I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
Experienced finance professional with strong leadership skills and a track record of driving results.
Over 10 years of experience in finance and accounting roles
Managed a team of 15 accountants and successfully implemented cost-saving measures
Led the financial planning and analysis process resulting in a 10% increase in profitability
Strong analytical skills and attention to detail
Excellent communication and interpersona
I rate myself highly based on my extensive experience, strong leadership skills, and proven track record of achieving results.
Extensive experience in managing accounts and financial operations
Strong leadership skills in leading teams and driving performance
Proven track record of achieving financial targets and improving processes
Excellent communication and interpersonal skills
Ability to analyze data and make strategic ...
posted on 8 Apr 2024
I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.
Carpet area of a building can be calculated by measuring the inner dimensions of the building excluding the walls.
Measure the length and width of each room in the building
Exclude the thickness of walls from the measurements
Calculate the area of each room by multiplying length and width
Sum up the areas of all rooms to get the total carpet area of the building
posted on 21 Feb 2022
I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 6 Jun 2020
I applied via Naukri.com and was interviewed before Jun 2019. There were 3 interview rounds.
posted on 24 Jan 2023
I applied via Walk-in and was interviewed in Jul 2022. There were 3 interview rounds.
Shuttering quantity can be calculated by determining the surface area of the formwork and multiplying it by the depth of the concrete.
Measure the length and width of the formwork
Calculate the surface area by multiplying the length and width
Multiply the surface area by the depth of the concrete to get the shuttering quantity
Account for any additional formwork needed for corners or edges
Steel quantity can be calculated by using the formula: (D^2/162) x Length of steel
Determine the diameter of the steel
Calculate the length of the steel required
Use the formula (D^2/162) x Length of steel to calculate the steel quantity
Consider wastage and additional steel required for overlaps and joints
Initial setting time is the time taken by cement to harden to a certain degree.
Initial setting time is the time taken by cement to harden to a certain degree.
It is the time elapsed between the moment water is added to the cement and the time when the paste starts losing its plasticity.
The initial setting time of cement is generally around 30 minutes to 1 hour.
It is an important property of cement as it determines the t...
Lapping provides a smooth surface finish to the column.
Clean the column thoroughly before lapping.
Apply a lapping compound to the column surface.
Use a lapping tool to rotate and move up and down the column.
Continue lapping until the desired surface finish is achieved.
Clean the column again after lapping to remove any residue.
Density of RCC is around 2500 kg/m3 and PCC is around 2400 kg/m3.
RCC stands for Reinforced Cement Concrete and PCC stands for Plain Cement Concrete.
Density of RCC depends on the mix design and the type of aggregates used.
Density of PCC is lower than RCC due to absence of reinforcement.
Density of concrete is an important factor in determining its strength and durability.
OPC is Ordinary Portland Cement while PPC is Portland Pozzolana Cement.
OPC is made from raw materials like limestone and clay while PPC is made from a mixture of pozzolanic material and OPC.
PPC has higher durability and strength compared to OPC.
PPC is more eco-friendly as it uses industrial waste as a raw material.
OPC is commonly used for construction of buildings and bridges while PPC is used for marine structures, hy...
The density of sand, water, and aggregate varies depending on their composition and temperature.
The density of sand ranges from 1300 to 1700 kg/m³.
The density of water is 1000 kg/m³ at 4°C.
The density of aggregate varies depending on its size and composition.
The density of fine aggregate ranges from 1600 to 1800 kg/m³.
The density of coarse aggregate ranges from 1200 to 1500 kg/m³.
Clear cover provides protection and visibility.
Clear cover protects the item from dust, dirt, and damage.
Clear cover allows the item to be visible without removing the cover.
Clear cover is commonly used for electronic devices, books, and documents.
posted on 24 Apr 2023
Slab steel reinforcement typically uses 8mm to 16mm diameter bars.
Slab steel reinforcement typically uses bars ranging from 8mm to 16mm in diameter
The choice of diameter depends on the span, load, and design requirements of the slab
Thicker bars are used for heavier loads and longer spans, while thinner bars are used for lighter loads and shorter spans
posted on 2 May 2021
I applied via Walk-in and was interviewed before May 2020. There was 1 interview round.
posted on 9 Sep 2022
The cost of 1cum concrete work depends on various factors such as the type of concrete, location, labor cost, etc.
The cost of 1cum concrete work varies depending on the type of concrete used, such as M20, M25, etc.
The location of the construction site also affects the cost of concrete work.
The cost of labor is another factor that affects the cost of concrete work.
Additional costs such as transportation, taxes, and perm...
To check a window, inspect its frame, glass, and hardware for any damage or wear.
Check the frame for cracks or warping
Inspect the glass for chips, cracks, or fogging
Test the hardware to ensure it opens and closes smoothly
Check for any gaps or drafts around the window
Look for signs of water damage or mold
Consider the age and condition of the window
Consult a professional if unsure about any issues
posted on 9 Jan 2024
I applied via Company Website and was interviewed in Jul 2023. There was 1 interview round.
posted on 3 Aug 2024
I have 3 years of experience working as a civil engineer for a construction company.
Managed multiple construction projects simultaneously
Performed site inspections and ensured compliance with building codes
Collaborated with architects and contractors to resolve design issues
based on 1 interview
Interview experience
Assistant Engineer
79
salaries
| ₹0 L/yr - ₹0 L/yr |
Store Executive
62
salaries
| ₹0 L/yr - ₹0 L/yr |
Structural Engineer
52
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Highway Engineer
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
GMR Group
Reliance Infrastructure
IRB Infrastructure