Upload Button Icon Add office photos

ATS Infrastructure

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

ATS Infrastructure Civil Foreman Interview Questions and Answers

Updated 30 May 2024

ATS Infrastructure Civil Foreman Interview Experiences

2 interviews found

Civil Foreman Interview Questions & Answers

user image Anonymous

posted on 30 May 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Question acording construction line
  • Q2. No of brick in 1 cubic meter
  • Ans. 

    The number of bricks in 1 cubic meter varies depending on the size of the bricks used.

    • The number of bricks in 1 cubic meter will depend on the size of the bricks being used.

    • Standard size bricks (190mm x 90mm x 90mm) will have a different count compared to larger or smaller bricks.

    • Calculations can be done by dividing the volume of 1 cubic meter by the volume of a single brick.

  • Answered by AI

Civil Foreman Interview Questions & Answers

user image Anonymous

posted on 24 Oct 2019

Interview Questionnaire 

4 Questions

  • Q1. Ring cutting length
  • Ans. 

    Ring cutting length refers to the measurement of the length of a ring that needs to be cut.

    • Ring cutting length is determined by measuring the circumference of the ring and dividing it by π (pi).

    • The formula for calculating the ring cutting length is: L = C / π, where L is the cutting length and C is the circumference of the ring.

    • For example, if the circumference of a ring is 10 cm, the cutting length would be approximat

  • Answered by AI
  • Q2. Beam Side makeing
  • Q3. Read the drawing
  • Q4. How much slump in concrete grade m-40
  • Ans. 

    The slump in concrete grade m-40 is typically between 75mm to 125mm.

    • Slump is a measure of the consistency or workability of concrete.

    • For concrete grade m-40, the slump range is usually between 75mm to 125mm.

    • Slump is determined by conducting a slump test, where a cone-shaped mold is filled with concrete and then removed to measure the slump.

    • The slump value indicates the flow and compactness of the concrete mix.

    • A higher ...

  • Answered by AI

Civil Foreman Interview Questions Asked at Other Companies

Q1. How do prepare bbs. Shuttering work prosses , RCC and pqc work, l ... read more
asked in HIDADA
Q2. What is slump test constant temperature of concrete in site Dinfi ... read more
asked in Eros Group
Q3. 1.)What is reinforcement and rebar ?2.)where are used what block ... read more
Q4. How calculate zone Azone 3,700m B zone 1000ma& C zone remaini ... read more
Q5. How much slump in concrete grade m-40

Interview questions from similar companies

I was interviewed before Feb 2021.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Case Study 

12th

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil formen ho m mari ko job ki jarurt h

I applied via Approached by Company and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(4 Questions)

  • Q1. Work details and your behavior your attitude your skills your experience You speak true your skills your experience averything
  • Q2. Start is how are you, what is your skills, your experience, your behavior your all details
  • Q3. Your work experience, how you give progress fast, how you save workrs, how you manage manpower
  • Ans. 

    I prioritize efficient progress, worker safety, and effective manpower management.

    • I closely monitor project timelines and identify areas where progress can be expedited.

    • I implement strategies such as streamlining processes, optimizing resource allocation, and utilizing technology to increase productivity.

    • For example, in my previous role as a Civil Foreman, I introduced a new scheduling system that reduced project compl...

  • Answered by AI
  • Q4. How you work experience, you speak true sir I'm working this company 3 years this is my sartifiket

Interview Preparation Tips

Topics to prepare for Shapoorji Pallonji Group Civil Foreman interview:
  • Civil Construction
  • Your work experience
  • Your sartifiket
  • Your behavior
  • Your aducation
  • How to give progress
  • Drawing you know
  • How you expect salary
  • All details
Interview preparation tips for other job seekers - Don't think negative, think positive and speak averything true that sit
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. How to check beam reinforcement?
  • Ans. 

    Beam reinforcement can be checked by visually inspecting the placement, size, and spacing of the steel bars within the beam.

    • Visually inspect the placement of steel bars within the beam to ensure they are in the correct position as per the design drawings.

    • Check the size of the steel bars to ensure they meet the specifications outlined in the structural drawings.

    • Verify the spacing between the steel bars to ensure they ar...

  • Answered by AI
  • Q2. What is the minimum dia rebar of column?
  • Ans. 

    The minimum diameter of rebar for a column depends on the structural design and load requirements.

    • The minimum diameter of rebar for a column is typically specified in the structural drawings or design documents.

    • Common minimum diameters for column rebars range from 12mm to 25mm, depending on the size and load-bearing capacity of the column.

    • The minimum diameter of rebar is important for ensuring the structural integrity ...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Cover of reinforcement of slab?
  • Ans. 

    Cover of reinforcement of slab refers to the distance between the outer surface of the concrete and the reinforcement bars.

    • The cover of reinforcement is important for protecting the reinforcement from corrosion and ensuring structural integrity.

    • The typical cover of reinforcement for slabs is around 20-30mm, but it can vary depending on the design requirements.

    • Factors such as exposure conditions, concrete quality, and l...

  • Answered by AI
  • Q2. How to calculate of concrete quantity?
  • Ans. 

    Concrete quantity can be calculated by multiplying the volume of the area to be filled by the density of the concrete.

    • Calculate the volume of the area to be filled (length x width x height)

    • Determine the density of the concrete (usually around 2400 kg/m^3)

    • Multiply the volume by the density to get the total concrete quantity needed

    • Consider adding a percentage for wastage or spillage

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. Type of bricks joint?
  • Ans. 

    There are various types of brick joints used in construction, such as flush joint, raked joint, weathered joint, and v-joint.

    • Flush joint is a joint where the mortar is flush with the face of the brick.

    • Raked joint is a joint where the mortar is recessed slightly from the face of the brick.

    • Weathered joint is a joint where the mortar is sloped to allow water to run off.

    • V-joint is a joint where the mortar is shaped like a

  • Answered by AI
  • Q2. Type of bricks,?
  • Ans. 

    There are various types of bricks used in construction, such as clay bricks, concrete bricks, and fire bricks.

    • Clay bricks are made from clay and are commonly used for construction.

    • Concrete bricks are made from concrete and are known for their strength and durability.

    • Fire bricks are made to withstand high temperatures and are used in fireplaces and kilns.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I know the civil work. It' s very good.

Interview Questionnaire 

1 Question

  • Q1. Structure work
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed in Jan 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is well foundation and tilt shift method
  • Ans. 

    Well foundation is a type of foundation used in civil engineering while tilt shift method is a photography technique.

    • Well foundation is a type of deep foundation used to support heavy structures on soft soil or water bodies.

    • It consists of a large diameter well-like structure made of concrete or steel, which is sunk into the ground or waterbed.

    • The space inside the well is then filled with concrete or stone to provide a ...

  • Answered by AI
  • Q2. What is segment lifting proseger
  • Ans. 

    Segment lifting process is a technique used in construction to lift and place precast concrete segments for bridge construction.

    • It involves the use of cranes and specialized lifting equipment.

    • The segments are lifted and placed in a predetermined sequence to form the bridge deck.

    • This process is faster and more efficient than traditional bridge construction methods.

    • Examples of projects that have used segment lifting incl...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please give me chance for working with you I'm specialist for bridge project
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Casting ke liye kya chahiye
  • Q2. Sariya ka daya kitne hote hai
  • Q3. Setring ko kaise redi karte hai
Round 2 - One-on-one 

(1 Question)

  • Q1. Igadar kya hai aur t gatar me antar
Round 1 - Technical 

(1 Question)

  • Q1. Type of Pile Foundation
  • Ans. 

    Pile foundation is a type of deep foundation used to transfer heavy loads of structures to deeper soil or rock strata.

    • Pile foundation can be classified into two types: end-bearing piles and friction piles.

    • End-bearing piles transfer the load of the structure to a hard layer of rock or soil at the bottom of the pile.

    • Friction piles transfer the load of the structure to the soil around the pile through skin friction.

    • Common...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil work hard working be active think positively

I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(3 Questions)

  • Q1. Why are you looking for a change?
  • Q2. What are your salary expectations?
  • Q3. Why should we hire you?
Round 3 - One-on-one 

(1 Question)

  • Q1. What you know about core?
  • Ans. 

    Core is the central part of a structure or object that provides strength and stability.

    • Core is commonly used in construction and engineering.

    • It is the central part of a building or structure that provides support and stability.

    • In fitness, core refers to the muscles in the abdomen, back, and pelvis that support the spine.

    • Examples of core materials include concrete, steel, and wood.

    • A strong core is important for maintain

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident on what you know.

Skills evaluated in this interview

Contribute & help others!
anonymous
You can choose to be anonymous

ATS Infrastructure Interview FAQs

How many rounds are there in ATS Infrastructure Civil Foreman interview?
ATS Infrastructure interview process usually has 1 rounds. The most common rounds in the ATS Infrastructure interview process are Technical.
What are the top questions asked in ATS Infrastructure Civil Foreman interview?

Some of the top questions asked at the ATS Infrastructure Civil Foreman interview -

  1. How much slump in concrete grade m...read more
  2. Ring cutting leng...read more
  3. No of brick in 1 cubic me...read more

Recently Viewed

INTERVIEWS

ATS Infrastructure

No Interviews

INTERVIEWS

ATS Infrastructure

No Interviews

INTERVIEWS

ATS Infrastructure

No Interviews

JOBS

Techno Compass Consulting

No Jobs

JOBS

JPMorgan Chase & Co.

No Jobs

INTERVIEWS

Ernstine Fitness Center

No Interviews

JOBS

D Square Consulting Services

No Jobs

JOBS

Piramal Pharma

No Jobs

LIST OF COMPANIES

SMFG India Credit

Locations

INTERVIEWS

Aditya Birla Group

No Interviews

Tell us how to improve this page.

ATS Infrastructure Civil Foreman Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
ATS Infrastructure Civil Foreman Salary
based on 55 salaries
₹2.4 L/yr - ₹5.2 L/yr
14% less than the average Civil Foreman Salary in India
View more details

ATS Infrastructure Civil Foreman Reviews and Ratings

based on 18 reviews

4.3/5

Rating in categories

4.2

Skill development

4.1

Work-life balance

3.8

Salary

4.0

Job security

4.1

Company culture

3.8

Promotions

4.2

Work satisfaction

Explore 18 Reviews and Ratings
Project Engineer
66 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Foreman
55 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
54 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Project Engineer
38 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Project Manager
32 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare ATS Infrastructure with

DLF

3.9
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare

Godrej Properties

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview