Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Patel Infrastructure Team. If you also belong to the team, you can get access from here

Patel Infrastructure Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

Patel Infrastructure Civil Engineer-Highway/Roadway Interview Questions and Answers

Updated 17 Jan 2021

Patel Infrastructure Civil Engineer-Highway/Roadway Interview Experiences

1 interview found

Interview Questionnaire 

2 Questions

  • Q1. Why haunch provide in culverts??
  • Ans. 

    Haunches are provided in culverts to distribute the load from the superstructure to the foundation.

    • Haunches help in reducing the stress concentration at the corners of the culvert.

    • They provide additional support to the culvert walls and prevent cracking or failure.

    • Haunches improve the structural integrity of the culvert and increase its load-carrying capacity.

    • They help in maintaining the shape and alignment of the culv...

  • Answered by AI
  • Q2. Types of staging??
  • Ans. 

    Staging refers to the process of dividing a construction project into smaller parts or stages.

    • Staging helps in better project management and reduces the risk of delays and cost overruns.

    • Types of staging include linear staging, concurrent staging, and phased staging.

    • Linear staging involves completing one section of the project before moving on to the next.

    • Concurrent staging involves working on multiple sections of the p...

  • Answered by AI

Skills evaluated in this interview

Interview questions from similar companies

I applied via Company Website and was interviewed before Feb 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. In cv mentioned whole work related questions asked and frankly discussed to my role of work
  • Q2. Job regarding Interview was best and all documents submitted but not give me the answer of yes or no?

Interview Preparation Tips

Interview preparation tips for other job seekers - Free mind and frankly give the interview, no restication of language,you know hindi easily face the interview

Interview Questionnaire 

1 Question

  • Q1. Related to Building construction

Interview Preparation Tips

Interview preparation tips for other job seekers - It's good interviews for me

Interview Questionnaire 

4 Questions

  • Q1. Concrete testing and aggregate testing
  • Q2. Site concrete tests
  • Q3. 1- Compresive strength
  • Q4. 2- slump test

I applied via Company Website

Interview Questionnaire 

1 Question

  • Q1. Do you have knowledge related IS 456, IS 516?
  • Ans. 

    Yes, I have knowledge related to IS 456 and IS 516.

    • IS 456 is the code of practice for plain and reinforced concrete in construction.

    • IS 516 is the method of tests for strength of concrete.

    • I am familiar with the requirements and specifications outlined in both IS 456 and IS 516.

    • I have applied these standards in my previous projects, ensuring the quality and durability of the structures.

  • Answered by AI

I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. Basic knowledge about civil engineering.Interviw about based on previous experience.

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview process is very good,please before going to the interview once check all the previous work details,and practical knowledge.

I applied via Naukri.com and was interviewed before Jun 2019. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. BBS, schedule plans, QS

Interview Preparation Tips

Interview preparation tips for other job seekers - Simplex are not goodpay masters for their employees. Wosrt management and salary delayed for more than two to three months also.. no dignified behavior especially the Project Manager name Nehru & AGM syed asim were the racists & literally treat engineers like dogs. No proper work culture & internal conflicts.. such an worst management & no future for aspirants.
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. How to calculate carpet area of a building
  • Ans. 

    Carpet area of a building can be calculated by measuring the inner dimensions of the building excluding the walls.

    • Measure the length and width of each room in the building

    • Exclude the thickness of walls from the measurements

    • Calculate the area of each room by multiplying length and width

    • Sum up the areas of all rooms to get the total carpet area of the building

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2020. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Self introduction
  • Q2. Technical question

Interview Preparation Tips

Interview preparation tips for other job seekers - NCC is good company
Work cluter is very good
Management is good
I am happy with my job and organisation
Thanks
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(2 Questions)

  • Q1. HR asking about qualification and experience releted questions.
  • Q2. HR asking about documents
Round 3 - Technical 

(8 Questions)

  • Q1. How to calculate shuttering quantity.
  • Ans. 

    Shuttering quantity can be calculated by determining the surface area of the formwork and multiplying it by the depth of the concrete.

    • Measure the length and width of the formwork

    • Calculate the surface area by multiplying the length and width

    • Multiply the surface area by the depth of the concrete to get the shuttering quantity

    • Account for any additional formwork needed for corners or edges

  • Answered by AI
  • Q2. How to calculate steel quantity.
  • Ans. 

    Steel quantity can be calculated by using the formula: (D^2/162) x Length of steel

    • Determine the diameter of the steel

    • Calculate the length of the steel required

    • Use the formula (D^2/162) x Length of steel to calculate the steel quantity

    • Consider wastage and additional steel required for overlaps and joints

  • Answered by AI
  • Q3. What is the initial seting time
  • Ans. 

    Initial setting time is the time taken by cement to harden to a certain degree.

    • Initial setting time is the time taken by cement to harden to a certain degree.

    • It is the time elapsed between the moment water is added to the cement and the time when the paste starts losing its plasticity.

    • The initial setting time of cement is generally around 30 minutes to 1 hour.

    • It is an important property of cement as it determines the t...

  • Answered by AI
  • Q4. How to lap provide in column.
  • Ans. 

    Lapping provides a smooth surface finish to the column.

    • Clean the column thoroughly before lapping.

    • Apply a lapping compound to the column surface.

    • Use a lapping tool to rotate and move up and down the column.

    • Continue lapping until the desired surface finish is achieved.

    • Clean the column again after lapping to remove any residue.

  • Answered by AI
  • Q5. What is density of RCC.and pcc
  • Ans. 

    Density of RCC is around 2500 kg/m3 and PCC is around 2400 kg/m3.

    • RCC stands for Reinforced Cement Concrete and PCC stands for Plain Cement Concrete.

    • Density of RCC depends on the mix design and the type of aggregates used.

    • Density of PCC is lower than RCC due to absence of reinforcement.

    • Density of concrete is an important factor in determining its strength and durability.

  • Answered by AI
  • Q6. What is different b/w OPC and ppc
  • Ans. 

    OPC is Ordinary Portland Cement while PPC is Portland Pozzolana Cement.

    • OPC is made from raw materials like limestone and clay while PPC is made from a mixture of pozzolanic material and OPC.

    • PPC has higher durability and strength compared to OPC.

    • PPC is more eco-friendly as it uses industrial waste as a raw material.

    • OPC is commonly used for construction of buildings and bridges while PPC is used for marine structures, hy...

  • Answered by AI
  • Q7. What is density of sand , water and aggregate.
  • Ans. 

    The density of sand, water, and aggregate varies depending on their composition and temperature.

    • The density of sand ranges from 1300 to 1700 kg/m³.

    • The density of water is 1000 kg/m³ at 4°C.

    • The density of aggregate varies depending on its size and composition.

    • The density of fine aggregate ranges from 1600 to 1800 kg/m³.

    • The density of coarse aggregate ranges from 1200 to 1500 kg/m³.

  • Answered by AI
  • Q8. Why provide clear cover.
  • Ans. 

    Clear cover provides protection and visibility.

    • Clear cover protects the item from dust, dirt, and damage.

    • Clear cover allows the item to be visible without removing the cover.

    • Clear cover is commonly used for electronic devices, books, and documents.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - When give interview. So we have absulatelu free mind.question should be answered after listening well.
Contribute & help others!
anonymous
You can choose to be anonymous

Patel Infrastructure Interview FAQs

What are the top questions asked in Patel Infrastructure Civil Engineer-Highway/Roadway interview?

Some of the top questions asked at the Patel Infrastructure Civil Engineer-Highway/Roadway interview -

  1. Why haunch provide in culverts...read more
  2. Types of staging...read more

Recently Viewed

INTERVIEWS

Amara Raja Infra

No Interviews

INTERVIEWS

Gammon Engineers And Contractors

No Interviews

INTERVIEWS

Amara Raja Infra

No Interviews

INTERVIEWS

Amara Raja Infra

No Interviews

LIST OF COMPANIES

Discover companies

Find best workplace

INTERVIEWS

Gammon Engineers And Contractors

No Interviews

INTERVIEWS

Gammon Engineers And Contractors

No Interviews

INTERVIEWS

Amara Raja Infra

No Interviews

INTERVIEWS

Amara Raja Infra

No Interviews

INTERVIEWS

Amara Raja Infra

No Interviews

Tell us how to improve this page.

Interview Questions from Similar Companies

GMR Group Interview Questions
4.0
 • 80 Interviews
J&F Interview Questions
3.7
 • 30 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
View all

Patel Infrastructure Civil Engineer-Highway/Roadway Reviews and Ratings

based on 5 reviews

4.8/5

Rating in categories

4.8

Skill development

5.0

Work-life balance

4.1

Salary

4.6

Job security

5.0

Company culture

4.6

Promotions

4.6

Work satisfaction

Explore 5 Reviews and Ratings
Assistant Engineer
79 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Store Executive
62 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Structural Engineer
52 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Highway Engineer
44 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Safety Officer
43 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Patel Infrastructure with

Larsen & Toubro Limited

4.0
Compare

GMR Group

4.0
Compare

Reliance Infrastructure

4.1
Compare

IRB Infrastructure

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent