I was interviewed in Aug 2022.
Bituminous laying temperature is 130-150°C and rolling temperature is 80-100°C.
Bituminous laying requires higher temperature than rolling.
Temperature range ensures proper compaction and adhesion.
Temperature can vary based on the type of bitumen and aggregate used.
Proper temperature control is crucial for quality bituminous pavement.
Material suitability criteria for aggregate in construction projects.
Aggregate size should be 26.5 mm or less.
Water absorption should not exceed 2%.
Soundness test should show Naso4 not more than 12% and Mgso4 not more than 18%.
Angle of abrasion should be less than 35% with max FI & EI less than 35%.
Equivalent weight of sand should not be less than 50%.
Aggregate should not be alkaline reactive.
MDD & MCC should be as per
The design procedure for DLC mix includes using M15 grade concrete, minimum cement content of 150 kg/cum, and achieving a compressive strength of at least 10 MPA after 7 days of curing.
Use M15 grade concrete with aggregate and cement ratio of 12:1
Minimum cement content of 150 kg/cum, or 120 kg/cum if fly ash content is over 20%
Achieve a compressive strength of at least 10 MPA after 7 days of curing
DLC mix should be hom...
The question is about the suitability of aggregate size and water absorption for PQC with a total thickness of 300mm and tolerance of +/-6mm.
Aggregate size of 31.5mm is suitable for PQC with a total thickness of 300mm and tolerance of +/-6mm.
Water absorption to GSB DLC being the same for PQC is also suitable.
The suitability of the material is important for the successful completion of the project.
The design procedure for cement concrete includes minimum cement content, strength requirements, dowel bar and tie bar specifications, and surface preparation and curing techniques.
Minimum cement content of 360 kg/cum if fly ash is more than 20%, and 310 kg/cum otherwise
Flexural strength of cement concrete after 28-day curing should be 4.5 MPa, and compressive strength should be 40 MPa
Dowel bar size of 32mm dia and 300...
Top trending discussions
posted on 13 Feb 2023
I applied via Company Website and was interviewed before Feb 2022. There were 2 interview rounds.
Lap is used in the center of a column or Zone B for structural stability and reinforcement.
Lap joints provide additional strength and stability to the column.
They help in distributing the load evenly across the column.
Lap joints prevent the column from cracking or failing under heavy loads.
Zone B is a critical area where the maximum bending moment occurs, and lap joints help in reinforcing this zone.
By using lap in the...
Construction joints are provided at mid-span of simply supported slabs.
Construction joints are provided to allow for differential movement between adjacent sections of the slab.
They are typically located at mid-span of the slab, where the bending moment is zero.
The joint should be designed to transfer shear and moment between the two sections of the slab.
Proper reinforcement detailing is necessary to ensure the joint f...
L/6 or L/3 is the ratio used to determine the maximum allowable deflection of a slab.
L/6 is used for residential buildings while L/3 is used for commercial buildings.
The ratio determines the maximum amount of deflection that a slab can have without causing damage or discomfort to occupants.
For example, if the span of a slab is 12 feet, the maximum allowable deflection for a residential building would be 2 inches (12/6)...
posted on 1 Mar 2023
posted on 14 Sep 2023
I applied via Recruitment Consulltant
Project Management , Production Management and HSE
Deeply interested in RR PACKAGE
Well. We used to do everyday
posted on 9 Feb 2022
I applied via Naukri.com and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 16 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Experienced project manager with a proven track record of successfully leading and delivering projects on time and within budget.
Managed cross-functional teams to achieve project goals
Developed and implemented project plans, schedules, and budgets
Communicated effectively with stakeholders to ensure project alignment
Utilized project management tools such as Gantt charts and Kanban boards
Led the successful implementation...
posted on 22 Jun 2023
I applied via Newspaper Ad and was interviewed in Sep 2023. There were 3 interview rounds.
Technically asking questions and discussion
posted on 10 Mar 2024
I applied via Walk-in and was interviewed before Mar 2023. There were 2 interview rounds.
EPC process stands for Engineering, Procurement, and Construction process in project management.
EPC process involves the design, procurement, and construction phases of a project.
It is commonly used in industries such as energy, infrastructure, and manufacturing.
The process ensures that the project is completed on time, within budget, and meets quality standards.
EPC contractors are responsible for executing the entire
My expected CTC is negotiable based on the responsibilities and benefits offered by the company.
My expected CTC is based on industry standards and my level of experience.
I am open to discussing the salary range during the interview process.
I am looking for a competitive salary package with additional benefits such as health insurance and retirement plans.
Yes, I agree for background verification.
I understand the importance of background verification in ensuring the credibility and trustworthiness of employees.
I have nothing to hide and am confident in my professional history and qualifications.
I am willing to provide any necessary documentation or information for the verification process.
posted on 8 Dec 2022
I applied via Company Website and was interviewed before Dec 2021. There were 2 interview rounds.
Some of the top questions asked at the Patel Infrastructure Senior Project Manager interview -
based on 1 review
Rating in categories
Assistant Engineer
79
salaries
| ₹0 L/yr - ₹0 L/yr |
Store Executive
62
salaries
| ₹0 L/yr - ₹0 L/yr |
Structural Engineer
52
salaries
| ₹0 L/yr - ₹0 L/yr |
Highway Engineer
44
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
GMR Group
Reliance Infrastructure
IRB Infrastructure