Upload Button Icon Add office photos

Filter interviews by

E C R Buildtech Civil Foreman Interview Questions and Answers

Updated 5 Nov 2022

E C R Buildtech Civil Foreman Interview Experiences

1 interview found

I applied via Referral and was interviewed before Nov 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. How do prepare bbs. Shuttering work prosses , RCC and pqc work, lay out, DPR, and quantity .
  • Ans. 

    To prepare BBS, shuttering work, RCC and PQC work, lay out, DPR, and quantity, one needs to follow a systematic process.

    • Understand the project requirements and specifications

    • Prepare a detailed plan and schedule for each task

    • Ensure availability of necessary resources and materials

    • Follow standard procedures for BBS preparation, shuttering work, RCC and PQC work, lay out, DPR, and quantity calculations

    • Regularly monitor an...

  • Answered by AI
  • Q2. What is mathod of slab shuttering with plyboard
  • Ans. 

    Slab shuttering with plyboard involves creating a formwork using plywood sheets to support the concrete slab during pouring and curing.

    • Measure and mark the area where the slab will be poured

    • Cut the plywood sheets to size and lay them on the ground

    • Secure the plywood sheets together using nails or screws

    • Install support beams and braces to hold the formwork in place

    • Pour the concrete into the formwork and allow it to cure

    • R...

  • Answered by AI
  • Q3. Kindly , make progress report of site activity

Interview Preparation Tips

Interview preparation tips for other job seekers - You can face phonics interview also,and prooved that u r a experience person

Interview questions from similar companies

I was interviewed before Feb 2021.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Case Study 

12th

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil formen ho m mari ko job ki jarurt h

I applied via Approached by Company and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. Work details and your behavior your attitude your skills your experience You speak true your skills your experience averything
  • Q2. Start is how are you, what is your skills, your experience, your behavior your all details
  • Q3. Your work experience, how you give progress fast, how you save workrs, how you manage manpower
  • Ans. 

    I prioritize efficient progress, worker safety, and effective manpower management.

    • I closely monitor project timelines and identify areas where progress can be expedited.

    • I implement strategies such as streamlining processes, optimizing resource allocation, and utilizing technology to increase productivity.

    • For example, in my previous role as a Civil Foreman, I introduced a new scheduling system that reduced project compl...

  • Answered by AI
  • Q4. How you work experience, you speak true sir I'm working this company 3 years this is my sartifiket

Interview Preparation Tips

Topics to prepare for Shapoorji Pallonji Group Civil Foreman interview:
  • Civil Construction
  • Your work experience
  • Your sartifiket
  • Your behavior
  • Your aducation
  • How to give progress
  • Drawing you know
  • How you expect salary
  • All details
Interview preparation tips for other job seekers - Don't think negative, think positive and speak averything true that sit
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Casting ke liye kya chahiye
  • Q2. Sariya ka daya kitne hote hai
  • Q3. Setring ko kaise redi karte hai
Round 2 - One-on-one 

(1 Question)

  • Q1. Igadar kya hai aur t gatar me antar
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed in Jan 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is well foundation and tilt shift method
  • Ans. 

    Well foundation is a type of foundation used in civil engineering while tilt shift method is a photography technique.

    • Well foundation is a type of deep foundation used to support heavy structures on soft soil or water bodies.

    • It consists of a large diameter well-like structure made of concrete or steel, which is sunk into the ground or waterbed.

    • The space inside the well is then filled with concrete or stone to provide a ...

  • Answered by AI
  • Q2. What is segment lifting proseger
  • Ans. 

    Segment lifting process is a technique used in construction to lift and place precast concrete segments for bridge construction.

    • It involves the use of cranes and specialized lifting equipment.

    • The segments are lifted and placed in a predetermined sequence to form the bridge deck.

    • This process is faster and more efficient than traditional bridge construction methods.

    • Examples of projects that have used segment lifting incl...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please give me chance for working with you I'm specialist for bridge project
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. How to check beam reinforcement?
  • Ans. 

    Beam reinforcement can be checked by visually inspecting the placement, size, and spacing of the steel bars within the beam.

    • Visually inspect the placement of steel bars within the beam to ensure they are in the correct position as per the design drawings.

    • Check the size of the steel bars to ensure they meet the specifications outlined in the structural drawings.

    • Verify the spacing between the steel bars to ensure they ar...

  • Answered by AI
  • Q2. What is the minimum dia rebar of column?
  • Ans. 

    The minimum diameter of rebar for a column depends on the structural design and load requirements.

    • The minimum diameter of rebar for a column is typically specified in the structural drawings or design documents.

    • Common minimum diameters for column rebars range from 12mm to 25mm, depending on the size and load-bearing capacity of the column.

    • The minimum diameter of rebar is important for ensuring the structural integrity ...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Cover of reinforcement of slab?
  • Ans. 

    Cover of reinforcement of slab refers to the distance between the outer surface of the concrete and the reinforcement bars.

    • The cover of reinforcement is important for protecting the reinforcement from corrosion and ensuring structural integrity.

    • The typical cover of reinforcement for slabs is around 20-30mm, but it can vary depending on the design requirements.

    • Factors such as exposure conditions, concrete quality, and l...

  • Answered by AI
  • Q2. How to calculate of concrete quantity?
  • Ans. 

    Concrete quantity can be calculated by multiplying the volume of the area to be filled by the density of the concrete.

    • Calculate the volume of the area to be filled (length x width x height)

    • Determine the density of the concrete (usually around 2400 kg/m^3)

    • Multiply the volume by the density to get the total concrete quantity needed

    • Consider adding a percentage for wastage or spillage

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. Type of bricks joint?
  • Ans. 

    There are various types of brick joints used in construction, such as flush joint, raked joint, weathered joint, and v-joint.

    • Flush joint is a joint where the mortar is flush with the face of the brick.

    • Raked joint is a joint where the mortar is recessed slightly from the face of the brick.

    • Weathered joint is a joint where the mortar is sloped to allow water to run off.

    • V-joint is a joint where the mortar is shaped like a

  • Answered by AI
  • Q2. Type of bricks,?
  • Ans. 

    There are various types of bricks used in construction, such as clay bricks, concrete bricks, and fire bricks.

    • Clay bricks are made from clay and are commonly used for construction.

    • Concrete bricks are made from concrete and are known for their strength and durability.

    • Fire bricks are made to withstand high temperatures and are used in fireplaces and kilns.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I know the civil work. It' s very good.

Interview Questionnaire 

1 Question

  • Q1. Structure work
Round 1 - Technical 

(1 Question)

  • Q1. Type of Pile Foundation
  • Ans. 

    Pile foundation is a type of deep foundation used to transfer heavy loads of structures to deeper soil or rock strata.

    • Pile foundation can be classified into two types: end-bearing piles and friction piles.

    • End-bearing piles transfer the load of the structure to a hard layer of rock or soil at the bottom of the pile.

    • Friction piles transfer the load of the structure to the soil around the pile through skin friction.

    • Common...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil work hard working be active think positively

I applied via Company Website and was interviewed before Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical question

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical questions .structure work
Related.like road bridge and building.

Interview Questionnaire 

6 Questions

  • Q1.  what is Civil field work ?
  • Q2. I asked him civil works is hardly & response sites staff corporate
  • Q3. What is shutting working?
  • Ans. 

    Shutting working refers to the process of closing or shutting down a construction site or specific area for maintenance, repairs, or safety reasons.

    • Shutting working involves temporarily stopping all construction activities in a designated area.

    • It is done to ensure the safety of workers and the public, as well as to carry out necessary maintenance or repairs.

    • During shutting working, access to the area is restricted, and...

  • Answered by AI
  • Q4. Shutting working is concrete coverly besmenf
  • Q5. What is GFl?
  • Ans. 

    GFl stands for Ground Fault Locator.

    • GFl is a device used to locate ground faults in electrical systems.

    • It helps in identifying the exact location of the fault, which can be crucial for maintenance and repair work.

    • By measuring the flow of current and voltage, GFl can pinpoint the area where the electrical current is leaking to the ground.

    • It is commonly used in industries, construction sites, and power distribution syste...

  • Answered by AI
  • Q6. Ground floor leave

E C R Buildtech Interview FAQs

How many rounds are there in E C R Buildtech Civil Foreman interview?
E C R Buildtech interview process usually has 2 rounds. The most common rounds in the E C R Buildtech interview process are Resume Shortlist and HR.
What are the top questions asked in E C R Buildtech Civil Foreman interview?

Some of the top questions asked at the E C R Buildtech Civil Foreman interview -

  1. How do prepare bbs. Shuttering work prosses , RCC and pqc work, lay out, DPR, a...read more
  2. What is mathod of slab shuttering with plybo...read more
  3. Kindly , make progress report of site activ...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

AmbitionBox Interview Questions
4.9
 • 149 Interviews
Sobha Interview Questions
3.9
 • 128 Interviews
Webdew Interview Questions
4.5
 • 106 Interviews
Data Entry Interview Questions
4.1
 • 97 Interviews
HyScaler Interview Questions
4.5
 • 91 Interviews
View all
E C R Buildtech Civil Foreman Salary
based on 5 salaries
₹3 L/yr - ₹5.3 L/yr
20% less than the average Civil Foreman Salary in India
View more details

E C R Buildtech Civil Foreman Reviews and Ratings

based on 4 reviews

4.3/5

Rating in categories

4.4

Skill development

4.2

Work-life balance

3.7

Salary

4.4

Job security

3.9

Company culture

3.5

Promotions

3.5

Work satisfaction

Explore 4 Reviews and Ratings
Civil Site Engineer
30 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
22 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Manager
17 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Safety Officer
16 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
9 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare E C R Buildtech with

DLF

3.9
Compare

Godrej Properties

3.7
Compare

Prestige Group

4.3
Compare

Sobha

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview