I applied via Company Website and was interviewed before May 2022. There were 3 interview rounds.
I have 10 years of experience in highway engineering.
I have worked on various highway projects including design, construction, and maintenance.
I have experience in managing teams and coordinating with clients and stakeholders.
I have knowledge of relevant software and regulations such as AutoCAD and AASHTO standards.
I have also conducted research and analysis on traffic flow and safety measures.
Overall, my experience ha...
Looking for new challenges and opportunities to grow professionally.
Seeking a more challenging role
Desire to work on larger projects
Opportunity for professional growth
Company culture not aligned with personal values
Lack of job security or stability
PQC, DLC, and GSB are all types of road construction materials.
PQC stands for Pavement Quality Concrete and is a type of concrete used for road surfaces.
DLC stands for Dry Lean Concrete and is a type of concrete used as a base layer for road construction.
GSB stands for Granular Sub Base and is a layer of compacted granular material used as a foundation for road construction.
All three materials are commonly used in road...
GSB Gradation is a method of grading aggregates used in road construction.
GSB stands for Granular Sub-Base.
It is a method of grading aggregates based on their particle size.
The gradation is important for ensuring proper compaction and stability of the road.
The gradation is specified in terms of percentage passing different sieve sizes.
For example, GSB 20 gradation means that 100% of the aggregates pass through a 20mm s
Rigid pavements are made of concrete while flexible pavements are made of asphalt.
Rigid pavements have high flexural strength and low deflection while flexible pavements have low flexural strength and high deflection.
Rigid pavements are more durable and have a longer lifespan than flexible pavements.
Flexible pavements are easier and cheaper to construct and maintain than rigid pavements.
Examples of rigid pavements incl...
Top trending discussions
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
posted on 2 Sep 2021
I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 10 Sep 2017
I appeared for an interview before Sep 2016.
posted on 12 May 2018
posted on 14 Jul 2017
I appeared for an interview before Jul 2016.
posted on 9 Oct 2021
I applied via Company Website and was interviewed before Oct 2020. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.
posted on 4 May 2019
based on 4 interviews
Interview experience
based on 12 reviews
Rating in categories
Assistant Manager
357
salaries
| ₹4.4 L/yr - ₹11.5 L/yr |
Senior Engineer
227
salaries
| ₹3.6 L/yr - ₹8.4 L/yr |
Engineer
138
salaries
| ₹2.2 L/yr - ₹6.5 L/yr |
Deputy Manager
129
salaries
| ₹6.6 L/yr - ₹16 L/yr |
Structural Engineer
122
salaries
| ₹2 L/yr - ₹6.3 L/yr |
Larsen & Toubro Limited
Tata Projects
L&T Construction
Megha Engineering & Infrastructures