Upload Button Icon Add office photos

Filter interviews by

D.p. Jain & Co. Infrastructure Pvt . Site Engineer Interview Questions and Answers

Updated 23 Jul 2024

D.p. Jain & Co. Infrastructure Pvt . Site Engineer Interview Experiences

1 interview found

Site Engineer Interview Questions & Answers

user image KGKEPL CHITRADURGA

posted on 23 Jul 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Site experiance
  • Q2. Calculation site

Interview Preparation Tips

Interview preparation tips for other job seekers - please call hr

Interview questions from similar companies

I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Why are you looking for a change?
  • Q2. What are your salary expectations?
  • Q3. Why should we hire you?
Round 3 - One-on-one 

(1 Question)

  • Q1. What you know about core?
  • Ans. 

    Core is the central part of a structure or object that provides strength and stability.

    • Core is commonly used in construction and engineering.

    • It is the central part of a building or structure that provides support and stability.

    • In fitness, core refers to the muscles in the abdomen, back, and pelvis that support the spine.

    • Examples of core materials include concrete, steel, and wood.

    • A strong core is important for maintain

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident on what you know.

Skills evaluated in this interview

Interview Questionnaire 

1 Question

  • Q1. What is production?
  • Ans. 

    Production refers to the process of creating goods or services using resources and labor.

    • Production involves transforming raw materials into finished products or providing services to customers.

    • It includes activities such as manufacturing, assembly, packaging, and distribution.

    • Examples of production include car manufacturing, food processing, and software development.

    • Efficient production is essential for businesses to

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1.  Floor Tile thickness, types of tile, company of tile,

Interview Questionnaire 

1 Question

  • Q1. Site related

Interview Questionnaire 

1 Question

  • Q1. How many techniques you often use to do your work?

Interview Preparation Tips

Interview preparation tips for other job seekers - Dedicated time on work will helps you to gain pure knowledge, which is remember for life time and helps to gain confidence to do that work perfectly. This confidence reflect by your voice and face, which is recognised by interviewer.

I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. What a term of Rolling margin on a steel?
  • Ans. Rolling margin is a difference weight of steel actual weight and theoretical weight.
  • Answered by Arvind Devrani
  • Q2. Initial setting time of cement
  • Ans. 

    Initial setting time of cement is the time taken by cement to harden and attain a particular strength.

    • Initial setting time is determined by Vicat apparatus

    • It is the time taken for the cement to lose its plasticity and become hard

    • The standard initial setting time for ordinary Portland cement is 30 minutes

    • Factors affecting initial setting time include temperature, water-cement ratio, and type of cement

  • Answered by AI
  • Q3. Elongation % of steel fy 500
  • Ans. 

    The elongation % of steel fy 500 is approximately 12%.

    • Elongation % is the measure of ductility of a material.

    • It is the percentage increase in length of a material before it fractures under tension.

    • For steel fy 500, the elongation % is approximately 12%.

    • This means that the steel can stretch up to 12% of its original length before it breaks.

  • Answered by AI
  • Q4. How much bag of cement in 1 cubic meter
  • Ans. 

    The amount of cement required for 1 cubic meter varies depending on the concrete mix design.

    • The amount of cement needed for 1 cubic meter of concrete varies from 250kg to 600kg depending on the mix design.

    • The mix design specifies the ratio of cement to other materials like sand and aggregates.

    • For example, a mix design of 1:2:4 requires 400kg of cement per cubic meter of concrete.

    • It is important to accurately calculate ...

  • Answered by AI
  • Q5. How much density of material Steel Concrete Sand
  • Ans. 

    Density of materials: Steel - 7850 kg/m3, Concrete - 2400 kg/m3, Sand - 1600 kg/m3

    • Density of steel is higher than that of concrete and sand

    • Density of concrete varies depending on the mix design

    • Density of sand can vary depending on the source and moisture content

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Technically sound interview, like sagging hogging loads moment shear, all about steel, concrete and formwork such as qty calculation and fixing procedures.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. Tell me about ur self in brief
  • Q2. Qualifications and working experience related questions
  • Q3. Problem solving questions
  • Q4. Conditional questions
  • Q5. About concrete grade

Interview Preparation Tips

Topics to prepare for Hindustan Construction Company Site Engineer interview:
  • Works relate
  • Execution
  • Concrete
  • Bbs
  • Billing
Interview preparation tips for other job seekers - If u r experienced person then gain deep knowledge related to ur field and which are your previous working experience u have.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. What is the density of RCC structure
  • Ans. 

    The density of RCC structure typically ranges from 2200 to 2500 kg/m^3.

    • Density of RCC is influenced by the type and proportion of materials used.

    • Common density range for RCC is 2200 to 2500 kg/m^3.

    • Higher density indicates stronger and more durable RCC structure.

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Exam will be conduct for aptitude test

Round 3 - Technical 

(3 Questions)

  • Q1. Any asked questions my Bulding mteriyal i will attemt given answer your questions
  • Q2. Bulding material any questions
  • Q3. Can u any questions my releted tred

Interview Preparation Tips

Topics to prepare for GMR Group Site Engineer interview:
  • Bulding meterial
Interview preparation tips for other job seekers - A standardized test is a test that is administered and scored in a consistent, or "standard", manner

D.p. Jain & Co. Infrastructure Pvt . Interview FAQs

How many rounds are there in D.p. Jain & Co. Infrastructure Pvt . Site Engineer interview?
D.p. Jain & Co. Infrastructure Pvt . interview process usually has 1 rounds. The most common rounds in the D.p. Jain & Co. Infrastructure Pvt . interview process are HR.
What are the top questions asked in D.p. Jain & Co. Infrastructure Pvt . Site Engineer interview?

Some of the top questions asked at the D.p. Jain & Co. Infrastructure Pvt . Site Engineer interview -

  1. site experia...read more
  2. calculation s...read more

Tell us how to improve this page.

D.p. Jain & Co. Infrastructure Pvt . Site Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 424 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
J&F Interview Questions
3.8
 • 30 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
View all
D.p. Jain & Co. Infrastructure Pvt . Site Engineer Salary
based on 6 salaries
₹2.1 L/yr - ₹3.4 L/yr
28% less than the average Site Engineer Salary in India
View more details

D.p. Jain & Co. Infrastructure Pvt . Site Engineer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

4.0

Skill development

4.0

Work-life balance

3.0

Salary

5.0

Job security

3.0

Company culture

2.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
39 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
36 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
20 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Executive - Stores
19 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Highway Engineer
19 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare D.p. Jain & Co. Infrastructure Pvt . with

Larsen & Toubro Limited

4.0
Compare

GMR Group

4.0
Compare

Reliance Infrastructure

4.1
Compare

Tata Projects

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview