Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Patel Infrastructure Team. If you also belong to the team, you can get access from here

Patel Infrastructure Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Patel Infrastructure Interview Questions, Process, and Tips

Updated 26 Jan 2025

Top Patel Infrastructure Interview Questions and Answers

View all 23 questions

Patel Infrastructure Interview Experiences

Popular Designations

29 interviews found

IT Executive Interview Questions & Answers

user image Anonymous

posted on 30 Dec 2022

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - HR 

(2 Questions)

  • Q1. About Yourself ?
  • Q2. Why Resign current job?
  • Ans. 

    Seeking new challenges and opportunities for growth.

    • Looking for new challenges and opportunities to learn and grow.

    • Desire for career advancement and professional development.

    • Seeking a better work-life balance or company culture.

    • Relocation or personal reasons.

    • Company restructuring or changes in management.

  • Answered by AI
Round 3 - Technical 

(5 Questions)

  • Q1. What's your job responsibility at current site ?
  • Ans. 

    I am responsible for managing the IT infrastructure, overseeing network security, and leading a team of IT professionals.

    • Managing IT infrastructure

    • Overseeing network security

    • Leading a team of IT professionals

  • Answered by AI
  • Q2. Do you know Configure RF devices ?
  • Ans. 

    Yes, configuring RF devices involves setting up and optimizing radio frequency devices for optimal performance.

    • Configuring RF devices involves adjusting settings such as frequency, power levels, and modulation to ensure proper communication.

    • Examples of RF devices include routers, access points, and wireless adapters.

    • Proper configuration of RF devices is essential for reliable wireless communication and network performa

  • Answered by AI
  • Q3. What is the needed material for installation and Configure CCTV ?
  • Ans. 

    Materials needed for installing and configuring CCTV include cameras, cables, DVR/NVR, monitor, power supply, and tools.

    • Cameras (e.g. dome cameras, bullet cameras)

    • Cables (e.g. coaxial cables, Ethernet cables)

    • DVR/NVR (Digital Video Recorder/Network Video Recorder)

    • Monitor (for viewing footage)

    • Power supply (for cameras and DVR/NVR)

    • Tools (e.g. drill, screwdriver)

  • Answered by AI
  • Q4. Do you have knowledge about firewall devices ?
  • Ans. 

    Yes, I have knowledge about firewall devices.

    • Firewall devices are used to monitor and control incoming and outgoing network traffic based on predetermined security rules.

    • They can be hardware-based or software-based.

    • Examples of firewall devices include Cisco ASA, Palo Alto Networks, and Fortinet.

    • Firewalls can be configured to block certain types of traffic, such as specific websites or protocols.

    • They are essential for n...

  • Answered by AI
  • Q5. How many types of switches uses in networking for LAN network and CCTV network ?
  • Ans. 

    There are two main types of switches used in networking for LAN network and CCTV network: managed switches and unmanaged switches.

    • Managed switches offer more control and features, such as VLAN support and Quality of Service (QoS) settings.

    • Unmanaged switches are simpler and easier to set up, but offer less customization and control.

    • Examples of managed switches include Cisco Catalyst series and HP ProCurve series.

    • Example...

  • Answered by AI
Round 4 - HR 

(2 Questions)

  • Q1. About Your current CTC?
  • Q2. Expected CTC

IT Executive Interview Questions asked at other Companies

Q1. How you can identify if a system get an issue with Hardware.
View answer (3)
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Plz brief himself
Round 2 - Technical 

(2 Questions)

  • Q1. Which type of foundation you done?
  • Ans. 

    I have experience with various types of foundations including shallow foundations, deep foundations, and pile foundations.

    • Shallow foundations: These are used when the soil is stable and can support the load of the structure. Examples include spread footings and mat foundations.

    • Deep foundations: These are used when the soil near the surface is not suitable for supporting the load. Examples include pile foundations and d...

  • Answered by AI
  • Q2. Open foundation or pile foundation

Interview Preparation Tips

Topics to prepare for Patel Infrastructure Civil Site Engineer interview:
  • Foundation
  • Girder
  • Piling
  • Mnb
  • Mjb
  • culverts
  • Flyovers
  • Casting yard
  • Reinforcement
  • Site Execution

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (65)
Patel Infrastructure Interview Questions and Answers for Freshers
illustration image
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(3 Questions)

  • Q1. Joining & no NOC
  • Q2. Payroll office
  • Q3. Admin Rlelated office related

Admin Executive Interview Questions asked at other Companies

Q1. Are you nearest to the Xpressbees? If yes, you are selected.
View answer (2)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Current working details and salary disscus
Round 2 - Technical 

(1 Question)

  • Q1. Knowledge test, what is work in current company, what is experience in this field and etc...

Document Controller Interview Questions asked at other Companies

Q1. How many Engineering Documents will be process if you handle EPC project?
View answer (4)

Patel Infrastructure interview questions for popular designations

 Assistant Engineer - Civil

 (2)

 Junior Executive

 (2)

 IT Executive

 (2)

 Structural Engineer

 (1)

 Graduate Engineer

 (1)

 Asst Store

 (1)

 HR Manager

 (1)

 Senior Executive

 (1)

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Nov 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the temparature need in BC laying
  • Ans. 

    The temperature needed for BC laying is typically around 70-75 degrees Fahrenheit.

    • The ideal temperature for BC laying is between 70-75 degrees Fahrenheit

    • Maintaining a consistent temperature is important for successful BC laying

    • Extreme temperatures can negatively impact the BC laying process

  • Answered by AI
  • Q2. What is the P&M Quality objectives Give one Example
  • Ans. 

    P&M Quality objectives focus on improving product and manufacturing quality standards.

    • Implementing quality control measures to ensure products meet specifications

    • Continuous monitoring and analysis of production processes for quality improvement

    • Training employees on quality standards and best practices

    • Setting specific quality targets to achieve measurable improvements

    • Regularly reviewing and updating quality objectives b...

  • Answered by AI

Deputy General Manager Interview Questions asked at other Companies

Q1. Share list of controls which are required to safe guard the organizations from perimeter to end points.
View answer (2)

Get interview-ready with Top Patel Infrastructure Interview Questions

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Explain yourself
  • Ans. 

    Experienced finance professional with strong leadership skills and a track record of driving results.

    • Over 10 years of experience in finance and accounting roles

    • Managed a team of 15 accountants and successfully implemented cost-saving measures

    • Led the financial planning and analysis process resulting in a 10% increase in profitability

    • Strong analytical skills and attention to detail

    • Excellent communication and interpersona

  • Answered by AI
  • Q2. How do you rate urself
  • Ans. 

    I rate myself highly based on my extensive experience, strong leadership skills, and proven track record of achieving results.

    • Extensive experience in managing accounts and financial operations

    • Strong leadership skills in leading teams and driving performance

    • Proven track record of achieving financial targets and improving processes

    • Excellent communication and interpersonal skills

    • Ability to analyze data and make strategic ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don’t join see other options

Sr.Manager Accounts Interview Questions asked at other Companies

Q1. Only working processes. How to manage?
View answer (1)

Manager QS Interview Questions & Answers

user image Suresh Medapi

posted on 7 May 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Nov 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. So many questions can not be decried in details

Interview Preparation Tips

Interview preparation tips for other job seekers - As Quantity Surveyor should know how to calculate the quantities in the Contract B.O.Q and necessarily of new items and Rates should identified and Notice to the Engineer for approval.

Manager QS Interview Questions asked at other Companies

Q1. How to calculate the Quantity of a I girder as per drawing provided?
View answer (1)

HSE Engineer Interview Questions & Answers

user image Anonymous

posted on 11 Dec 2023

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Nov 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all Resume tips
Round 2 - Group Discussion 

Safety manegement rule ,PPE types 5,safety helmet,safety gogale,safetyshoge,safety full awareness and safety shuit

Round 3 - Assignment 

Risk assessment,JSA,audit, identify hazard

Interview Preparation Tips

Topics to prepare for Patel Infrastructure HSE Engineer interview:
  • Calient
  • Anithink
  • Safety rule
Interview preparation tips for other job seekers - Manegement deblop

HSE Engineer Interview Questions asked at other Companies

Q1. What safety measures might be followed during the lifting operation in the working premises?
View answer (2)

I applied via Approached by Company and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Planning for execution and laying of bituminous
  • Ans. 

    Planning for execution and laying of bituminous involves detailed scheduling, coordination, and quality control.

    • Develop a detailed project plan outlining tasks, timelines, and resources required

    • Coordinate with suppliers for timely delivery of materials

    • Ensure proper equipment and manpower are available for the execution

    • Implement quality control measures to ensure the final product meets specifications

    • Regularly monitor p...

  • Answered by AI
  • Q2. About bituminous laying

Interview Preparation Tips

Interview preparation tips for other job seekers - Production and asphalt laying

Deputy Manager Interview Questions asked at other Companies

Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with us and which products...3.what is main business in your area and its functions...4 Previous comoany achevements 5.Your strengts and weakness.
View answer (69)

DGM Interview Questions & Answers

user image Anonymous

posted on 15 Feb 2023

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jan 2023. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all Resume tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Interested for change to other organisations
Round 3 - Technical 

(1 Question)

  • Q1. Past works experiences and locations
Round 4 - Group Discussion 

Ability to adopt new cultures for the

Round 5 - HR 

(1 Question)

  • Q1. Salary present & expected….

Interview Preparation Tips

Interview preparation tips for other job seekers - Be steady & firm on the fore views before appearing for

DGM Interview Questions asked at other Companies

Q1. How on can take care of Real world usage during product development?
View answer (1)
Contribute & help others!
anonymous
You can choose to be anonymous

Patel Infrastructure Interview FAQs

How many rounds are there in Patel Infrastructure interview?
Patel Infrastructure interview process usually has 2-3 rounds. The most common rounds in the Patel Infrastructure interview process are HR, Technical and Resume Shortlist.
How to prepare for Patel Infrastructure interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Patel Infrastructure. The most common topics and skills that interviewers at Patel Infrastructure expect are SAP, Project Management, Accounting, Billing and Finance.
What are the top questions asked in Patel Infrastructure interview?

Some of the top questions asked at the Patel Infrastructure interview -

  1. DESINGN PROCEDURE:- 1:- The minimum cement content 360 kg/ cum, if the fly ash...read more
  2. DESIGN PROCEDURE. 1:-Use M15 grade concete. Aggregate and cement ratio 12:1...read more
  3. If you comes offer for better salery compair this company. Then what will do?...read more
How long is the Patel Infrastructure interview process?

The duration of Patel Infrastructure interview process can vary, but typically it takes about less than 2 weeks to complete.

Recently Viewed

PHOTOS

InsuranceDekho

3 office photos

LIST OF COMPANIES

Credit Bajaar

Overview

SALARIES

Survey2Connect

SALARIES

S&P Global

SALARIES

S&P Global

JOBS

Survey2Connect

No Jobs

SALARIES

Survey2Connect

LIST OF COMPANIES

Survey2Connect

Overview

SALARIES

S&P Global

INTERVIEWS

UST

No Interviews

Tell us how to improve this page.

Patel Infrastructure Interview Process

based on 34 interviews

Interview experience

3.9
  
Good
View more

Patel Infrastructure Reviews and Ratings

based on 533 reviews

3.9/5

Rating in categories

3.7

Skill development

3.8

Work-life balance

3.5

Salary

3.5

Job security

3.7

Company culture

3.2

Promotions

3.7

Work satisfaction

Explore 533 Reviews and Ratings
Assistant Engineer
79 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Store Executive
63 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Structural Engineer
52 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Safety Officer
43 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Highway Engineer
43 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Patel Infrastructure with

Larsen & Toubro Limited

4.0
Compare

GMR Group

4.0
Compare

Reliance Infrastructure

4.1
Compare

IRB Infrastructure

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview