Patel Infrastructure Deputy Manager Interview Questions and Answers

Updated 12 Sep 2023

Patel Infrastructure Deputy Manager Interview Experiences

1 interview found

I applied via Approached by Company and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Planning for execution and laying of bituminous
  • Ans. 

    Planning for execution and laying of bituminous involves detailed scheduling, coordination, and quality control.

    • Develop a detailed project plan outlining tasks, timelines, and resources required

    • Coordinate with suppliers for timely delivery of materials

    • Ensure proper equipment and manpower are available for the execution

    • Implement quality control measures to ensure the final product meets specifications

    • Regularly monitor p...

  • Answered by AI
  • Q2. About bituminous laying

Interview Preparation Tips

Interview preparation tips for other job seekers - Production and asphalt laying

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Sep 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Gm 

(3 Questions)

  • Q1. What is your last project and its site design
  • Q2. What is the covered area of project
  • Ans. 

    The covered area of the project is approximately 10,000 square feet.

    • The covered area includes the indoor space of the project.

    • It does not include any outdoor space or open areas.

    • The exact covered area may vary depending on the project.

    • In this particular project, the covered area is approximately 10,000 square feet.

  • Answered by AI
  • Q3. What type of building

Interview Preparation Tips

Interview preparation tips for other job seekers - Believe in yourself and done your all duties responsibilities properly and report your senior.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Related to piping knowledge as per ASME Section
Round 2 - HR 

(1 Question)

  • Q1. Working culture and salary package
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. How can we receive Materials to store and what is the basic procedure
  • Ans. 

    Materials can be received through purchase orders, deliveries, or transfers. The basic procedure involves receiving, inspecting, documenting, and storing the materials.

    • Materials can be received through purchase orders placed with suppliers.

    • Deliveries can be made directly to the storage location or to a designated receiving area.

    • Materials can also be received through transfers from other departments or locations.

    • The bas...

  • Answered by AI
  • Q2. Procedure of client material receipt/BOQ Items
  • Ans. 

    Client material receipt/BOQ items procedure involves thorough inspection, documentation, and verification.

    • Upon receipt of client materials, conduct thorough inspection for damages or discrepancies.

    • Document all received items in a log or system for tracking purposes.

    • Verify received items against the Bill of Quantities (BOQ) to ensure accuracy.

    • Report any issues or discrepancies to the relevant stakeholders for resolution...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Related department work
  • Q2. Store related, record, manage, handle,
Round 3 - One-on-one 

(1 Question)

  • Q1. Related departments knowledge about store record manage handle

Interview Preparation Tips

Interview preparation tips for other job seekers - 100% assured job, one month noticed, leave available, job satisfaction
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Aptitude Test 

Logistics management Suppy Chain internet and CV.

Round 3 - Assignment 

Organization Amazon, Udaan and Dehaat skills assessment the same important working support.

Interview Preparation Tips

Interview preparation tips for other job seekers - Hi team,
Available CV ke datails logistics management skills development questions about them. Thanks
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before Jan 2024.

Round 1 - Technical 

(4 Questions)

  • Q1. Drainage and filter layers
  • Q2. Limit of pile settlement for vertiload testing
  • Ans. 

    The limit of pile settlement for vertiload testing is typically determined by the project specifications and design requirements.

    • The limit of pile settlement can vary depending on the type of structure being supported and the soil conditions

    • Common limits for pile settlement range from 10mm to 25mm

    • Settlement limits may also be specified in terms of a percentage of the pile diameter

    • Exceeding the allowable settlement limi...

  • Answered by AI
  • Q3. IRC code for flexible pavement
  • Ans. 

    IRC code for flexible pavement design

    • IRC: Indian Roads Congress

    • Flexible pavement design is covered in IRC:37-2012

    • IRC:37-2012 provides guidelines for design, construction, and maintenance of flexible pavements

  • Answered by AI
  • Q4. Limit of pile shifting
  • Ans. 

    Pile shifting limit refers to the maximum allowable movement of piles during construction.

    • Pile shifting limit is typically specified in the project specifications or design drawings.

    • Exceeding the pile shifting limit can lead to structural instability and potential failure.

    • Monitoring equipment such as inclinometers or settlement gauges may be used to track pile movement.

    • Adjustments to construction methods or pile design...

  • Answered by AI
Round 2 - Group Discussion 
Pro Tip by AmbitionBox:
Don’t treat group discussions as an argument. Group discussion is about reaching a meaningful conclusion.
View all GD tips
Round 3 - HR 

(2 Questions)

  • Q1. Salary negotiation
  • Q2. Other facilities

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare of technical , Specifications, Material management and planning of work

I applied via Naukri.com and was interviewed before Nov 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(3 Questions)

  • Q1. Tell me something about your self
  • Q2. Why you are leaving the company
  • Q3. Why you are joining our group
Round 3 - Technical 

(2 Questions)

  • Q1. Tell me something about Ind AS 116
  • Ans. 

    Ind AS 116 is a new accounting standard for lease accounting.

    • Ind AS 116 replaces the previous standard Ind AS 17.

    • It requires lessees to recognize all leases on their balance sheet.

    • Lessees must also separate lease components from non-lease components.

    • It impacts financial statements, ratios, and covenants.

    • It became effective from April 1, 2019.

    • Example: A company leasing a building must recognize the lease liability and r

  • Answered by AI
  • Q2. Ask about Ind AS 109

Interview Preparation Tips

Interview preparation tips for other job seekers - If you want to join, GMR is known for cultural and values.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Group Discussion 

Process of Goods receive, Material Issuence ,Inventory control ,Gate Pass of Job work Material

Interview Preparation Tips

Interview preparation tips for other job seekers - Work is worship, Experience is best Teacher of variable Industries
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Introducing, departments related advice, wastage, cost control, handling store and material

Round 2 - HR 

(2 Questions)

  • Q1. Expected sarlary
  • Q2. Noticed period, Negotiations
Contribute & help others!
anonymous
You can choose to be anonymous

Patel Infrastructure Interview FAQs

How many rounds are there in Patel Infrastructure Deputy Manager interview?
Patel Infrastructure interview process usually has 2 rounds. The most common rounds in the Patel Infrastructure interview process are Resume Shortlist and Technical.
How to prepare for Patel Infrastructure Deputy Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Patel Infrastructure. The most common topics and skills that interviewers at Patel Infrastructure expect are IOSH, Civil Construction, EHS, Fire Safety and First Aid.
What are the top questions asked in Patel Infrastructure Deputy Manager interview?

Some of the top questions asked at the Patel Infrastructure Deputy Manager interview -

  1. Planning for execution and laying of bitumin...read more
  2. About bituminous lay...read more

Recently Viewed

SALARIES

Gammon Engineers And Contractors

JOBS

Virtusa Consulting Services

No Jobs

LIST OF COMPANIES

Patel Infrastructure

Locations

INTERVIEWS

S&P Global

No Interviews

INTERVIEWS

Patel Infrastructure

No Interviews

INTERVIEWS

S&P Global

No Interviews

INTERVIEWS

S&P Global

No Interviews

INTERVIEWS

Medtronic

No Interviews

REVIEWS

Techno Electric & Engineering Company

No Reviews

INTERVIEWS

Patel Infrastructure

No Interviews

Tell us how to improve this page.

Patel Infrastructure Deputy Manager Interview Process

based on 2 interviews

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

GMR Group Interview Questions
4.0
 • 80 Interviews
J&F Interview Questions
3.8
 • 30 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
View all
Patel Infrastructure Deputy Manager Salary
based on 5 salaries
₹5.4 L/yr - ₹12.6 L/yr
At par with the average Deputy Manager Salary in India
View more details

Patel Infrastructure Deputy Manager Reviews and Ratings

based on 5 reviews

3.4/5

Rating in categories

1.4

Skill development

3.4

Work-life balance

2.8

Salary

1.9

Job security

1.4

Company culture

2.4

Promotions

2.4

Work satisfaction

Explore 5 Reviews and Ratings
Assistant Engineer
79 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Store Executive
62 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Structural Engineer
52 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Highway Engineer
44 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Safety Officer
43 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Patel Infrastructure with

Larsen & Toubro Limited

4.0
Compare

GMR Group

4.0
Compare

Reliance Infrastructure

4.1
Compare

IRB Infrastructure

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent