I applied via Company Website and was interviewed in Mar 2023. There were 3 interview rounds.
Flexible pavement and rigid pavement are two types of pavements used in different types of road projects.
Flexible pavement is made of multiple layers of materials that can flex under traffic loads.
Rigid pavement is made of a single layer of concrete or asphalt that is rigid and does not flex.
New projects involve constructing roads from scratch, while realignment projects involve changing the alignment of existing roads...
The question describes the application of prime coat and tack coat on a WMM surface.
Prime coat is a low viscous cut back bitumen used to fill up pores and voids on a WMM surface.
Tack coat is a light application of bitumen, asphalt, emulsion, or dilute water applied on the prime coat.
The purpose of the prime coat is to bond the WMM surface with the subsequent layers of asphalt.
The tack coat helps in providing a strong b...
Design procedure for 150mm DLC thickness using M15 grade concrete with specific requirements for cement content, testing, mixing, transportation, compaction, and curing.
Use M15 grade concrete with maximum aggregate cement ratio of 12:1
Minimum cement content of 150kg per cum, or 120kg per cum if flyash is more than 20%
Perform 5 sample cube test after 7 day curing with strength of 10 MPA, and 1 sample cube test after 7 d...
Design procedure for Senior Project Manager role including cement content, strength, joint design, and surface finishing.
Minimum cement content of 360 kg per cum, or 310 kg per cum if fly ash is more than 20%
Flexure strength of cement concrete after 28 days curing is 4.5 MPA
Compressive strength of cement concrete after 28 days curing is 40 MPA
Dowel bar provided for expansion joint vehicle load transfer between slabs
Tie...
I applied via Recruitment Consulltant and was interviewed before Nov 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Nov 2023. There was 1 interview round.
Cyclic loading in soil refers to repeated application of stress on soil over time, leading to changes in soil properties.
Cyclic loading can cause soil to undergo changes in density, strength, and deformation characteristics.
Examples of cyclic loading include traffic loads on roads, wave action on coastal soils, and seismic activity on earthquake-prone regions.
Liquefaction calculation involves determining the potential for soil to lose strength and behave like a liquid during an earthquake.
Liquefaction occurs when loosely packed, water-saturated soils lose strength due to increased pore water pressure during seismic shaking.
Calculations involve assessing factors such as soil type, density, saturation, and earthquake intensity to predict liquefaction potential.
Methods like th...
G R Infraprojects interview questions for popular designations
I applied via Company Website and was interviewed before Sep 2022. There were 4 interview rounds.
Get interview-ready with Top G R Infraprojects Interview Questions
I applied via Job Portal
GRN t code in SAP is used to create goods receipt notes for incoming materials.
GRN stands for Goods Receipt Note.
It is used to record the receipt of goods from a vendor or supplier.
The GRN t code in SAP allows users to enter details such as the material received, quantity, batch number, and storage location.
It helps in maintaining accurate inventory records and tracking the movement of goods within the organization.
GRN...
I applied via campus placement at National Institute of Construction Management and Research, Pune and was interviewed before Sep 2023. There were 2 interview rounds.
Technical civil engineering
An extra dozed bridge is a type of bridge structure that provides additional support and stability to the main bridge structure.
Extra dozed bridges are commonly used in areas with high seismic activity to prevent collapse during earthquakes.
These bridges typically have additional support columns or braces to distribute weight and reduce stress on the main structure.
Examples of extra dozed bridges include the Akashi Kai...
Contracts domain is crucial for road sector development and management.
Contracts ensure that all parties involved in road projects are clear about their roles and responsibilities.
They help in setting project timelines, budgets, and quality standards.
Contracts also provide a legal framework for dispute resolution and risk management.
For example, a contract between a government and a construction company for building a ...
Prolongation claim refers to the additional time and cost incurred due to delays in project completion.
Prolongation claims are common in construction contracts.
There are two types of prolongation claims - compensable and non-compensable.
Compensable prolongation claims are those where the contractor is entitled to additional time and cost due to delays caused by the owner or other parties.
Non-compensable prolongation cl...
posted on 16 Jan 2025
I applied via Naukri.com and was interviewed before Jan 2024. There were 2 interview rounds.
Related to my CV as per my profile
Top trending discussions
Some of the top questions asked at the G R Infraprojects interview -
The duration of G R Infraprojects interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 154 interviews
Interview experience
based on 1.5k reviews
Rating in categories
Assistant Manager
389
salaries
| ₹4.4 L/yr - ₹11.5 L/yr |
Senior Engineer
224
salaries
| ₹3.6 L/yr - ₹8.6 L/yr |
Engineer
137
salaries
| ₹2 L/yr - ₹6.8 L/yr |
Deputy Manager
125
salaries
| ₹6.6 L/yr - ₹17.5 L/yr |
Structural Engineer
123
salaries
| ₹2 L/yr - ₹6.3 L/yr |
Nagarjuna Construction Company
Ashoka Buildcon
IRB Infrastructure
Simplex Infrastructures