Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Patel Infrastructure Team. If you also belong to the team, you can get access from here

Patel Infrastructure Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Patel Infrastructure DGM Interview Questions and Answers

Updated 22 Feb 2023

Patel Infrastructure DGM Interview Experiences

1 interview found

DGM Interview Questions & Answers

user image Anonymous

posted on 15 Feb 2023

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jan 2023. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Interested for change to other organisations
Round 3 - Technical 

(1 Question)

  • Q1. Past works experiences and locations
Round 4 - Group Discussion 

Ability to adopt new cultures for the

Round 5 - HR 

(1 Question)

  • Q1. Salary present & expected….

Interview Preparation Tips

Interview preparation tips for other job seekers - Be steady & firm on the fore views before appearing for

Interview questions from similar companies

Interview Questionnaire 

2 Questions

  • Q1. What is density of cement?
  • Ans. 

    The density of cement varies depending on the type of cement used.

    • The density of ordinary Portland cement is around 1440 kg/m³.

    • The density of white cement is around 1300 kg/m³.

    • The density of rapid hardening cement is around 1250 kg/m³.

    • The density of low heat cement is around 1200 kg/m³.

    • The density of high alumina cement is around 1400 kg/m³.

  • Answered by AI
  • Q2. The density of cement is 1440 kg/cum

Interview Questionnaire 

2 Questions

  • Q1. Maximum questions about quality assurance
  • Q2. IS456 IS 2502 IS 10262 IS 1200 IS 383 itc

Interview Preparation Tips

Interview preparation tips for other job seekers - Maximum questions prepared quality assurance and project management
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About structure work.
  • Q2. Slab steel use, which dia
  • Ans. 

    Slab steel reinforcement typically uses 8mm to 16mm diameter bars.

    • Slab steel reinforcement typically uses bars ranging from 8mm to 16mm in diameter

    • The choice of diameter depends on the span, load, and design requirements of the slab

    • Thicker bars are used for heavier loads and longer spans, while thinner bars are used for lighter loads and shorter spans

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Are you comfortable for assam location?
  • Q2. Tinsukia assam location was comfortable for me.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. HR asking about qualification and experience releted questions.
  • Q2. HR asking about documents
Round 3 - Technical 

(8 Questions)

  • Q1. How to calculate shuttering quantity.
  • Ans. 

    Shuttering quantity can be calculated by determining the surface area of the formwork and multiplying it by the depth of the concrete.

    • Measure the length and width of the formwork

    • Calculate the surface area by multiplying the length and width

    • Multiply the surface area by the depth of the concrete to get the shuttering quantity

    • Account for any additional formwork needed for corners or edges

  • Answered by AI
  • Q2. How to calculate steel quantity.
  • Ans. 

    Steel quantity can be calculated by using the formula: (D^2/162) x Length of steel

    • Determine the diameter of the steel

    • Calculate the length of the steel required

    • Use the formula (D^2/162) x Length of steel to calculate the steel quantity

    • Consider wastage and additional steel required for overlaps and joints

  • Answered by AI
  • Q3. What is the initial seting time
  • Ans. 

    Initial setting time is the time taken by cement to harden to a certain degree.

    • Initial setting time is the time taken by cement to harden to a certain degree.

    • It is the time elapsed between the moment water is added to the cement and the time when the paste starts losing its plasticity.

    • The initial setting time of cement is generally around 30 minutes to 1 hour.

    • It is an important property of cement as it determines the t...

  • Answered by AI
  • Q4. How to lap provide in column.
  • Ans. 

    Lapping provides a smooth surface finish to the column.

    • Clean the column thoroughly before lapping.

    • Apply a lapping compound to the column surface.

    • Use a lapping tool to rotate and move up and down the column.

    • Continue lapping until the desired surface finish is achieved.

    • Clean the column again after lapping to remove any residue.

  • Answered by AI
  • Q5. What is density of RCC.and pcc
  • Ans. 

    Density of RCC is around 2500 kg/m3 and PCC is around 2400 kg/m3.

    • RCC stands for Reinforced Cement Concrete and PCC stands for Plain Cement Concrete.

    • Density of RCC depends on the mix design and the type of aggregates used.

    • Density of PCC is lower than RCC due to absence of reinforcement.

    • Density of concrete is an important factor in determining its strength and durability.

  • Answered by AI
  • Q6. What is different b/w OPC and ppc
  • Ans. 

    OPC is Ordinary Portland Cement while PPC is Portland Pozzolana Cement.

    • OPC is made from raw materials like limestone and clay while PPC is made from a mixture of pozzolanic material and OPC.

    • PPC has higher durability and strength compared to OPC.

    • PPC is more eco-friendly as it uses industrial waste as a raw material.

    • OPC is commonly used for construction of buildings and bridges while PPC is used for marine structures, hy...

  • Answered by AI
  • Q7. What is density of sand , water and aggregate.
  • Ans. 

    The density of sand, water, and aggregate varies depending on their composition and temperature.

    • The density of sand ranges from 1300 to 1700 kg/m³.

    • The density of water is 1000 kg/m³ at 4°C.

    • The density of aggregate varies depending on its size and composition.

    • The density of fine aggregate ranges from 1600 to 1800 kg/m³.

    • The density of coarse aggregate ranges from 1200 to 1500 kg/m³.

  • Answered by AI
  • Q8. Why provide clear cover.
  • Ans. 

    Clear cover provides protection and visibility.

    • Clear cover protects the item from dust, dirt, and damage.

    • Clear cover allows the item to be visible without removing the cover.

    • Clear cover is commonly used for electronic devices, books, and documents.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - When give interview. So we have absulatelu free mind.question should be answered after listening well.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jan 2024. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. About current company
Round 2 - Technical 

(3 Questions)

  • Q1. About is codes of building construction
  • Q2. Current job responsibilities..... related questions
  • Q3. About bar bending shedule , lab test
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Current job responsibilities.......
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Basic knowledge of construction work and according to your experience what work had you done in previous company because they ask you according to your CV.
  • Q2. Estimation and costing
  • Q3. Bar bending schedule must be known
  • Q4. Structure analysis should have

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Assistant Engineer - Civil interview:
  • Structural Analysis
  • Quantity Estimation
  • Building Material
  • AutoCAD
Interview preparation tips for other job seekers - Bending moment.
Covering block.
Cement required for 1 sqm of plaster work.
Concrete work as per IS CODE.
IS Code should be known.
Development length.
Overlap length.
Weight of steel bar.
Volume of cement.
Etc.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Deduction rules for plastering
  • Ans. 

    Deduction rules for plastering in civil engineering

    • Deductions are made for openings like doors and windows

    • Deductions are made for thickness of plaster

    • Deductions are made for uneven surfaces

    • Deductions are made for wastage of material

    • Deductions are made for scaffolding

    • Example: If the area to be plastered is 100 sq. ft. and the area of openings is 20 sq. ft., then the net area for plastering will be 80 sq. ft.

  • Answered by AI
  • Q2. Deduction rules for concrete
  • Ans. 

    Deduction rules for concrete

    • Deductions are made to account for the shrinkage and settlement of concrete

    • The deduction rate varies based on the type of concrete and the environmental conditions

    • Typically, a deduction of 1/8 inch per 10 feet is made for normal weight concrete

    • For lightweight concrete, the deduction rate is 1/4 inch per 10 feet

    • The deductions are made from the specified dimensions of the concrete element

  • Answered by AI
  • Q3. Price Escalation bill

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for deduction rules used for quantity estimation
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2020. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Self introduction
  • Q2. Technical question

Interview Preparation Tips

Interview preparation tips for other job seekers - NCC is good company
Work cluter is very good
Management is good
I am happy with my job and organisation
Thanks
Round 1 - Technical 

(2 Questions)

  • Q1. Cost of 1cum concrete work
  • Ans. 

    The cost of 1cum concrete work depends on various factors such as the type of concrete, location, labor cost, etc.

    • The cost of 1cum concrete work varies depending on the type of concrete used, such as M20, M25, etc.

    • The location of the construction site also affects the cost of concrete work.

    • The cost of labor is another factor that affects the cost of concrete work.

    • Additional costs such as transportation, taxes, and perm...

  • Answered by AI
  • Q2. How to do you check window
  • Ans. 

    To check a window, inspect its frame, glass, and hardware for any damage or wear.

    • Check the frame for cracks or warping

    • Inspect the glass for chips, cracks, or fogging

    • Test the hardware to ensure it opens and closes smoothly

    • Check for any gaps or drafts around the window

    • Look for signs of water damage or mold

    • Consider the age and condition of the window

    • Consult a professional if unsure about any issues

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. How much salary growth is expecting

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well for technical because this round decides your package

Patel Infrastructure Interview FAQs

How many rounds are there in Patel Infrastructure DGM interview?
Patel Infrastructure interview process usually has 5 rounds. The most common rounds in the Patel Infrastructure interview process are HR, Resume Shortlist and One-on-one Round.

Tell us how to improve this page.

Patel Infrastructure DGM Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

GMR Group Interview Questions
4.0
 • 80 Interviews
J&F Interview Questions
3.7
 • 30 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
View all
Assistant Engineer
79 salaries
unlock blur

₹1.8 L/yr - ₹4.2 L/yr

Store Executive
62 salaries
unlock blur

₹1.5 L/yr - ₹4.5 L/yr

Structural Engineer
54 salaries
unlock blur

₹2.4 L/yr - ₹6.1 L/yr

Highway Engineer
44 salaries
unlock blur

₹2.2 L/yr - ₹6 L/yr

Safety Officer
43 salaries
unlock blur

₹2.2 L/yr - ₹5.3 L/yr

Explore more salaries
Compare Patel Infrastructure with

Larsen & Toubro Limited

4.0
Compare

GMR Group

4.0
Compare

Reliance Infrastructure

4.1
Compare

IRB Infrastructure

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview