Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Patel Infrastructure Team. If you also belong to the team, you can get access from here

Patel Infrastructure Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Patel Infrastructure Admin Executive Interview Questions and Answers

Updated 16 Sep 2024

Patel Infrastructure Admin Executive Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(3 Questions)

  • Q1. Joining & no NOC
  • Q2. Payroll office
  • Q3. Admin Rlelated office related

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. How to calculate carpet area of a building
  • Ans. 

    Carpet area of a building can be calculated by measuring the inner dimensions of the building excluding the walls.

    • Measure the length and width of each room in the building

    • Exclude the thickness of walls from the measurements

    • Calculate the area of each room by multiplying length and width

    • Sum up the areas of all rooms to get the total carpet area of the building

  • Answered by AI

I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Basic knowledge about civil engineering.Interviw about based on previous experience.

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview process is very good,please before going to the interview once check all the previous work details,and practical knowledge.

I applied via Naukri.com and was interviewed before Jun 2019. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. BBS, schedule plans, QS

Interview Preparation Tips

Interview preparation tips for other job seekers - Simplex are not goodpay masters for their employees. Wosrt management and salary delayed for more than two to three months also.. no dignified behavior especially the Project Manager name Nehru & AGM syed asim were the racists & literally treat engineers like dogs. No proper work culture & internal conflicts.. such an worst management & no future for aspirants.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. HR asking about qualification and experience releted questions.
  • Q2. HR asking about documents
Round 3 - Technical 

(8 Questions)

  • Q1. How to calculate shuttering quantity.
  • Ans. 

    Shuttering quantity can be calculated by determining the surface area of the formwork and multiplying it by the depth of the concrete.

    • Measure the length and width of the formwork

    • Calculate the surface area by multiplying the length and width

    • Multiply the surface area by the depth of the concrete to get the shuttering quantity

    • Account for any additional formwork needed for corners or edges

  • Answered by AI
  • Q2. How to calculate steel quantity.
  • Ans. 

    Steel quantity can be calculated by using the formula: (D^2/162) x Length of steel

    • Determine the diameter of the steel

    • Calculate the length of the steel required

    • Use the formula (D^2/162) x Length of steel to calculate the steel quantity

    • Consider wastage and additional steel required for overlaps and joints

  • Answered by AI
  • Q3. What is the initial seting time
  • Ans. 

    Initial setting time is the time taken by cement to harden to a certain degree.

    • Initial setting time is the time taken by cement to harden to a certain degree.

    • It is the time elapsed between the moment water is added to the cement and the time when the paste starts losing its plasticity.

    • The initial setting time of cement is generally around 30 minutes to 1 hour.

    • It is an important property of cement as it determines the t...

  • Answered by AI
  • Q4. How to lap provide in column.
  • Ans. 

    Lapping provides a smooth surface finish to the column.

    • Clean the column thoroughly before lapping.

    • Apply a lapping compound to the column surface.

    • Use a lapping tool to rotate and move up and down the column.

    • Continue lapping until the desired surface finish is achieved.

    • Clean the column again after lapping to remove any residue.

  • Answered by AI
  • Q5. What is density of RCC.and pcc
  • Ans. 

    Density of RCC is around 2500 kg/m3 and PCC is around 2400 kg/m3.

    • RCC stands for Reinforced Cement Concrete and PCC stands for Plain Cement Concrete.

    • Density of RCC depends on the mix design and the type of aggregates used.

    • Density of PCC is lower than RCC due to absence of reinforcement.

    • Density of concrete is an important factor in determining its strength and durability.

  • Answered by AI
  • Q6. What is different b/w OPC and ppc
  • Ans. 

    OPC is Ordinary Portland Cement while PPC is Portland Pozzolana Cement.

    • OPC is made from raw materials like limestone and clay while PPC is made from a mixture of pozzolanic material and OPC.

    • PPC has higher durability and strength compared to OPC.

    • PPC is more eco-friendly as it uses industrial waste as a raw material.

    • OPC is commonly used for construction of buildings and bridges while PPC is used for marine structures, hy...

  • Answered by AI
  • Q7. What is density of sand , water and aggregate.
  • Ans. 

    The density of sand, water, and aggregate varies depending on their composition and temperature.

    • The density of sand ranges from 1300 to 1700 kg/m³.

    • The density of water is 1000 kg/m³ at 4°C.

    • The density of aggregate varies depending on its size and composition.

    • The density of fine aggregate ranges from 1600 to 1800 kg/m³.

    • The density of coarse aggregate ranges from 1200 to 1500 kg/m³.

  • Answered by AI
  • Q8. Why provide clear cover.
  • Ans. 

    Clear cover provides protection and visibility.

    • Clear cover protects the item from dust, dirt, and damage.

    • Clear cover allows the item to be visible without removing the cover.

    • Clear cover is commonly used for electronic devices, books, and documents.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - When give interview. So we have absulatelu free mind.question should be answered after listening well.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About structure work.
  • Q2. Slab steel use, which dia
  • Ans. 

    Slab steel reinforcement typically uses 8mm to 16mm diameter bars.

    • Slab steel reinforcement typically uses bars ranging from 8mm to 16mm in diameter

    • The choice of diameter depends on the span, load, and design requirements of the slab

    • Thicker bars are used for heavier loads and longer spans, while thinner bars are used for lighter loads and shorter spans

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Are you comfortable for assam location?
  • Q2. Tinsukia assam location was comfortable for me.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2020. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Self introduction
  • Q2. Technical question

Interview Preparation Tips

Interview preparation tips for other job seekers - NCC is good company
Work cluter is very good
Management is good
I am happy with my job and organisation
Thanks
Round 1 - Technical 

(2 Questions)

  • Q1. Cost of 1cum concrete work
  • Ans. 

    The cost of 1cum concrete work depends on various factors such as the type of concrete, location, labor cost, etc.

    • The cost of 1cum concrete work varies depending on the type of concrete used, such as M20, M25, etc.

    • The location of the construction site also affects the cost of concrete work.

    • The cost of labor is another factor that affects the cost of concrete work.

    • Additional costs such as transportation, taxes, and perm...

  • Answered by AI
  • Q2. How to do you check window
  • Ans. 

    To check a window, inspect its frame, glass, and hardware for any damage or wear.

    • Check the frame for cracks or warping

    • Inspect the glass for chips, cracks, or fogging

    • Test the hardware to ensure it opens and closes smoothly

    • Check for any gaps or drafts around the window

    • Look for signs of water damage or mold

    • Consider the age and condition of the window

    • Consult a professional if unsure about any issues

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. How much salary growth is expecting

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well for technical because this round decides your package
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Basic knowledge of construction work and according to your experience what work had you done in previous company because they ask you according to your CV.
  • Q2. Estimation and costing
  • Q3. Bar bending schedule must be known
  • Q4. Structure analysis should have

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Assistant Engineer - Civil interview:
  • Structural Analysis
  • Quantity Estimation
  • Building Material
  • AutoCAD
Interview preparation tips for other job seekers - Bending moment.
Covering block.
Cement required for 1 sqm of plaster work.
Concrete work as per IS CODE.
IS Code should be known.
Development length.
Overlap length.
Weight of steel bar.
Volume of cement.
Etc.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Past work experience
  • Ans. 

    I have 3 years of experience working as a civil engineer for a construction company.

    • Managed multiple construction projects simultaneously

    • Performed site inspections and ensured compliance with building codes

    • Collaborated with architects and contractors to resolve design issues

  • Answered by AI
  • Q2. Salary expectations

Patel Infrastructure Interview FAQs

How many rounds are there in Patel Infrastructure Admin Executive interview?
Patel Infrastructure interview process usually has 1 rounds. The most common rounds in the Patel Infrastructure interview process are HR.
What are the top questions asked in Patel Infrastructure Admin Executive interview?

Some of the top questions asked at the Patel Infrastructure Admin Executive interview -

  1. Admin Rlelated office rela...read more
  2. Payroll off...read more
  3. Joining & no ...read more

Tell us how to improve this page.

Patel Infrastructure Admin Executive Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

GMR Group Interview Questions
4.1
 • 80 Interviews
J&F Interview Questions
3.8
 • 30 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
View all
Assistant Engineer
79 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Store Executive
62 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Structural Engineer
52 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Safety Officer
43 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Highway Engineer
43 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Patel Infrastructure with

Larsen & Toubro Limited

4.0
Compare

GMR Group

4.0
Compare

Reliance Infrastructure

4.1
Compare

IRB Infrastructure

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview