Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by G R Infraprojects Team. If you also belong to the team, you can get access from here

G R Infraprojects Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

G R Infraprojects Interview Questions, Process, and Tips

Updated 15 Feb 2025

Top G R Infraprojects Interview Questions and Answers

View all 87 questions

G R Infraprojects Interview Experiences

Popular Designations

132 interviews found

Assistant Manager Planning and monitoring Interview Questions & Answers

user image Anonymous

posted on 2 Sep 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Basic question related to previous experience and expectations.
Round 3 - Technical 

(1 Question)

  • Q1. Question on basic question related to planning and scheduling
Round 1 - Technical 

(15 Questions)

  • Q1. Two types of pavent 1:- Flexible pavement 2:-rigid pavement Types of progect 1:- New progect 2:- Realigment of road
  • Ans. 

    Flexible pavement and rigid pavement are two types of pavements used in different types of road projects.

    • Flexible pavement is made of multiple layers of materials that can flex under traffic loads.

    • Rigid pavement is made of a single layer of concrete or asphalt that is rigid and does not flex.

    • New projects involve constructing roads from scratch, while realignment projects involve changing the alignment of existing roads...

  • Answered by AI
  • Q2. Constrution process:- surveying, enchrochment ,NGL, OGL
  • Q3. Flexibile road :- 1:- Embankment as per site now taken thickness 3M , Large size of soil particles75mm lumps& cloud , liquid index<50% , plastic limit <25% , Swelling &shrinkage <50% , effective cbr as per...
  • Q4. 3:- confinement layer or new blanket
  • Q5. 4:- WMM:- It is mixture of aggregate and binding material, aggregate size4.75mm to 20mm. Binding material used stone dust ,morum,flyash, total compacted 300mm. Two layer 150mm &150mm. It is mix in pre mix...
  • Q6. (a) Prime coat:- low viscous cut back bitumen on wmm surface area fil up pores and void. (b) Tack coat:- Light application bitumen, ashphalt,emulsion,and dilute water applied on the prim coat.
  • Ans. 

    The question describes the application of prime coat and tack coat on a WMM surface.

    • Prime coat is a low viscous cut back bitumen used to fill up pores and voids on a WMM surface.

    • Tack coat is a light application of bitumen, asphalt, emulsion, or dilute water applied on the prime coat.

    • The purpose of the prime coat is to bond the WMM surface with the subsequent layers of asphalt.

    • The tack coat helps in providing a strong b...

  • Answered by AI
  • Q7. 5 :- DBM:- It is total thickness 150mm. Compacted in two layer 100mm & 50mm Aggregate size 20mm to 28mm ,bitumen viscous grade VG30 grade bitumen mixture.
  • Q8. Tack coat :- light application bitumen ,Asphalt, emulsion,and diluted water on the surface area of DBM.
  • Q9. 6:- BC :- It is total thicness 50 mm compacted. It is mixture of aggregate size 13.1mm bitumen VG30 grade viscous.
  • Q10. 7:- Seal :- 6mm to 8mm thickness grvel or coarse sand mix with bitumen on BC course .provided camber on flexble pavement 1in 40 to 1in 40.
  • Q11. RIGID PAVEMENT :- All the process of embankment to GSB is same. DLC:- Specification 1 :- Aggregate size 26.5 mm 2:-water absorption<2% 3 :- soundness test :- Naso4 12% ...
  • Q12. DESIGIN PROCEDURE :- DLC thickness 150mm. 1:- use M15 grade concrete,max aggregate cement ratio 12:1 2:-The minimum cement content 150kg per cum. If flayash is more than >20% the mini.mum cement content. ...
  • Ans. 

    Design procedure for 150mm DLC thickness using M15 grade concrete with specific requirements for cement content, testing, mixing, transportation, compaction, and curing.

    • Use M15 grade concrete with maximum aggregate cement ratio of 12:1

    • Minimum cement content of 150kg per cum, or 120kg per cum if flyash is more than 20%

    • Perform 5 sample cube test after 7 day curing with strength of 10 MPA, and 1 sample cube test after 7 d...

  • Answered by AI
  • Q13. PQC:- TOTAL THICKNESS 300MM Aggregate size 31.5mm. All specificition is same as DLC.
  • Q14. Design procedure :- 1 :- The minimum cement content 360 kg per cum.if the fly ash is more than 20% the minimum cement content 310 kg per cum. 2 :-The flexure strength of cement concrete after 28 days cur...
  • Ans. 

    Design procedure for Senior Project Manager role including cement content, strength, joint design, and surface finishing.

    • Minimum cement content of 360 kg per cum, or 310 kg per cum if fly ash is more than 20%

    • Flexure strength of cement concrete after 28 days curing is 4.5 MPA

    • Compressive strength of cement concrete after 28 days curing is 40 MPA

    • Dowel bar provided for expansion joint vehicle load transfer between slabs

    • Tie...

  • Answered by AI
  • Q15. CBR:- Developed by calforina division state highway to classiy soil sub grade &GSB CBR=3%-25% CLAY<8% SAND 15% -35% GRAVEL>25% THICKNESS OF PAVEMENT T=( 1.75P/CBR - A/3.14)

Interview Preparation Tips

Interview preparation tips for other job seekers - Other type as per location of the site.
Type of material used in high way.
highway -2 to 4 lane
Expressway- 6 to 8 lane
VUP =5.5 M
LVUP=3.5M
CUP=3M

Senior Project Manager Interview Questions asked at other Companies

Q1. DESIGIN PROCEDURE :- DLC thickness 150mm. 1:- use M15 grade concrete,max aggregate cement ratio 12:1 2:-The minimum cement content 150kg per cum. If flayash is more than &gt;20% the mini.mum cement content. 120kg pet cum 3:- The 5 no sample... read more
View answer (3)
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Nov 2023. There were 2 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. General discussion
Round 2 - One-on-one 

(1 Question)

  • Q1. General discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - I will never recommend GR Infra Projects Ltd to any aspiring candidate for Leadership role.

POOR and PATHETIC culture.

This is not the place to work for Senior level candidates.

GR Infra is in Self Destruction mode and getting split by 3rd generation siblings due to rift.

Vice President Interview Questions asked at other Companies

Q1. What will you do if a customer register a complaint against you in the company ?
View answer (3)
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Nov 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Explain cyclic loading in soil?
  • Ans. 

    Cyclic loading in soil refers to repeated application of stress on soil over time, leading to changes in soil properties.

    • Cyclic loading can cause soil to undergo changes in density, strength, and deformation characteristics.

    • Examples of cyclic loading include traffic loads on roads, wave action on coastal soils, and seismic activity on earthquake-prone regions.

  • Answered by AI
  • Q2. Please elaborate on liquefaction calculation?
  • Ans. 

    Liquefaction calculation involves determining the potential for soil to lose strength and behave like a liquid during an earthquake.

    • Liquefaction occurs when loosely packed, water-saturated soils lose strength due to increased pore water pressure during seismic shaking.

    • Calculations involve assessing factors such as soil type, density, saturation, and earthquake intensity to predict liquefaction potential.

    • Methods like th...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Go through IS codes well.

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (56)

G R Infraprojects interview questions for popular designations

 Senior Engineer

 (7)

 Assistant Manager

 (6)

 Deputy Manager

 (4)

 Structural Engineer

 (4)

 Civil Engineer

 (3)

 Planning Manager

 (3)

 Senior Structural Engineer

 (3)

 Civil Foreman

 (2)

DPM Interview Questions & Answers

user image Amiya Amitabh Mohanty

posted on 20 Sep 2023

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Sep 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Experience, Codes and Standards, Quality, Contract etc.
Round 3 - Technical 

(1 Question)

  • Q1. Design, Machine and Manpower utilisation, Experience, Innovative ideas if you have done in any project, etc
Round 4 - HR 

(1 Question)

  • Q1. Documents, Present Salary with expectations, Notice period etc.

Get interview-ready with Top G R Infraprojects Interview Questions

Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Job Portal

Round 1 - HR 

(2 Questions)

  • Q1. Oil drum me 15 w 40 me w ka kya value hai
  • Q2. Grn t code in SAP
  • Ans. 

    GRN t code in SAP is used to create goods receipt notes for incoming materials.

    • GRN stands for Goods Receipt Note.

    • It is used to record the receipt of goods from a vendor or supplier.

    • The GRN t code in SAP allows users to enter details such as the material received, quantity, batch number, and storage location.

    • It helps in maintaining accurate inventory records and tracking the movement of goods within the organization.

    • GRN...

  • Answered by AI

Skills evaluated in this interview

Office Assistant Interview Questions asked at other Companies

Q1. Market share of motorcycle in North Zone viz Delhi, Haryana, Rajasthan, Punjab, Chandigarh, Jammu and Kashmir
View answer (5)

Jobs at G R Infraprojects

View all
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at National Institute of Construction Management and Research, Pune and was interviewed before Sep 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Technical civil engineering

Round 2 - Technical 

(2 Questions)

  • Q1. Experience details
  • Q2. Concept of extra dozed bridge
  • Ans. 

    An extra dozed bridge is a type of bridge structure that provides additional support and stability to the main bridge structure.

    • Extra dozed bridges are commonly used in areas with high seismic activity to prevent collapse during earthquakes.

    • These bridges typically have additional support columns or braces to distribute weight and reduce stress on the main structure.

    • Examples of extra dozed bridges include the Akashi Kai...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Awesome company. Give your best in your domain.

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (54)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Importance of Contracts domain in road sector
  • Ans. 

    Contracts domain is crucial for road sector development and management.

    • Contracts ensure that all parties involved in road projects are clear about their roles and responsibilities.

    • They help in setting project timelines, budgets, and quality standards.

    • Contracts also provide a legal framework for dispute resolution and risk management.

    • For example, a contract between a government and a construction company for building a ...

  • Answered by AI
  • Q2. Prolongation claim and it's types
  • Ans. 

    Prolongation claim refers to the additional time and cost incurred due to delays in project completion.

    • Prolongation claims are common in construction contracts.

    • There are two types of prolongation claims - compensable and non-compensable.

    • Compensable prolongation claims are those where the contractor is entitled to additional time and cost due to delays caused by the owner or other parties.

    • Non-compensable prolongation cl...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company to work with. Flexible timings and good work culture

Assistant General Manager Contract Interview Questions asked at other Companies

Q1. How the basic Rate concept works? Which are the items to be considered for Basic Rate?
View answer (1)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jan 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Related to my CV as per my profile

Round 2 - HR 

(2 Questions)

  • Q1. CTC and expected CTC
  • Q2. Notices period

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good company. I advise to join this company if you got offer from the side of company

Senior Executive Human Resources and Industrial Relations Administrator Interview Questions asked at other Companies

Q1. What is the process for handling manpower and payroll?
View answer (1)
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. They asked me about your self.
Round 3 - Technical 

(1 Question)

  • Q1. Nos of Question they asked me from my C.V
Round 4 - HR 

(1 Question)

  • Q1. Salary and location discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - 80% Question they will asked from your C.V .So only mentioned those responsibility in your c.v that you know about.

Senior Quality Control Engineer Interview Questions asked at other Companies

Q1. In cube compression testing why our concrete cube breaks more at middle of cube? explain with technical reasons behind that.
View answer (1)

G R Infraprojects Interview FAQs

How many rounds are there in G R Infraprojects interview?
G R Infraprojects interview process usually has 2-3 rounds. The most common rounds in the G R Infraprojects interview process are Technical, Resume Shortlist and HR.
How to prepare for G R Infraprojects interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at G R Infraprojects. The most common topics and skills that interviewers at G R Infraprojects expect are Substation, Highways, Project Management, Planning and Transmission Line.
What are the top questions asked in G R Infraprojects interview?

Some of the top questions asked at the G R Infraprojects interview -

  1. DESIGIN PROCEDURE :- DLC thickness 150mm. 1:- use M15 grade concrete,max aggreg...read more
  2. Design procedure :- 1 :- The minimum cement content 360 kg per cum.if the fly ...read more
  3. Two types of pavent 1:- Flexible pavement 2:-rigid pavement Types of progect 1:...read more
How long is the G R Infraprojects interview process?

The duration of G R Infraprojects interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

G R Infraprojects Interview Process

based on 154 interviews

Interview experience

4.4
  
Good
View more

G R Infraprojects Reviews and Ratings

based on 1.5k reviews

4.1/5

Rating in categories

3.9

Skill development

3.8

Work-life balance

3.9

Salary

3.6

Job security

3.8

Company culture

3.6

Promotions

3.8

Work satisfaction

Explore 1.5k Reviews and Ratings
Manager / Senior Manager Contracts

Gurgaon / Gurugram

10-15 Yrs

Not Disclosed

Architectural Designer - BIM

Gurgaon / Gurugram

5-8 Yrs

Not Disclosed

Assistant Manager / Senior Engineer - Billing & QS

Khammam,

Madanapalle

4-8 Yrs

₹ 10-10.8 LPA

Explore more jobs
Assistant Manager
389 salaries
unlock blur

₹4.4 L/yr - ₹11.5 L/yr

Senior Engineer
224 salaries
unlock blur

₹3.6 L/yr - ₹8.6 L/yr

Engineer
137 salaries
unlock blur

₹2 L/yr - ₹6.8 L/yr

Deputy Manager
125 salaries
unlock blur

₹6.6 L/yr - ₹17.5 L/yr

Structural Engineer
123 salaries
unlock blur

₹2 L/yr - ₹6.3 L/yr

Explore more salaries
Compare G R Infraprojects with

Nagarjuna Construction Company

4.1
Compare

Ashoka Buildcon

4.0
Compare

IRB Infrastructure

4.0
Compare

Simplex Infrastructures

3.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview