Vendor Development Engineer
Vendor Development Engineer Interview Questions and Answers
Q1. Difference between Low carbon steel, Medium and High carbon steel?
Low carbon steel has the lowest carbon content, medium carbon steel has a moderate carbon content, and high carbon steel has the highest carbon content.
Low carbon steel contains less than 0.25% carbon.
Medium carbon steel contains 0.25% to 0.60% carbon.
High carbon steel contains more than 0.60% carbon.
Low carbon steel is easily weldable and has good ductility.
Medium carbon steel is stronger and harder than low carbon steel.
High carbon steel is extremely strong and hard, but le...read more
Q2. What is Press Tool / Punch / Die and how to calculate capacity of Press Tool
Press Tool / Punch / Die is a tool used in manufacturing to cut, shape, or form materials.
Press Tool / Punch / Die is used in metalworking, woodworking, and plastics manufacturing.
The capacity of a Press Tool is calculated based on the tonnage of the press and the material being worked on.
The tonnage required for a Press Tool can be calculated using the formula: Tonnage = (Material Thickness x Material Strength) / (Die Width x 2).
Q3. What do you know about the engineering processes and manufacturing techniques used for sheet metal?
Sheet metal engineering processes involve cutting, bending, and assembling metal sheets to create various products.
Sheet metal cutting techniques include laser cutting, plasma cutting, and waterjet cutting.
Bending processes involve using press brakes to create bends in the metal sheets.
Sheet metal can be assembled using techniques such as welding, riveting, and adhesive bonding.
Common manufacturing techniques for sheet metal include stamping, roll forming, and deep drawing.
Qu...read more
Q4. What is your knowledge of SAP and stamping processes?
I have extensive knowledge of SAP for managing vendor relationships and stamping processes for manufacturing.
Proficient in using SAP for vendor management, procurement, and supply chain processes
Experienced in overseeing stamping processes for metal fabrication
Knowledgeable in optimizing stamping operations for efficiency and quality
Familiar with implementing SAP solutions to streamline stamping processes
Q5. Manufacturing method of T guide rail for Elevator
T guide rails for elevators are typically manufactured using extrusion or roll forming methods.
Extrusion involves pushing a heated metal billet through a die to create the desired shape.
Roll forming involves passing a metal strip through a series of rollers to gradually form the shape.
The manufacturing method used may depend on factors such as the desired material, tolerances, and production volume.
Quality control measures such as inspection and testing are important to ensur...read more
Q6. Welding method used for SS material
TIG welding is commonly used for SS material due to its precision and clean finish.
TIG welding is a popular method for SS material due to its ability to produce high-quality welds with minimal distortion.
It uses a tungsten electrode to create an arc that melts the metal and filler material, which is then cooled to form a strong bond.
Other welding methods like MIG and Stick welding can also be used for SS material, but TIG is preferred for its precision and clean finish.
Proper...read more
Share interview questions and help millions of jobseekers 🌟
Q7. Types of Welding Gases
Welding gases are used to protect the weld area from atmospheric gases and to provide heat for welding.
Common welding gases include argon, helium, carbon dioxide, and oxygen.
Argon is used for TIG welding, while helium is used for welding aluminum.
Carbon dioxide is used for MIG welding, and oxygen is used for cutting and welding.
Gas mixtures like argon and carbon dioxide are also used for welding.
The choice of welding gas depends on the type of metal being welded and the weldi...read more
Q8. How select RM Prices?
RM prices are selected based on factors like quality, quantity, market demand, and negotiation skills.
Consider the quality of the raw material - higher quality usually comes at a higher price
Take into account the quantity needed - bulk purchases may result in lower prices
Evaluate market demand and supply - prices may fluctuate based on market conditions
Utilize negotiation skills to secure competitive prices from suppliers
Vendor Development Engineer Jobs
Q9. VD stages and Development parameters
Vendor Development (VD) stages involve identifying potential vendors, evaluating their capabilities, negotiating contracts, and monitoring performance. Development parameters include quality, cost, delivery, and innovation.
Identifying potential vendors through market research and referrals
Evaluating vendor capabilities in terms of production capacity, quality standards, and financial stability
Negotiating contracts to ensure favorable terms for both parties
Monitoring vendor pe...read more
Q10. How Costing Select?
Costing is selected based on various factors such as materials, labor, overhead, and profit margin.
Costing is determined by the cost of materials used in production.
Labor costs, including wages and benefits, are also considered in costing.
Overhead costs, such as rent, utilities, and depreciation, are factored into the overall cost.
Profit margin is added to the total cost to determine the selling price.
Different costing methods, such as job costing, process costing, and activi...read more
Interview Questions of Similar Designations
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month