Filter interviews by
I applied via LinkedIn and was interviewed in Aug 2022. There were 3 interview rounds.
Add water to increase the slump of concrete.
Add small amounts of water and mix thoroughly.
Check the slump again and repeat if necessary.
Avoid adding too much water as it can weaken the concrete.
If temperature of DBM or BC is not achieved at the time of laying, the material should be reheated.
Reheat the material to achieve the required temperature before laying
Ensure that the temperature is monitored and maintained during the laying process
Consult with the manufacturer or supplier for specific instructions on temperature requirements
Top trending discussions
I applied via Naukri.com and was interviewed before Jan 2021. There was 1 interview round.
IS 456 is used for RCC structures.
IS 456 is the Indian Standard Code of Practice for Plain and Reinforced Concrete.
It provides guidelines for the design and construction of RCC structures.
It covers various aspects such as materials, design, construction, and quality control.
It is widely used in India for the design and construction of RCC structures.
Other relevant IS codes for RCC structures include IS 875, IS 13920, a
The file format for ETABS is .EDB
ETABS saves files in .EDB format
This format is used to store the model and analysis data
Other file formats used by ETABS include .E2K and .ET
The .E2K format is used for importing and exporting data to other software
The .ET format is used for exporting data to Excel
ETABS stands for Extended 3D Analysis of Building Systems.
ETABS is a software used for structural analysis and design of buildings.
It allows for the creation of 3D models of buildings and analysis of their behavior under various loads.
ETABS can be used for designing structures made of steel, concrete, or composite materials.
The software is widely used in the construction industry for designing high-rise buildings, brid...
I applied via Referral and was interviewed before Sep 2019. There were 6 interview rounds.
I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.
I applied via Job Fair and was interviewed before May 2023. There was 1 interview round.
posted on 30 Mar 2023
I applied via Approached by Company and was interviewed before Mar 2022. There were 2 interview rounds.
43 and 53 grade cement differ in their compressive strength and suitability for different types of construction.
43 grade cement has a compressive strength of 43 MPa while 53 grade cement has a compressive strength of 53 MPa.
53 grade cement is more suitable for construction of high-rise buildings and structures that require high strength concrete.
43 grade cement is suitable for construction of low to medium rise buildin...
The size of the pier arm of concourse level depends on the load it needs to support and the design specifications.
The size of the pier arm is determined by the load it needs to support, which is calculated based on the weight of the structure it supports and the live loads it will experience.
The design specifications also play a role in determining the size of the pier arm, including factors such as the height of the s...
posted on 10 Jul 2024
RDBMS stands for Relational Database Management System, a type of database management system that stores data in a structured format.
Organizes data into tables with rows and columns
Uses SQL for querying and managing data
Supports ACID properties for data consistency
Examples: MySQL, Oracle Database, SQL Server
I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.
I am unable to provide my previous salary as it is confidential. However, I am expecting a competitive salary based on my qualifications and experience.
My previous salary is confidential and I am unable to disclose it.
I am expecting a salary that is commensurate with my qualifications and experience.
I am open to discussing salary expectations during the negotiation process.
I believe that a competitive salary is importa...
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
Some of the top questions asked at the D.p. Jain & Co. Infrastructure Pvt . Material Engineer interview -
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Assistant Manager
39
salaries
| ₹3.8 L/yr - ₹8 L/yr |
Senior Engineer
27
salaries
| ₹4.2 L/yr - ₹7.2 L/yr |
Deputy Manager
20
salaries
| ₹5 L/yr - ₹8.6 L/yr |
Senior Executive - Stores
19
salaries
| ₹3.5 L/yr - ₹4.5 L/yr |
Highway Engineer
19
salaries
| ₹3.5 L/yr - ₹5.2 L/yr |
Patel Infrastructure
CTS Consulting & Technical Support
J K Fenner
Saudi Binladin Group