I applied via Approached by Company and was interviewed before Jul 2021. There were 2 interview rounds.
Planning for execution and laying of bituminous involves detailed scheduling, coordination, and quality control.
Develop a detailed project plan outlining tasks, timelines, and resources required
Coordinate with suppliers for timely delivery of materials
Ensure proper equipment and manpower are available for the execution
Implement quality control measures to ensure the final product meets specifications
Regularly monitor p...
Top trending discussions
I applied via Naukri.com and was interviewed before Sep 2021. There were 2 interview rounds.
The covered area of the project is approximately 10,000 square feet.
The covered area includes the indoor space of the project.
It does not include any outdoor space or open areas.
The exact covered area may vary depending on the project.
In this particular project, the covered area is approximately 10,000 square feet.
I applied via Referral and was interviewed before Feb 2023. There were 2 interview rounds.
posted on 21 Jul 2024
Materials can be received through purchase orders, deliveries, or transfers. The basic procedure involves receiving, inspecting, documenting, and storing the materials.
Materials can be received through purchase orders placed with suppliers.
Deliveries can be made directly to the storage location or to a designated receiving area.
Materials can also be received through transfers from other departments or locations.
The bas...
Client material receipt/BOQ items procedure involves thorough inspection, documentation, and verification.
Upon receipt of client materials, conduct thorough inspection for damages or discrepancies.
Document all received items in a log or system for tracking purposes.
Verify received items against the Bill of Quantities (BOQ) to ensure accuracy.
Report any issues or discrepancies to the relevant stakeholders for resolution...
Logistics management Suppy Chain internet and CV.
Organization Amazon, Udaan and Dehaat skills assessment the same important working support.
I was interviewed before Jan 2024.
The limit of pile settlement for vertiload testing is typically determined by the project specifications and design requirements.
The limit of pile settlement can vary depending on the type of structure being supported and the soil conditions
Common limits for pile settlement range from 10mm to 25mm
Settlement limits may also be specified in terms of a percentage of the pile diameter
Exceeding the allowable settlement limi...
IRC code for flexible pavement design
IRC: Indian Roads Congress
Flexible pavement design is covered in IRC:37-2012
IRC:37-2012 provides guidelines for design, construction, and maintenance of flexible pavements
Pile shifting limit refers to the maximum allowable movement of piles during construction.
Pile shifting limit is typically specified in the project specifications or design drawings.
Exceeding the pile shifting limit can lead to structural instability and potential failure.
Monitoring equipment such as inclinometers or settlement gauges may be used to track pile movement.
Adjustments to construction methods or pile design...
I applied via Naukri.com and was interviewed before Nov 2021. There were 3 interview rounds.
Ind AS 116 is a new accounting standard for lease accounting.
Ind AS 116 replaces the previous standard Ind AS 17.
It requires lessees to recognize all leases on their balance sheet.
Lessees must also separate lease components from non-lease components.
It impacts financial statements, ratios, and covenants.
It became effective from April 1, 2019.
Example: A company leasing a building must recognize the lease liability and r
posted on 5 Jan 2025
I applied via Recruitment Consulltant and was interviewed in Dec 2024. There was 1 interview round.
Process of Goods receive, Material Issuence ,Inventory control ,Gate Pass of Job work Material
posted on 26 Jan 2024
Introducing, departments related advice, wastage, cost control, handling store and material
based on 2 interviews
Interview experience
based on 5 reviews
Rating in categories
Assistant Engineer
79
salaries
| ₹0 L/yr - ₹0 L/yr |
Store Executive
62
salaries
| ₹0 L/yr - ₹0 L/yr |
Structural Engineer
52
salaries
| ₹0 L/yr - ₹0 L/yr |
Highway Engineer
44
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
GMR Group
Reliance Infrastructure
IRB Infrastructure