I applied via Approached by Company and was interviewed before Jul 2021. There were 2 interview rounds.
Planning for execution and laying of bituminous involves detailed scheduling, coordination, and quality control.
Develop a detailed project plan outlining tasks, timelines, and resources required
Coordinate with suppliers for timely delivery of materials
Ensure proper equipment and manpower are available for the execution
Implement quality control measures to ensure the final product meets specifications
Regularly monitor p...
I applied via Naukri.com and was interviewed in Nov 2024. There were 2 interview rounds.
I have over 10 years of experience in sales management, leading teams to exceed targets and drive revenue growth.
Managed a team of 15 sales representatives, consistently exceeding monthly sales targets by 20%
Implemented new sales strategies that resulted in a 30% increase in revenue within the first year
Developed strong relationships with key clients, leading to repeat business and referrals
Seeking new challenges and opportunities for growth.
Desire for career advancement
Looking for new challenges
Seeking better work-life balance
Company restructuring or downsizing
Relocation to a different area
I am currently drawing a salary of $70,000 per year.
My current salary is $70,000 per year
I am satisfied with my current salary
I am open to discussing salary expectations for this position
I expect to lead a high-performing sales team, drive revenue growth, and exceed targets.
Lead and motivate sales team to achieve targets
Develop and implement sales strategies to drive revenue growth
Monitor and analyze sales performance to make data-driven decisions
Build strong relationships with clients and partners
Stay updated on industry trends and competitor activities
posted on 29 Jan 2024
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There were 2 interview rounds.
I have experience with various types of foundations including shallow foundations, deep foundations, and pile foundations.
Shallow foundations: These are used when the soil is stable and can support the load of the structure. Examples include spread footings and mat foundations.
Deep foundations: These are used when the soil near the surface is not suitable for supporting the load. Examples include pile foundations and d...
posted on 27 Oct 2023
I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.
I am Loganathan Gangadharan I Finished diploma in civil engineering with 10 years experience in Construction Field. Building background to eat not come down
The lapping length for a 12 mm steel rod used in construction is typically 60 times the diameter of the rod.
Lapping length is usually 60 times the diameter of the steel rod
For a 12 mm steel rod, the lapping length would be 12 mm x 60 = 720 mm
Lapping is done to ensure continuity and strength in the reinforcement
In Oman, commonly used footings include spread footings, strip footings, and raft footings.
Spread footings are used for individual columns or walls and distribute the load over a larger area.
Strip footings are continuous footings that support a line of columns or walls.
Raft footings are used for large or irregularly shaped structures to distribute the load over a wider area.
In Oman, due to the sandy soil conditions, de...
To rectify a broken concrete floor, materials like concrete mix, epoxy resin, or self-leveling compound can be used.
Use concrete mix to fill in the broken areas and level the floor.
Apply epoxy resin to seal cracks and strengthen the floor.
Consider using self-leveling compound for a smooth and even surface.
Ensure proper preparation and cleaning of the floor before applying any material.
Consult with a structural engineer
Concrete setting times can vary depending on factors like temperature and mix design.
Concrete typically sets within 24-48 hours, but continues to harden over time.
Factors affecting setting time include temperature, humidity, and mix design.
For example, in hot weather, concrete may set faster, while in cold weather it may take longer.
Accelerators or retarders can be added to the mix to adjust setting times as needed.
Pile heads are removed to allow for further construction or to ensure proper load transfer to the foundation.
To prepare for further construction on top of the piles
To ensure proper load transfer to the foundation
To facilitate the installation of pile caps or beams
To adjust the pile length if necessary
There are four deductions of 90 degree angles.
A 90 degree angle is formed when two lines intersect at a right angle.
In a square, all four angles are 90 degrees.
In a rectangle, opposite angles are 90 degrees.
In a right triangle, one angle is always 90 degrees.
Static load test is used to measure the load capacity of a structure under a constant load, while dynamic load test is used to measure the response of a structure to varying loads.
Static load test involves applying a constant load to a structure and measuring its response over time.
Dynamic load test involves applying varying loads to a structure to simulate real-life conditions.
Static load test helps determine the maxi...
The number of tolerance of pile load test depends on the specific project requirements and standards.
The number of tolerance of pile load test can vary based on the project specifications and standards.
Typically, a tolerance of +/- 5% to +/- 10% is considered acceptable for pile load tests.
Some projects may have more stringent tolerance requirements depending on the criticality of the structure.
It is important to refer...
Bentonite has a range density of 17-22 lb/gal and is used in civil engineering for drilling fluid, grouting, and sealing purposes.
Range density of bentonite is typically between 17-22 lb/gal.
Bentonite is used in civil engineering for various purposes such as drilling fluid, grouting, and sealing.
The range density of bentonite is important for determining its effectiveness in different applications.
Higher range density ...
posted on 24 Mar 2021
posted on 29 Jun 2015
posted on 29 Jun 2015
posted on 9 Oct 2021
I applied via Campus Placement and was interviewed before Oct 2020. There was 1 interview round.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
39
salaries
| ₹3.8 L/yr - ₹8 L/yr |
Senior Engineer
30
salaries
| ₹4.2 L/yr - ₹7.2 L/yr |
Deputy Manager
20
salaries
| ₹5 L/yr - ₹8.6 L/yr |
Senior Executive - Stores
19
salaries
| ₹3.5 L/yr - ₹4.5 L/yr |
Highway Engineer
19
salaries
| ₹3.5 L/yr - ₹5.2 L/yr |
Patel Infrastructure
CTS Consulting & Technical Support
J K Fenner
Saudi Binladin Group