Upload Button Icon Add office photos

Filter interviews by

ATS Infrastructure Civil Foreman Interview Questions and Answers

Updated 30 May 2024

ATS Infrastructure Civil Foreman Interview Experiences

2 interviews found

Civil Foreman Interview Questions & Answers

user image Anonymous

posted on 30 May 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Question acording construction line
  • Q2. No of brick in 1 cubic meter
  • Ans. 

    The number of bricks in 1 cubic meter varies depending on the size of the bricks used.

    • The number of bricks in 1 cubic meter will depend on the size of the bricks being used.

    • Standard size bricks (190mm x 90mm x 90mm) will have a different count compared to larger or smaller bricks.

    • Calculations can be done by dividing the volume of 1 cubic meter by the volume of a single brick.

  • Answered by AI

Civil Foreman Interview Questions & Answers

user image Anonymous

posted on 24 Oct 2019

Interview Questionnaire 

4 Questions

  • Q1. Ring cutting length
  • Ans. 

    Ring cutting length refers to the measurement of the length of a ring that needs to be cut.

    • Ring cutting length is determined by measuring the circumference of the ring and dividing it by π (pi).

    • The formula for calculating the ring cutting length is: L = C / π, where L is the cutting length and C is the circumference of the ring.

    • For example, if the circumference of a ring is 10 cm, the cutting length would be approximat

  • Answered by AI
  • Q2. Beam Side makeing
  • Q3. Read the drawing
  • Q4. How much slump in concrete grade m-40
  • Ans. 

    The slump in concrete grade m-40 is typically between 75mm to 125mm.

    • Slump is a measure of the consistency or workability of concrete.

    • For concrete grade m-40, the slump range is usually between 75mm to 125mm.

    • Slump is determined by conducting a slump test, where a cone-shaped mold is filled with concrete and then removed to measure the slump.

    • The slump value indicates the flow and compactness of the concrete mix.

    • A higher ...

  • Answered by AI

Civil Foreman Interview Questions Asked at Other Companies

Q1. How do prepare bbs. Shuttering work prosses , RCC and pqc work, l ... read more
asked in HIDADA
Q2. What is slump test constant temperature of concrete in site Dinfi ... read more
asked in Eros Group
Q3. 1.)What is reinforcement and rebar ?2.)where are used what block ... read more
Q4. How calculate zone Azone 3,700m B zone 1000ma& C zone remaini ... read more
Q5. How much slump in concrete grade m-40

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Jun 2023.

Round 1 - Technical 

(1 Question)

  • Q1. How to do layout, how to calculate column ring cutting length
  • Ans. 

    Layout is done using measurements and tools, column ring cutting length is calculated based on the diameter and height of the column.

    • Use measuring tape and chalk to mark the layout according to the blueprint

    • Calculate the column ring cutting length using the formula: 2 x π x radius + height

    • Ensure accuracy in measurements to avoid errors in construction

  • Answered by AI

I applied via Approached by Company and was interviewed in Aug 2021. There were 3 interview rounds.

Round 1 - Group Discussion 

Project roll. Projects rules & regulations

Round 2 - Aptitude Test 

Coding test. Group discussion

Round 3 - HR 

(1 Question)

  • Q1. My experience peper salary sleep Bank stetment

Interview Preparation Tips

Topics to prepare for VGN Projects Estates Civil Foreman interview:
  • Civil foreman
Interview preparation tips for other job seekers - work xpe in very important. Quality & sefety

I applied via Approached by Company

Interview Preparation Tips

General Tips: Civil formen experience 15 years and fhineceing work
Skills: Leadership
Duration: <1 week
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Explain mivan slab cycle
  • Ans. 

    Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.

    • Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.

    • The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.

    • This method is efficient, cost-effective, and results in high-quality finishes.

    • Mivan slab cycle reduces construction time ...

  • Answered by AI
  • Q2. What will you ensure before concreting
  • Ans. 

    Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.

    • Check formwork for proper alignment and stability

    • Ensure reinforcement bars are correctly placed as per design

    • Verify concrete mix design meets project specifications

    • Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Expected salary if selected
  • Ans. 

    My expected salary is based on my qualifications, experience, and the industry standards.

    • I am looking for a competitive salary that reflects my skills and experience in the civil engineering field.

    • I have researched the average salary range for Civil Site Engineers in this region and industry.

    • I am open to negotiation based on the overall compensation package offered by the company.

    • I am looking for a salary that aligns w...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via campus placement at Shri Vidyanikethan Engineering College, Tirupati and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Tests for concrete and cement
  • Q2. Grades of concrete
  • Ans. 

    Grades of concrete refer to the strength of the concrete mix design.

    • Grades of concrete are denoted by M10, M15, M20, etc. where M stands for mix and the number represents the compressive strength in N/mm^2.

    • Higher grade concrete has higher compressive strength and is used for structural purposes.

    • Common grades include M25, M30, M35, and M40 for heavy-duty structures like bridges and high-rise buildings.

  • Answered by AI
  • Q3. What is slump in concrete
  • Ans. 

    Slump in concrete refers to the measure of consistency of freshly mixed concrete.

    • Slump is determined by the amount of water in the concrete mix.

    • It is measured by filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps.

    • Different types of slumps (true slump, shear slump, collapse slump) indicate different levels of workability and strength of the concrete mix.

    • Slump test is comm...

  • Answered by AI
  • Q4. What is water cement ratio
  • Ans. 

    Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.

    • Water cement ratio is a crucial factor in determining the strength and durability of concrete.

    • A lower water cement ratio results in stronger and more durable concrete.

    • The ideal water cement ratio varies depending on the type of concrete mix and its intended use.

    • For example, a water cement ratio of 0.5 is commonly used ...

  • Answered by AI
  • Q5. What is M20 grade concrete
  • Ans. 

    M20 grade concrete is a mix of 1 part cement, 1.5 parts sand, and 3 parts aggregate, with a compressive strength of 20 MPa.

    • M20 grade concrete is commonly used in residential construction.

    • It is a mix of 1 part cement, 1.5 parts sand, and 3 parts aggregate.

    • The compressive strength of M20 grade concrete is 20 MPa.

    • It is suitable for foundations, beams, columns, and slabs.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - gain practical knowlege
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Abt work Experience?
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Civil engineering my skills
  • Q2. Site engineering skills

Interview Preparation Tips

Interview preparation tips for other job seekers - I have good
1. Project planning
2. AutoCAD
3. Design thinking
4. Relationship Building
5. Revit
6. Staad pro
7. Surveying planning
8. Computer Skill
9. Excellent communication
10. Organizational skills
11. Drawing preparation
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2023. There were 3 interview rounds.

Round 1 - Aptitude Test 

Who is the aptitude of myself

Round 2 - Technical 

(4 Questions)

  • Q1. Who is my projects experience and coluces
  • Q2. Good and nice experience from this company
  • Q3. Good company and nice working place and nice HR communication on time salary
  • Q4. Company giving family insurance and full care of medical emergencies for not only me total family members
Round 3 - HR 

(1 Question)

  • Q1. What is your experience who in old company CTC and present expectations

ATS Infrastructure Interview FAQs

How many rounds are there in ATS Infrastructure Civil Foreman interview?
ATS Infrastructure interview process usually has 1 rounds. The most common rounds in the ATS Infrastructure interview process are Technical.
What are the top questions asked in ATS Infrastructure Civil Foreman interview?

Some of the top questions asked at the ATS Infrastructure Civil Foreman interview -

  1. How much slump in concrete grade m...read more
  2. Ring cutting leng...read more
  3. No of brick in 1 cubic me...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 123 Interviews
Lodha Group Interview Questions
4.0
 • 122 Interviews
DLF Interview Questions
4.0
 • 72 Interviews
Colliers India Interview Questions
3.9
 • 59 Interviews
Casagrand Interview Questions
3.8
 • 52 Interviews
View all
ATS Infrastructure Civil Foreman Salary
based on 58 salaries
₹2.4 L/yr - ₹5.2 L/yr
13% less than the average Civil Foreman Salary in India
View more details

ATS Infrastructure Civil Foreman Reviews and Ratings

based on 18 reviews

4.3/5

Rating in categories

4.2

Skill development

4.1

Work-Life balance

3.9

Salary & Benefits

4.0

Job Security

4.1

Company culture

3.8

Promotions/Appraisal

4.2

Work Satisfaction

Explore 18 Reviews and Ratings
Assistant Manager
76 salaries
unlock blur

₹3.6 L/yr - ₹9.4 L/yr

Project Engineer
66 salaries
unlock blur

₹4.2 L/yr - ₹8 L/yr

Civil Foreman
58 salaries
unlock blur

₹2.4 L/yr - ₹5.2 L/yr

Senior Project Engineer
40 salaries
unlock blur

₹5.4 L/yr - ₹9 L/yr

Assistant Project Manager
32 salaries
unlock blur

₹7.1 L/yr - ₹11 L/yr

Explore more salaries
Compare ATS Infrastructure with

DLF

4.0
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare

Godrej Properties

3.7
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview