i
Patel Infrastructure
Filter interviews by
I applied via Approached by Company and was interviewed before Aug 2022. There were 3 interview rounds.
The process of construction involves planning, designing, obtaining permits, sourcing materials, and executing the build.
Planning: Develop a detailed plan outlining the project scope, timeline, and budget.
Designing: Create blueprints and architectural drawings to guide the construction process.
Obtaining permits: Secure necessary approvals from local authorities before starting construction.
Sourcing materials: Procure h...
Types of construction include residential, commercial, industrial, and civil engineering.
Residential construction involves building houses, apartments, and other living spaces.
Commercial construction includes offices, retail stores, and restaurants.
Industrial construction focuses on factories, warehouses, and manufacturing plants.
Civil engineering construction involves infrastructure like roads, bridges, and dams.
Top trending discussions
posted on 11 Sep 2023
I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
I applied via Job Fair and was interviewed before May 2023. There was 1 interview round.
I applied via Shine and was interviewed in Jun 2024. There was 1 interview round.
posted on 23 Jul 2024
posted on 26 Apr 2023
I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.
OEE is a measure of manufacturing productivity. Improving it involves reducing downtime, increasing speed, and minimizing defects.
Calculate OEE by multiplying availability, performance, and quality rates.
Reduce downtime by improving maintenance and scheduling.
Increase speed by optimizing processes and equipment.
Minimize defects by improving quality control and training.
Use data analysis to identify areas for improvemen...
Problem solving tools are techniques used to identify, analyze and solve problems.
Root Cause Analysis (RCA) helps identify the underlying cause of a problem
Fishbone Diagrams help identify the potential causes of a problem
5 Whys technique helps identify the root cause of a problem by asking 'why' five times
Pareto Analysis helps prioritize problems based on their impact
Brainstorming helps generate ideas and solutions to ...
TPM is implemented in shopfloor through a structured approach involving 5S, autonomous maintenance, and continuous improvement.
TPM involves a cultural shift towards proactive maintenance and continuous improvement
The implementation process starts with 5S to create a clean and organized workplace
Autonomous maintenance involves empowering operators to perform routine maintenance tasks
TPM also involves planned maintenance...
I applied via Company Website and was interviewed in Dec 2023. There were 3 interview rounds.
Mathematics - 1 2 3, English, structural
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
The Soil Bearing Capacity of Adyar varies depending on the specific location and soil composition.
Soil bearing capacity is typically measured in terms of pressure per unit area that the soil can support without failure.
Factors affecting soil bearing capacity include soil type, moisture content, compaction, and depth.
For Adyar, the soil bearing capacity can range from 1000 to 5000 kN/m^2 depending on the specific locati
based on 1 interview
Interview experience
Assistant Engineer
79
salaries
| ₹1.8 L/yr - ₹4.2 L/yr |
Store Executive
62
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Structural Engineer
54
salaries
| ₹2.4 L/yr - ₹6.1 L/yr |
Highway Engineer
44
salaries
| ₹2.2 L/yr - ₹6 L/yr |
Safety Officer
43
salaries
| ₹2.2 L/yr - ₹5.3 L/yr |
CTS Consulting & Technical Support
J K Fenner
Saudi Binladin Group
Bahwan Engineering