ATS Infrastructure Associate Vice President Interview Questions and Answers

Updated 3 Aug 2023

ATS Infrastructure Associate Vice President Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - One-on-one 

(1 Question)

  • Q1. About yourself, details about your experience,
  • Ans. Be yourself and answer with calm
  • Answered Anonymously
Round 3 - One-on-one 

(2 Questions)

  • Q1. Where do u see yourself in 5 years
  • Q2. At some management role

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. About Yourself

Interview Preparation Tips

Round: Test
Experience: Test level was medium, as i also sat for mahindra, i found L&T test was harder than mahindra!
Tips: Just study RS agarwal

Round: Group Discussion
Experience: It was easy for me, coz i was aware about tips of GD
Tips: Be the leader, if possibleTalk in between, even if u dont know topic much
Duration: 20 minutes

Round: Interview
Experience: This question was damn easy for me, coz i can talk more based on my activities & resume
Tips: Dont hesitate, stay calm & describe yourself, but not family background

General Tips: Be yourself, no technical knowledge is required(depends on panel u get)
Skill Tips: ""
College Name: IIT Roorkee
Motivation: To get placed!

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

I was interviewed before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Concrete rate breakup, Asking rate
  • Q2. Unique thumbrules breakup and unit conversion

Interview Preparation Tips

Interview preparation tips for other job seekers - I explained the concrete breakup with the margin of sub contractor, also explain the subcontractor unit rate breakup and Asking rate is anything like in cricket how many balla are remaining and how much u need to score more. Like.

Joining in L&T is my (No) for evey civil engineers dream..
Thumbrules break up
Rebar - (D2/162) ----(Area x Lengh x 7850).
Like

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

Interview Questionnaire 

5 Questions

  • Q1. Pertaining to the mentioned roles and responsibilities in your resume
  • Q2. Planning and work order creation
  • Q3. Piling activities
  • Q4. Introduction
  • Q5. Cross checking of documents

Interview Preparation Tips

Round: Resume Shortlist
Experience: On the criteria that I scored atleast 60% overall and had no gap between job/s.

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

I was interviewed before Mar 2020.

Interview Questionnaire 

2 Questions

  • Q1. Technical
  • Q2. Family background

Interview Preparation Tips

Interview preparation tips for other job seekers - Same

I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Based on your previous jobs

Interview Preparation Tips

Interview preparation tips for other job seekers - It's totally your luck in interview
Contribute & help others!
anonymous
You can choose to be anonymous

ATS Infrastructure Interview FAQs

How many rounds are there in ATS Infrastructure Associate Vice President interview?
ATS Infrastructure interview process usually has 3 rounds. The most common rounds in the ATS Infrastructure interview process are One-on-one Round and Resume Shortlist.

Recently Viewed

INTERVIEWS

Vedanta Aluminium

No Interviews

LIST OF COMPANIES

ArcelorMittal Nippon Steel

Locations

INTERVIEWS

ATS Infrastructure

No Interviews

LIST OF COMPANIES

Vedanta Aluminium

Locations

INTERVIEWS

Vedanta Aluminium

No Interviews

JOBS

Mody University Science Technology

No Jobs

INTERVIEWS

Vedanta Aluminium

No Interviews

LIST OF COMPANIES

Steel Authority Of India

Locations

REVIEWS

Coherent Market Insights

No Reviews

JOBS

Global Connect Business Solutions

No Jobs

Tell us how to improve this page.

ATS Infrastructure Associate Vice President Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 129 Interviews
Lodha Group Interview Questions
4.0
 • 126 Interviews
DLF Interview Questions
3.9
 • 75 Interviews
Colliers India Interview Questions
3.9
 • 66 Interviews
View all
Project Engineer
66 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Foreman
55 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
54 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Project Engineer
38 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Project Manager
32 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare ATS Infrastructure with

DLF

3.9
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare

Godrej Properties

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview