Earth work of road involves excavation, filling, compaction, and shaping of the ground to create a stable foundation for the road.
Excavation is the process of removing soil and rocks to create space for the road.
Filling involves adding suitable materials like gravel or crushed stones to level the ground.
Compaction is essential to ensure the filled materials are tightly packed and stable.
Shaping the ground involves grad...
Descusosin of road concreting Massonary work
Discuss of site civil activities
Top trending discussions
posted on 19 Jul 2017
posted on 29 Jun 2017
I was interviewed in Feb 2017.
posted on 11 Feb 2021
I applied via Campus Placement and was interviewed before Feb 2020. There were 5 interview rounds.
Cube mould size is a standard size used for testing the compressive strength of concrete.
Cube moulds are typically made of steel or cast iron.
The standard size for cube moulds is 150mm x 150mm x 150mm.
Other sizes such as 100mm x 100mm x 100mm and 200mm x 200mm x 200mm are also used.
The moulds are filled with concrete and left to cure before being tested for compressive strength.
Cube moulds are used to ensure that the c...
To calculate the weight of an 8mm diameter steel rod, use the formula: weight = volume x density.
Calculate the volume of the rod using the formula: volume = π x (diameter/2)^2 x length
Find the density of steel, which is typically around 7850 kg/m^3
Multiply the volume by the density to get the weight of the rod
posted on 7 Sep 2022
I applied via Recruitment Consulltant and was interviewed before Sep 2021. There were 2 interview rounds.
I applied via Newspaper Ad and was interviewed before Apr 2021. There were 2 interview rounds.
What You know
What you mentioned in resume
posted on 24 Aug 2021
I applied via Campus Placement and was interviewed before Aug 2020. There were 4 interview rounds.
Grade M25 is a mix of concrete with a compressive strength of 25 megapascals after 28 days.
M25 is a standard mix of concrete used in construction.
It is made up of 1 part cement, 1 part sand, and 2 parts coarse aggregate.
It has a compressive strength of 25 MPa after 28 days of curing.
It is commonly used in the construction of buildings, bridges, and other structures.
M25 is suitable for moderate exposure conditions and c
posted on 25 Jun 2021
I applied via Company Website and was interviewed before Jun 2020. There were 3 interview rounds.
posted on 14 Nov 2017
I was interviewed before Nov 2016.
Leveling is the process of determining the height or elevation of a point or surface relative to a reference point.
Leveling is commonly used in civil engineering and construction to ensure accurate measurements and proper alignment.
It involves the use of leveling instruments such as a level, theodolite, or laser level.
The process typically includes setting up benchmarks or reference points, taking readings at different...
The diameter of six mm refers to the size or measurement of a circular object that is six millimeters in width.
The diameter is the distance across the center of a circle, passing through the circumference.
A six mm diameter can be visualized as a circle with a width of six millimeters.
It is a common measurement used in various industries, including engineering and manufacturing.
For example, a six mm diameter steel rod w...
LEP stands for Load Equivalent Factor for Pavement design.
LEP is used in pavement design to determine the load-carrying capacity of the pavement.
The formula for LEP depends on the specific design method being used.
For example, in the AASHTO design method, LEP is calculated using the formula: LEP = (ESAL/1000) * (1 + 0.003 * (T - 3))
Here, ESAL is the Equivalent Single Axle Load and T is the pavement design period in yea...
based on 4 interviews
Interview experience
based on 33 reviews
Rating in categories
Deputy Manager
1.2k
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
719
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
407
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
387
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
367
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Reliance Infrastructure
GMR Group
Hindustan Construction Company