Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by G R Infraprojects Team. If you also belong to the team, you can get access from here

G R Infraprojects Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

G R Infraprojects Senior Project Manager Interview Questions, Process, and Tips

Updated 8 Sep 2022

G R Infraprojects Senior Project Manager Interview Experiences

1 interview found

Round 1 - Technical 

(15 Questions)

  • Q1. Two types of pavent 1:- Flexible pavement 2:-rigid pavement Types of progect 1:- New progect 2:- Realigment of road
  • Ans. 

    Flexible pavement and rigid pavement are two types of pavements used in different types of road projects.

    • Flexible pavement is made of multiple layers of materials that can flex under traffic loads.

    • Rigid pavement is made of a single layer of concrete or asphalt that is rigid and does not flex.

    • New projects involve constructing roads from scratch, while realignment projects involve changing the alignment of existing roads...

  • Answered by AI
  • Q2. Constrution process:- surveying, enchrochment ,NGL, OGL
  • Q3. Flexibile road :- 1:- Embankment as per site now taken thickness 3M , Large size of soil particles75mm lumps& cloud , liquid index<50% , plastic limit <25% , Swelling &shrinkage <50% , effective cbr as per...
  • Q4. 3:- confinement layer or new blanket
  • Q5. 4:- WMM:- It is mixture of aggregate and binding material, aggregate size4.75mm to 20mm. Binding material used stone dust ,morum,flyash, total compacted 300mm. Two layer 150mm &150mm. It is mix in pre mix...
  • Q6. (a) Prime coat:- low viscous cut back bitumen on wmm surface area fil up pores and void. (b) Tack coat:- Light application bitumen, ashphalt,emulsion,and dilute water applied on the prim coat.
  • Ans. 

    The question describes the application of prime coat and tack coat on a WMM surface.

    • Prime coat is a low viscous cut back bitumen used to fill up pores and voids on a WMM surface.

    • Tack coat is a light application of bitumen, asphalt, emulsion, or dilute water applied on the prime coat.

    • The purpose of the prime coat is to bond the WMM surface with the subsequent layers of asphalt.

    • The tack coat helps in providing a strong b...

  • Answered by AI
  • Q7. 5 :- DBM:- It is total thickness 150mm. Compacted in two layer 100mm & 50mm Aggregate size 20mm to 28mm ,bitumen viscous grade VG30 grade bitumen mixture.
  • Q8. Tack coat :- light application bitumen ,Asphalt, emulsion,and diluted water on the surface area of DBM.
  • Q9. 6:- BC :- It is total thicness 50 mm compacted. It is mixture of aggregate size 13.1mm bitumen VG30 grade viscous.
  • Q10. 7:- Seal :- 6mm to 8mm thickness grvel or coarse sand mix with bitumen on BC course .provided camber on flexble pavement 1in 40 to 1in 40.
  • Q11. RIGID PAVEMENT :- All the process of embankment to GSB is same. DLC:- Specification 1 :- Aggregate size 26.5 mm 2:-water absorption<2% 3 :- soundness test :- Naso4 12% ...
  • Q12. DESIGIN PROCEDURE :- DLC thickness 150mm. 1:- use M15 grade concrete,max aggregate cement ratio 12:1 2:-The minimum cement content 150kg per cum. If flayash is more than >20% the mini.mum cement content. ...
  • Ans. 

    Design procedure for 150mm DLC thickness using M15 grade concrete with specific requirements for cement content, testing, mixing, transportation, compaction, and curing.

    • Use M15 grade concrete with maximum aggregate cement ratio of 12:1

    • Minimum cement content of 150kg per cum, or 120kg per cum if flyash is more than 20%

    • Perform 5 sample cube test after 7 day curing with strength of 10 MPA, and 1 sample cube test after 7 d...

  • Answered by AI
  • Q13. PQC:- TOTAL THICKNESS 300MM Aggregate size 31.5mm. All specificition is same as DLC.
  • Q14. Design procedure :- 1 :- The minimum cement content 360 kg per cum.if the fly ash is more than 20% the minimum cement content 310 kg per cum. 2 :-The flexure strength of cement concrete after 28 days cur...
  • Ans. 

    Design procedure for Senior Project Manager role including cement content, strength, joint design, and surface finishing.

    • Minimum cement content of 360 kg per cum, or 310 kg per cum if fly ash is more than 20%

    • Flexure strength of cement concrete after 28 days curing is 4.5 MPA

    • Compressive strength of cement concrete after 28 days curing is 40 MPA

    • Dowel bar provided for expansion joint vehicle load transfer between slabs

    • Tie...

  • Answered by AI
  • Q15. CBR:- Developed by calforina division state highway to classiy soil sub grade &GSB CBR=3%-25% CLAY<8% SAND 15% -35% GRAVEL>25% THICKNESS OF PAVEMENT T=( 1.75P/CBR - A/3.14)

Interview Preparation Tips

Interview preparation tips for other job seekers - Other type as per location of the site.
Type of material used in high way.
highway -2 to 4 lane
Expressway- 6 to 8 lane
VUP =5.5 M
LVUP=3.5M
CUP=3M

Senior Project Manager Jobs at G R Infraprojects

View all

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - Technical 

(1 Question)

  • Q1. Procedure of project start up.
Round 2 - Cost Estimate 

(1 Question)

  • Q1. Preparation of CTC
Round 3 - HR 

(1 Question)

  • Q1. Benefit and pakage
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Aug 2024.

Round 1 - Group Discussion 

Rounds on technical aptitude and on process managemnet.

Round 2 - Case Study 

Case study situatiknal questions etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Revise the technical skills and have a great work discussion be transparent and fare
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. DDUGJY Project;- 33/11 KV New PSS ,33 KV Line ,11 KV Line and LT Line
  • Ans. Rerea of New PSS 60*40 mtr control room 1700 sqft road 60 mtr width 3.75 mtr footpath 15 mtr , fencing 40 mtr cable trench 130 mtr , 2 no 5 MVA PTR, 800Amp VCB and 800 Amp rating isolator in switch yards area. cost of civil work by sub cotractor 1.15 cr and electrical work 9.85 lac.
  • Answered Anonymously
  • Q2. RGGVY 12th Plan , HVDS Project, and Segrigation
  • Q3. ADB Project 33/11 KV New PSS R&M 33&11 KV line LT Line
Round 3 - HR 

(1 Question)

  • Q1. Final negotiation of salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Please consider as per work profile in electrical feild

Senior Project Manager Interview Questions & Answers

Tata Projects user image Shashi kumar S. BE. PMP. Primavera

posted on 8 Jun 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Project management process
  • Ans. 

    Project management process involves initiating, planning, executing, monitoring, and closing a project.

    • Initiating: Define project scope, objectives, and stakeholders.

    • Planning: Create a detailed project plan, schedule, and budget.

    • Executing: Implement the project plan and manage resources.

    • Monitoring: Track progress, identify issues, and make adjustments.

    • Closing: Finalize project deliverables and evaluate project success.

  • Answered by AI
  • Q2. Design, schedule , cash flow, budget & tendering
Round 3 - Technical 

(2 Questions)

  • Q1. Planning software & its expertise
  • Ans. 

    I have expertise in using various planning software such as Microsoft Project, Asana, and Trello to effectively manage projects.

    • Proficient in creating project plans, assigning tasks, and tracking progress using planning software

    • Skilled in resource allocation, budget management, and timeline scheduling within the software

    • Experience in generating reports, Gantt charts, and project timelines for stakeholders

    • Familiar with ...

  • Answered by AI
  • Q2. Design process - pre-construction sequence

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for PMP
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Why we are use lap in centre of column or Zone B?
  • Ans. 

    Lap is used in the center of a column or Zone B for structural stability and reinforcement.

    • Lap joints provide additional strength and stability to the column.

    • They help in distributing the load evenly across the column.

    • Lap joints prevent the column from cracking or failing under heavy loads.

    • Zone B is a critical area where the maximum bending moment occurs, and lap joints help in reinforcing this zone.

    • By using lap in the...

  • Answered by AI
  • Q2. Where are construction joint is provide in simply supported slab?
  • Ans. 

    Construction joints are provided at mid-span of simply supported slabs.

    • Construction joints are provided to allow for differential movement between adjacent sections of the slab.

    • They are typically located at mid-span of the slab, where the bending moment is zero.

    • The joint should be designed to transfer shear and moment between the two sections of the slab.

    • Proper reinforcement detailing is necessary to ensure the joint f...

  • Answered by AI
  • Q3. L/6 or L/ 3 where L is sapan of slab
  • Ans. 

    L/6 or L/3 is the ratio used to determine the maximum allowable deflection of a slab.

    • L/6 is used for residential buildings while L/3 is used for commercial buildings.

    • The ratio determines the maximum amount of deflection that a slab can have without causing damage or discomfort to occupants.

    • For example, if the span of a slab is 12 feet, the maximum allowable deflection for a residential building would be 2 inches (12/6)...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If you are doing your job with practical experience then no worries about any interview

I applied via Referral and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mostly technical related to the job position and expectancy of the organisation.

Interview Preparation Tips

Interview preparation tips for other job seekers - Value proposition to the organisation should be taken care of.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. General Introduction
  • Q2. Questions related to previous experience
  • Q3. MS Project questions
  • Q4. Contract Management
  • Q5. Earned value management
  • Q6. Concrete technology, IS codes, mix design,productivity analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions from basics to detailed were asked
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Value addition to Company
Round 3 - Technical 

(3 Questions)

  • Q1. Repair & Maintenance of Heavy Earth Moving Equipments related
  • Q2. Basic Hydraulic System functioning of Equipments, Explanation
  • Ans. 

    Hydraulic systems use fluids to transmit power and control movement in equipment.

    • Hydraulic systems use a pump to pressurize fluid, which is then distributed through hoses and valves to actuators that move the equipment.

    • The fluid is typically oil or water-based and is stored in a reservoir.

    • Hydraulic systems are commonly used in heavy equipment such as excavators, cranes, and bulldozers.

    • They are also used in aircraft lan...

  • Answered by AI
  • Q3. Trouble Shooting along with fault detection at site and site Report preparation afterwards
  • Ans. 

    I have extensive experience in trouble shooting and fault detection at site, and preparing site reports afterwards.

    • I have a strong understanding of the equipment and systems being used on site

    • I am able to quickly identify and diagnose issues, and develop effective solutions

    • I am skilled in preparing detailed site reports that accurately document the issue and the steps taken to resolve it

    • I am able to communicate effecti...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare basic questions for interviews whether Technical or General along with presentation. Be confident and presentable, while answering.
Round 1 - Technical 

(3 Questions)

  • Q1. About construction and technical aspects.
  • Q2. About Family, previous company job profiles
  • Q3. Joining time, salary, family
Round 2 - HR 

(2 Questions)

  • Q1. Job and working atmosphere, Team handling etc
  • Q2. Salary part, family relocation etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Attend positively and honestly and you will be abld to clear

G R Infraprojects Interview FAQs

How many rounds are there in G R Infraprojects Senior Project Manager interview?
G R Infraprojects interview process usually has 1 rounds. The most common rounds in the G R Infraprojects interview process are Technical.
How to prepare for G R Infraprojects Senior Project Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at G R Infraprojects. The most common topics and skills that interviewers at G R Infraprojects expect are Contract Management, Resource Planning, Site Management, Construction Management and Manpower Management.
What are the top questions asked in G R Infraprojects Senior Project Manager interview?

Some of the top questions asked at the G R Infraprojects Senior Project Manager interview -

  1. DESIGIN PROCEDURE :- DLC thickness 150mm. 1:- use M15 grade concrete,max aggreg...read more
  2. Design procedure :- 1 :- The minimum cement content 360 kg per cum.if the fly ...read more
  3. Two types of pavent 1:- Flexible pavement 2:-rigid pavement Types of progect 1:...read more

Tell us how to improve this page.

G R Infraprojects Senior Project Manager Salary
based on 8 salaries
₹20 L/yr - ₹70 L/yr
70% more than the average Senior Project Manager Salary in India
View more details

G R Infraprojects Senior Project Manager Reviews and Ratings

based on 2 reviews

4.7/5

Rating in categories

4.7

Skill development

4.5

Work-life balance

4.7

Salary

4.7

Job security

4.7

Company culture

4.7

Promotions

4.7

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
291 salaries
unlock blur

₹4.4 L/yr - ₹11.5 L/yr

Senior Engineer
228 salaries
unlock blur

₹3.6 L/yr - ₹8.6 L/yr

Engineer
136 salaries
unlock blur

₹2 L/yr - ₹6.5 L/yr

Deputy Manager
126 salaries
unlock blur

₹6.6 L/yr - ₹17.5 L/yr

Structural Engineer
123 salaries
unlock blur

₹2 L/yr - ₹6.3 L/yr

Explore more salaries
Compare G R Infraprojects with

Nagarjuna Construction Company

4.1
Compare

PNC Infratech

3.9
Compare

Ashoka Buildcon

4.1
Compare

IRB Infrastructure

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview