I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.
My salary is competitive and based on my experience, qualifications, and the current market rates for Civil Site Engineers.
My salary is determined by factors such as my level of experience in the field.
Qualifications and certifications also play a role in determining my salary.
Market rates for Civil Site Engineers in the specific location where I work also influence my salary.
I am open to discussing salary expectations
I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.
Rope size and core used in cranes are important factors for determining the lifting capacity and durability of the crane.
Rope size refers to the diameter of the rope used in the crane, which affects the weight capacity and strength of the crane.
The core of the rope can be either fiber core or steel core, with steel core providing more strength and durability.
The combination of rope size and core type determines the ove...
I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in May 2024. There was 1 interview round.
About Highway work as Subgrade, CTSB, CTB level checking
D.p. Jain & Co. Infrastructure Pvt . interview questions for popular designations
I was interviewed in Aug 2024.
I am responsible for testing software applications to ensure they meet quality standards and specifications.
Performing manual and automated testing on software applications
Identifying and documenting defects or issues found during testing
Collaborating with developers to resolve issues and improve software quality
Creating test plans and test cases based on project requirements
I applied via Approached by Company and was interviewed in Jun 2023. There were 4 interview rounds.
I applied via Company Website and was interviewed in Aug 2022. There were 3 interview rounds.
I have extensive experience in highway engineering, including project management and design.
Managed multiple highway construction projects, ensuring adherence to budget and timeline
Designed and implemented traffic control plans for major road construction projects
Conducted traffic impact studies to assess the effects of proposed developments on existing road networks
Collaborated with multidisciplinary teams to develop ...
I applied via LinkedIn and was interviewed in Aug 2022. There were 3 interview rounds.
Add water to increase the slump of concrete.
Add small amounts of water and mix thoroughly.
Check the slump again and repeat if necessary.
Avoid adding too much water as it can weaken the concrete.
If temperature of DBM or BC is not achieved at the time of laying, the material should be reheated.
Reheat the material to achieve the required temperature before laying
Ensure that the temperature is monitored and maintained during the laying process
Consult with the manufacturer or supplier for specific instructions on temperature requirements
Top trending discussions
The duration of D.p. Jain & Co. Infrastructure Pvt . interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 25 interviews
Interview experience
based on 301 reviews
Rating in categories
Assistant Manager
39
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
20
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive - Stores
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Highway Engineer
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
GMR Group
Reliance Infrastructure
Tata Projects