i
Patel Infrastructure
Filter interviews by
Clear (1)
I applied via Naukri.com and was interviewed before Mar 2023. There was 1 interview round.
Top trending discussions
I applied via Approached by Company and was interviewed in Dec 2022. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Jul 2022. There were 3 interview rounds.
I have a strong technical knowledge in piling, with experience in various piling techniques and equipment.
Extensive experience in designing and implementing piling solutions for construction projects
Proficient in using various piling equipment such as hydraulic hammers, augers, and vibratory drivers
Knowledgeable about different piling techniques including driven piles, bored piles, and micropiles
Familiar with relevant ...
posted on 6 Jun 2020
I applied via Naukri.com and was interviewed before Jun 2019. There were 3 interview rounds.
posted on 21 Feb 2022
I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 8 Apr 2024
I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.
Carpet area of a building can be calculated by measuring the inner dimensions of the building excluding the walls.
Measure the length and width of each room in the building
Exclude the thickness of walls from the measurements
Calculate the area of each room by multiplying length and width
Sum up the areas of all rooms to get the total carpet area of the building
posted on 3 Aug 2024
I have 3 years of experience working as a civil engineer for a construction company.
Managed multiple construction projects simultaneously
Performed site inspections and ensured compliance with building codes
Collaborated with architects and contractors to resolve design issues
posted on 9 Aug 2021
The density of cement varies depending on the type of cement used.
The density of ordinary Portland cement is around 1440 kg/m³.
The density of white cement is around 1300 kg/m³.
The density of rapid hardening cement is around 1250 kg/m³.
The density of low heat cement is around 1200 kg/m³.
The density of high alumina cement is around 1400 kg/m³.
posted on 30 Nov 2021
based on 1 interview
Interview experience
Assistant Engineer
79
salaries
| ₹0 L/yr - ₹0 L/yr |
Store Executive
62
salaries
| ₹0 L/yr - ₹0 L/yr |
Structural Engineer
52
salaries
| ₹0 L/yr - ₹0 L/yr |
Highway Engineer
44
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
GMR Group
Reliance Infrastructure
IRB Infrastructure