Flexible pavement and rigid pavement are two types of pavements used in different types of road projects.
Flexible pavement is made of multiple layers of materials that can flex under traffic loads.
Rigid pavement is made of a single layer of concrete or asphalt that is rigid and does not flex.
New projects involve constructing roads from scratch, while realignment projects involve changing the alignment of existing roads...
The question describes the application of prime coat and tack coat on a WMM surface.
Prime coat is a low viscous cut back bitumen used to fill up pores and voids on a WMM surface.
Tack coat is a light application of bitumen, asphalt, emulsion, or dilute water applied on the prime coat.
The purpose of the prime coat is to bond the WMM surface with the subsequent layers of asphalt.
The tack coat helps in providing a strong b...
Design procedure for 150mm DLC thickness using M15 grade concrete with specific requirements for cement content, testing, mixing, transportation, compaction, and curing.
Use M15 grade concrete with maximum aggregate cement ratio of 12:1
Minimum cement content of 150kg per cum, or 120kg per cum if flyash is more than 20%
Perform 5 sample cube test after 7 day curing with strength of 10 MPA, and 1 sample cube test after 7 d...
Design procedure for Senior Project Manager role including cement content, strength, joint design, and surface finishing.
Minimum cement content of 360 kg per cum, or 310 kg per cum if fly ash is more than 20%
Flexure strength of cement concrete after 28 days curing is 4.5 MPA
Compressive strength of cement concrete after 28 days curing is 40 MPA
Dowel bar provided for expansion joint vehicle load transfer between slabs
Tie...
posted on 23 Feb 2024
I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.
To improve profitability, focus on cost reduction, increasing revenue, and optimizing processes.
Identify and eliminate unnecessary expenses
Increase sales through marketing strategies or expanding product offerings
Streamline operations to reduce waste and improve efficiency
posted on 13 Feb 2023
I applied via Company Website and was interviewed before Feb 2022. There were 2 interview rounds.
Lap is used in the center of a column or Zone B for structural stability and reinforcement.
Lap joints provide additional strength and stability to the column.
They help in distributing the load evenly across the column.
Lap joints prevent the column from cracking or failing under heavy loads.
Zone B is a critical area where the maximum bending moment occurs, and lap joints help in reinforcing this zone.
By using lap in the...
Construction joints are provided at mid-span of simply supported slabs.
Construction joints are provided to allow for differential movement between adjacent sections of the slab.
They are typically located at mid-span of the slab, where the bending moment is zero.
The joint should be designed to transfer shear and moment between the two sections of the slab.
Proper reinforcement detailing is necessary to ensure the joint f...
L/6 or L/3 is the ratio used to determine the maximum allowable deflection of a slab.
L/6 is used for residential buildings while L/3 is used for commercial buildings.
The ratio determines the maximum amount of deflection that a slab can have without causing damage or discomfort to occupants.
For example, if the span of a slab is 12 feet, the maximum allowable deflection for a residential building would be 2 inches (12/6)...
posted on 6 Jul 2024
To mitigate the cost impact of project delays, focus on improving efficiency, reducing waste, and optimizing resources.
Identify the root causes of the delays and address them promptly.
Implement project management tools and techniques to streamline processes and improve productivity.
Optimize resource allocation to ensure maximum utilization and minimize idle time.
Negotiate with suppliers and vendors for better pricing o...
The carpet area is the area within the walls of the apartment that can be carpeted, while the built-up area includes the carpet area plus the thickness of the walls.
Carpet area is the actual area where you can lay a carpet.
Built-up area includes the carpet area plus the thickness of the walls.
Carpet area is usually around 70-80% of the built-up area.
For example, if the built-up area is 1000 square feet, the carpet area
posted on 12 Aug 2024
I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.
posted on 17 Feb 2020
I applied via Company Website and was interviewed before Feb 2019. There were 2 interview rounds.
posted on 11 Jun 2023
Already talked to you
based on 12 reviews
Rating in categories
Assistant Manager
648
salaries
| ₹5.2 L/yr - ₹18.5 L/yr |
Senior Engineer
424
salaries
| ₹4.3 L/yr - ₹13 L/yr |
Civil Engineer
225
salaries
| ₹1 L/yr - ₹9.5 L/yr |
Project Engineer
215
salaries
| ₹3 L/yr - ₹11 L/yr |
Safety Officer
205
salaries
| ₹2 L/yr - ₹7.8 L/yr |
Larsen & Toubro Limited
Tata Projects
Sterlite Power
Kalpataru Projects International