 - One-on-one 

(1 Question)

  • Q1. Igadar kya hai aur t gatar me antar

G R Infraprojects Interview FAQs

What are the top questions asked in G R Infraprojects Civil Foreman interview?

Some of the top questions asked at the G R Infraprojects Civil Foreman interview -

  1. Road me civil structural engineer...read more
  2. Road civil structu...read more
  3. Sariya sett...read more

Tell us how to improve this page.

G R Infraprojects Civil Foreman Salary
based on 6 salaries
₹2 L/yr - ₹5.5 L/yr
18% less than the average Civil Foreman Salary in India
View more details

G R Infraprojects Civil Foreman Reviews and Ratings

based on 3 reviews

4.4/5

Rating in categories

3.7

Skill development

3.8

Work-life balance

3.8

Salary

3.1

Job security

4.1

Company culture

3.4

Promotions

4.2

Work satisfaction

Explore 3 Reviews and Ratings
Assistant Manager
389 salaries
unlock blur

₹4.4 L/yr - ₹11.5 L/yr

Senior Engineer
224 salaries
unlock blur

₹3.6 L/yr - ₹8.6 L/yr

Engineer
137 salaries
unlock blur

₹2 L/yr - ₹6.8 L/yr

Deputy Manager
125 salaries
unlock blur

₹6.6 L/yr - ₹17.5 L/yr

Structural Engineer
123 salaries
unlock blur

₹2 L/yr - ₹6.3 L/yr

Explore more salaries
Compare G R Infraprojects with

Nagarjuna Construction Company

4.1
Compare

PNC Infratech

3.9
Compare

Ashoka Buildcon

4.0
Compare

IRB Infrastructure

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview