To prepare BBS, shuttering work, RCC and PQC work, lay out, DPR, and quantity, one needs to follow a systematic process.
Understand the project requirements and specifications
Prepare a detailed plan and schedule for each task
Ensure availability of necessary resources and materials
Follow standard procedures for BBS preparation, shuttering work, RCC and PQC work, lay out, DPR, and quantity calculations
Regularly monitor an...
Slab shuttering with plyboard involves creating a formwork using plywood sheets to support the concrete slab during pouring and curing.
Measure and mark the area where the slab will be poured
Cut the plywood sheets to size and lay them on the ground
Secure the plywood sheets together using nails or screws
Install support beams and braces to hold the formwork in place
Pour the concrete into the formwork and allow it to cure
R...
I was interviewed before Feb 2021.
12th
posted on 26 Sep 2022
I applied via Approached by Company and was interviewed in Sep 2022. There were 2 interview rounds.
I prioritize efficient progress, worker safety, and effective manpower management.
I closely monitor project timelines and identify areas where progress can be expedited.
I implement strategies such as streamlining processes, optimizing resource allocation, and utilizing technology to increase productivity.
For example, in my previous role as a Civil Foreman, I introduced a new scheduling system that reduced project compl...
posted on 10 Jan 2022
Pile foundation is a type of deep foundation used to transfer heavy loads of structures to deeper soil or rock strata.
Pile foundation can be classified into two types: end-bearing piles and friction piles.
End-bearing piles transfer the load of the structure to a hard layer of rock or soil at the bottom of the pile.
Friction piles transfer the load of the structure to the soil around the pile through skin friction.
Common...
posted on 12 Feb 2023
I applied via AmbitionBox and was interviewed in Jan 2023. There were 2 interview rounds.
Well foundation is a type of foundation used in civil engineering while tilt shift method is a photography technique.
Well foundation is a type of deep foundation used to support heavy structures on soft soil or water bodies.
It consists of a large diameter well-like structure made of concrete or steel, which is sunk into the ground or waterbed.
The space inside the well is then filled with concrete or stone to provide a ...
Segment lifting process is a technique used in construction to lift and place precast concrete segments for bridge construction.
It involves the use of cranes and specialized lifting equipment.
The segments are lifted and placed in a predetermined sequence to form the bridge deck.
This process is faster and more efficient than traditional bridge construction methods.
Examples of projects that have used segment lifting incl...
I applied via Walk-in and was interviewed in Mar 2024. There were 3 interview rounds.
Beam reinforcement can be checked by visually inspecting the placement, size, and spacing of the steel bars within the beam.
Visually inspect the placement of steel bars within the beam to ensure they are in the correct position as per the design drawings.
Check the size of the steel bars to ensure they meet the specifications outlined in the structural drawings.
Verify the spacing between the steel bars to ensure they ar...
The minimum diameter of rebar for a column depends on the structural design and load requirements.
The minimum diameter of rebar for a column is typically specified in the structural drawings or design documents.
Common minimum diameters for column rebars range from 12mm to 25mm, depending on the size and load-bearing capacity of the column.
The minimum diameter of rebar is important for ensuring the structural integrity ...
Cover of reinforcement of slab refers to the distance between the outer surface of the concrete and the reinforcement bars.
The cover of reinforcement is important for protecting the reinforcement from corrosion and ensuring structural integrity.
The typical cover of reinforcement for slabs is around 20-30mm, but it can vary depending on the design requirements.
Factors such as exposure conditions, concrete quality, and l...
Concrete quantity can be calculated by multiplying the volume of the area to be filled by the density of the concrete.
Calculate the volume of the area to be filled (length x width x height)
Determine the density of the concrete (usually around 2400 kg/m^3)
Multiply the volume by the density to get the total concrete quantity needed
Consider adding a percentage for wastage or spillage
There are various types of brick joints used in construction, such as flush joint, raked joint, weathered joint, and v-joint.
Flush joint is a joint where the mortar is flush with the face of the brick.
Raked joint is a joint where the mortar is recessed slightly from the face of the brick.
Weathered joint is a joint where the mortar is sloped to allow water to run off.
V-joint is a joint where the mortar is shaped like a
There are various types of bricks used in construction, such as clay bricks, concrete bricks, and fire bricks.
Clay bricks are made from clay and are commonly used for construction.
Concrete bricks are made from concrete and are known for their strength and durability.
Fire bricks are made to withstand high temperatures and are used in fireplaces and kilns.
posted on 20 Jul 2017
based on 4 reviews
Rating in categories
Civil Site Engineer
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
22
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
9
salaries
| ₹0 L/yr - ₹0 L/yr |
DLF
Godrej Properties
Prestige Group
Sobha