I applied via Naukri.com and was interviewed in Apr 2022. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Nov 2021. There were 3 interview rounds.
A planner focuses on creating a plan or strategy, while a scheduler focuses on creating a timeline or schedule for executing the plan.
A planner is responsible for developing a comprehensive plan that outlines the goals, objectives, tasks, and resources required for a project.
A scheduler takes the plan created by the planner and breaks it down into specific tasks, assigns resources, and creates a timeline or schedule fo...
The critical path is the longest sequence of dependent tasks that determines the project's overall duration.
It identifies the tasks that must be completed on time to prevent delays in the project.
It helps in scheduling and resource allocation.
Tasks on the critical path have zero slack or float.
Any delay in a task on the critical path will delay the project's completion.
It is determined by analyzing the dependencies and...
Total float is the amount of time a task can be delayed without affecting the project end date, while free float is the amount of time a task can be delayed without affecting the early start date of its successor task.
Total float is calculated by subtracting the early start date of a task from its late start date.
Free float is calculated by subtracting the early start date of a task from the early start date of its suc...
I applied via Monster and was interviewed before Apr 2023. There were 2 interview rounds.
Experience details gathered from last projects was shared.
Tata Projects interview questions for designations
I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.
Online meeting conducted with me.About 4 to 5 people along with HR had a discussion with me.Asked questions regarding my work exposure and technical questions.
I applied via Recruitment Consultant and was interviewed before Mar 2020. There were 4 interview rounds.
Top trending discussions
posted on 12 Oct 2020
I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.
posted on 18 Jan 2020
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Maintain elevation of underground piping by using level instruments and proper installation techniques.
Use a level instrument to check the elevation of the piping during installation.
Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.
Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.
Consider using supports o...
In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.
Managed a team of employees and delegated tasks effectively
Handled customer complaints and resolved issues in a timely manner
Created and implemented strategies to improve efficiency and productivity
Collaborated with other departments to achieve company goals
Conducted performanc
Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.
Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.
Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.
Cast iron electrodes have a high nickel content to prevent cracking.
Aluminum electrodes have a special coating ...
posted on 11 May 2018
I was interviewed before Mar 2020.
based on 5 interviews
1 Interview rounds
based on 51 reviews
Rating in categories
Deputy Manager
1.2k
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
716
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
406
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
390
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
365
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Reliance Infrastructure
GMR Group
Hindustan Construction Company