I applied via Referral and was interviewed before Nov 2022. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before May 2022. There were 3 interview rounds.
I applied via Company Website and was interviewed before May 2022. There were 3 interview rounds.
I applied via Newspaper Ad and was interviewed in Jan 2022. There were 2 interview rounds.
G R Infraprojects interview questions for popular designations
Get interview-ready with Top G R Infraprojects Interview Questions
I applied via LinkedIn and was interviewed in Feb 2022. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Sep 2022. There were 3 interview rounds.
I applied via Approached by company
I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed in May 2021. There were 4 interview rounds.
Risk assessment involves identifying hazards, evaluating the likelihood and severity of harm, and implementing control measures.
Identify hazards and potential sources of harm
Evaluate the likelihood and severity of harm
Implement control measures to eliminate or reduce risks
Review and monitor the effectiveness of control measures
Communicate findings and control measures to relevant parties
Major hazards associated with metro project include electrical hazards, fire hazards, construction hazards, and health hazards.
Electrical hazards due to high voltage power lines and electrical equipment
Fire hazards due to flammable materials and inadequate fire safety measures
Construction hazards such as falls, collapsing structures, and heavy machinery accidents
Health hazards due to dust, noise, and exposure to hazard...
LG stands for Lifting Gear. Safety devices and procedures for lifting include proper training, inspection of equipment, and use of personal protective equipment.
LG refers to equipment used for lifting heavy loads, such as cranes, hoists, and slings
Safety devices for lifting include limit switches, overload protection, and emergency stop buttons
Procedures for lifting include proper rigging, load balancing, and communica...
To prepare a lifting plan, factors such as weight, size, shape, and center of gravity of the load must be considered. For tandem lifting, coordination between the two cranes is crucial.
Determine the weight, size, shape, and center of gravity of the load
Select appropriate lifting equipment and rigging
Identify potential hazards and plan for contingencies
Ensure proper communication and coordination between the two cranes
A...
HSE plan includes policies, procedures, and guidelines for managing health, safety, and environmental risks in the workplace.
Risk assessment and management
Emergency response procedures
Training and education programs
Incident reporting and investigation
Environmental management
Safety audits and inspections
Personal protective equipment requirements
Contractor management
Regulatory compliance
Communication and consultation wit
Public interference can be controlled through effective communication, crowd management techniques, and strict enforcement of rules and regulations.
Establish clear communication channels with the public and provide them with regular updates on the situation.
Train staff in crowd management techniques to ensure that they can handle large crowds safely and efficiently.
Enforce rules and regulations strictly to deter indivi...
Top trending discussions
Some of the top questions asked at the G R Infraprojects interview -
The duration of G R Infraprojects interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 158 interviews
Interview experience
based on 1.5k reviews
Rating in categories
Assistant Manager
350
salaries
| ₹4.4 L/yr - ₹11.5 L/yr |
Senior Engineer
224
salaries
| ₹3.6 L/yr - ₹8.6 L/yr |
Engineer
137
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Deputy Manager
132
salaries
| ₹6.6 L/yr - ₹17.5 L/yr |
Structural Engineer
122
salaries
| ₹2 L/yr - ₹6.3 L/yr |
Nagarjuna Construction Company
PNC Infratech
Ashoka Buildcon
IRB Infrastructure