Upload Button Icon Add office photos

ATS Infrastructure

Compare button icon Compare button icon Compare

Filter interviews by

ATS Infrastructure Civil Foreman Interview Questions and Answers

Updated 30 May 2024

ATS Infrastructure Civil Foreman Interview Experiences

2 interviews found

Civil Foreman Interview Questions & Answers

user image Anonymous

posted on 30 May 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Question acording construction line
  • Q2. No of brick in 1 cubic meter
  • Ans. 

    The number of bricks in 1 cubic meter varies depending on the size of the bricks used.

    • The number of bricks in 1 cubic meter will depend on the size of the bricks being used.

    • Standard size bricks (190mm x 90mm x 90mm) will have a different count compared to larger or smaller bricks.

    • Calculations can be done by dividing the volume of 1 cubic meter by the volume of a single brick.

  • Answered by AI

Civil Foreman Interview Questions & Answers

user image Anonymous

posted on 24 Oct 2019

Interview Questionnaire 

4 Questions

  • Q1. Ring cutting length
  • Ans. 

    Ring cutting length refers to the measurement of the length of a ring that needs to be cut.

    • Ring cutting length is determined by measuring the circumference of the ring and dividing it by π (pi).

    • The formula for calculating the ring cutting length is: L = C / π, where L is the cutting length and C is the circumference of the ring.

    • For example, if the circumference of a ring is 10 cm, the cutting length would be approximat

  • Answered by AI
  • Q2. Beam Side makeing
  • Q3. Read the drawing
  • Q4. How much slump in concrete grade m-40
  • Ans. 

    The slump in concrete grade m-40 is typically between 75mm to 125mm.

    • Slump is a measure of the consistency or workability of concrete.

    • For concrete grade m-40, the slump range is usually between 75mm to 125mm.

    • Slump is determined by conducting a slump test, where a cone-shaped mold is filled with concrete and then removed to measure the slump.

    • The slump value indicates the flow and compactness of the concrete mix.

    • A higher ...

  • Answered by AI

Civil Foreman Interview Questions Asked at Other Companies

Q1. How do prepare bbs. Shuttering work prosses , RCC and pqc work, l ... read more
asked in HIDADA
Q2. What is slump test constant temperature of concrete in site Dinfi ... read more
asked in Eros Group
Q3. 1.)What is reinforcement and rebar ?2.)where are used what block ... read more
Q4. How calculate zone Azone 3,700m B zone 1000ma& C zone remaini ... read more
Q5. How much slump in concrete grade m-40

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. My experience & my qualification &my knowledge

I applied via Company Website and was interviewed before Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Draw SFD & BMD for a simply supported load.
  • Ans. 

    SFD & BMD for a simply supported load

    • SFD is a diagram that shows the variation of shear force along the length of a beam

    • BMD is a diagram that shows the variation of bending moment along the length of a beam

    • For a simply supported load, the SFD will be a straight line with a constant slope

    • The BMD will be a parabolic curve with the maximum value at the center of the beam

    • The SFD and BMD can be calculated using equations an

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was good and they asked lot of questions about Is codes and from site related questions.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Round was quite easy, for mechanical they had turbo machinery and heat transfer questions and basic SOM,TOM,MD,MF

Round 3 - One-on-one 

(2 Questions)

  • Q1. 1. Tell me about yourself
  • Q2. 2. How lift works and how ACs work and different types of ACs
  • Ans. 

    Lifts work on the principle of pulleys and counterweights while ACs work on the principle of refrigeration.

    • Lifts use a motor to move a counterweight that balances the weight of the lift car and its occupants.

    • ACs use a compressor to compress and expand refrigerant gas to absorb and release heat.

    • Types of ACs include window ACs, split ACs, central ACs, and portable ACs.

    • Window ACs are mounted on windows and cool a single r...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Brush up your skills regarding refrigerations and airconditioning
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Normal question about previous experience
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion and why we leave your previous company

I applied via Naukri.com and was interviewed in Sep 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What is wellding quality absorved
  • Ans. 

    Welding quality is the measure of how well a weld meets the required standards and specifications.

    • Welding quality is determined by factors such as weld strength, appearance, and adherence to welding procedures.

    • It is important to ensure that the weld is free from defects such as cracks, porosity, and incomplete fusion.

    • Quality control measures, such as non-destructive testing, are used to assess the integrity of the weld...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - MEP curriculum and computer based my project

I applied via Walk-in and was interviewed in Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Why bricks are wet during brick work
  • Ans. 

    Bricks are wet during brick work to prevent them from absorbing water from the mortar too quickly.

    • Wet bricks prevent the mortar from drying out too quickly, which can weaken the bond between the bricks and the mortar.

    • Wet bricks also help to prevent efflorescence, a white powdery substance that can form on the surface of bricks due to the migration of salts.

    • Bricks should be dampened, not soaked, before use.

    • The amount of...

  • Answered by AI
  • Q2. Thickness of cement motar in brick work horizontal and vertical
  • Ans. 

    The thickness of cement mortar in brickwork varies depending on the type of brick and the purpose of the wall.

    • For load-bearing walls, the thickness of the mortar should be 10mm for horizontal joints and 8mm for vertical joints.

    • For non-load-bearing walls, the thickness of the mortar can be reduced to 6mm for horizontal joints and 4mm for vertical joints.

    • The type of brick used can also affect the thickness of the mortar....

  • Answered by AI
  • Q3. Chemical names of water proofing
  • Ans. 

    Chemical names of water proofing

    • Acrylic polymers

    • Bituminous coatings

    • Silicones

    • Polyurethane

    • Epoxy resins

  • Answered by AI
  • Q4. Type of tiles used in toilet
  • Ans. 

    Ceramic or porcelain tiles are commonly used in toilets due to their durability and water resistance.

    • Ceramic or porcelain tiles are commonly used in toilets

    • These tiles are durable and water-resistant

    • Other options include natural stone tiles and vinyl tiles

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What are your salary expectations?
  • Ans. 

    I expect a competitive salary based on my qualifications and experience.

    • Research the average salary range for Site Engineers in your area

    • Consider your level of experience and expertise

    • Factor in any additional certifications or specialized skills you possess

    • Be prepared to negotiate and discuss benefits package

    • Example: Based on my research, the average salary range for Site Engineers in this area is $60,000 to $80,000. C...

  • Answered by AI
  • Q2. Share details of your previous job.
  • Ans. 

    I worked as a Site Engineer at XYZ Construction Company.

    • Managed and supervised construction projects on-site.

    • Ensured compliance with building codes and regulations.

    • Collaborated with architects, contractors, and subcontractors.

    • Monitored project progress and resolved any issues that arose.

    • Prepared and maintained project documentation, including reports and drawings.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't be panicked while going to interview
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Difference between one way slab and two slab ?
  • Ans. 

    One way slab is supported on two opposite sides while two way slab is supported on all four sides.

    • One way slab is designed to carry the load in one direction only

    • Two way slab is designed to carry the load in both directions

    • One way slab is economical for small spans and light loads

    • Two way slab is suitable for larger spans and heavy loads

    • One way slab requires less reinforcement compared to two way slab

  • Answered by AI
  • Q2. If the ratio of length and width of slab is 2 or then two . then its a two way slab .
  • Ans. 

    If the ratio of length and width of slab is 2 or more, then it's a two-way slab.

    • A two-way slab is supported by beams on all four sides.

    • The ratio of length and width determines the direction of the main reinforcement.

    • A one-way slab is supported by beams on two opposite sides only.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for DLF Site Engineer interview:
  • structure
Interview preparation tips for other job seekers - always be confident . you never know what is your employer seeking for .
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Tell me about yourself Cement density Brick size Concrete grade
  • Ans. 

    I am a Site Engineer with expertise in cement density, brick size, and concrete grade.

    • I have extensive knowledge of different types of cement and their densities.

    • I am familiar with various brick sizes and their applications in construction.

    • I have experience working with different concrete grades for different structural requirements.

    • I can provide recommendations on the appropriate cement density, brick size, and concre

  • Answered by AI
  • Q2. Soil density Concrete lap joint Slab Cover
Round 3 - HR 

(3 Questions)

  • Q1. Tell me about yourself
  • Ans. 

    I am a dedicated and experienced Site Engineer with a strong background in construction and project management.

    • Bachelor's degree in Civil Engineering

    • 5 years of experience in managing construction projects

    • Proficient in using construction software and tools

    • Strong problem-solving and decision-making skills

    • Excellent communication and leadership abilities

    • Completed successful projects such as building a commercial complex an

  • Answered by AI
  • Q2. Tell me about your family background
  • Ans. 

    My family background is diverse and has influenced my values and work ethic.

    • My parents are both engineers, which inspired me to pursue a career in engineering.

    • I come from a close-knit family that values education and hard work.

    • My grandparents were farmers, teaching me the importance of perseverance and adaptability.

    • I have a sibling who is a doctor, which has given me insights into the medical field.

    • My family has always...

  • Answered by AI
  • Q3. Education qualification

Interview Preparation Tips

Interview preparation tips for other job seekers - Dress well, confident , answer the questions confidently, don't nervous.

ATS Infrastructure Interview FAQs

How many rounds are there in ATS Infrastructure Civil Foreman interview?
ATS Infrastructure interview process usually has 1 rounds. The most common rounds in the ATS Infrastructure interview process are Technical.
What are the top questions asked in ATS Infrastructure Civil Foreman interview?

Some of the top questions asked at the ATS Infrastructure Civil Foreman interview -

  1. How much slump in concrete grade m...read more
  2. Ring cutting leng...read more
  3. No of brick in 1 cubic me...read more

Tell us how to improve this page.

ATS Infrastructure Civil Foreman Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.8
 • 136 Interviews
Lodha Group Interview Questions
4.0
 • 129 Interviews
Kalpataru Limited Interview Questions
4.1
 • 101 Interviews
DLF Interview Questions
3.9
 • 77 Interviews
Colliers India Interview Questions
3.9
 • 70 Interviews
Casagrand Interview Questions
3.8
 • 59 Interviews
View all
ATS Infrastructure Civil Foreman Salary
based on 42 salaries
₹2.8 L/yr - ₹5.2 L/yr
12% less than the average Civil Foreman Salary in India
View more details

ATS Infrastructure Civil Foreman Reviews and Ratings

based on 18 reviews

4.3/5

Rating in categories

4.2

Skill development

4.1

Work-life balance

3.8

Salary

4.0

Job security

4.1

Company culture

3.8

Promotions

4.2

Work satisfaction

Explore 18 Reviews and Ratings
Project Engineer
66 salaries
unlock blur

₹4.2 L/yr - ₹8 L/yr

Assistant Manager
54 salaries
unlock blur

₹4.2 L/yr - ₹9.1 L/yr

Civil Foreman
42 salaries
unlock blur

₹2.8 L/yr - ₹5.2 L/yr

Senior Project Engineer
38 salaries
unlock blur

₹5.4 L/yr - ₹8.4 L/yr

Assistant Project Manager
32 salaries
unlock blur

₹7.1 L/yr - ₹11 L/yr

Explore more salaries
Compare ATS Infrastructure with

Sobha

3.8
Compare

Lodha Group

4.0
Compare

Cushman & Wakefield

4.1
Compare

Godrej Properties

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview