Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by J&F Team. If you also belong to the team, you can get access from here

J&F Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

J&F Structural Engineer Interview Questions and Answers

Updated 9 Aug 2021

J&F Structural Engineer Interview Experiences

2 interviews found

I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What type of building experience you have in design

Interview Preparation Tips

Interview preparation tips for other job seekers - Most of question is from Precast and RCC. It was very good experience as interviewer was very polite and knowledgeable.

I applied via Referral and was interviewed before Sep 2019. There were 6 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Questions in PRECAST

Interview Preparation Tips

Interview preparation tips for other job seekers - If you have RCC experience then can go for interview , company is focused on PRECAST so interview is very hard and you will need to have good exposure in this field. Prepare 3D BIM software and RCC work

Structural Engineer Interview Questions Asked at Other Companies

Q1. 1. Find weight and COG of an irrrgular shape. Unit weight of memb ... read more
asked in WSP
Q2. How moment is transfer from beam to column, In I section what is ... read more
Q3. What should be the height of Tremie pipe from pile founding level ... read more
Q4. How much cement used for making 1m³ concrete
asked in Bechtel
Q5. Explain about recent work in details from initial stage to execut ... read more

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - One-on-one 

(2 Questions)

  • Q1. How do you calculate the amount of material used in cubic meters?
  • Ans. 

    The amount of material used in cubic meters can be calculated by multiplying the length, width, and height of the object.

    • Calculate the volume of the object by multiplying the length, width, and height in meters.

    • The formula for calculating volume is: Volume = Length x Width x Height

    • For example, if a rectangular prism has dimensions of 2m x 3m x 4m, the volume would be 2m x 3m x 4m = 24 cubic meters.

  • Answered by AI
  • Q2. Water absorpation related
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Design of base plate
  • Ans. 

    Base plate design involves determining the size, thickness, and material of the plate to support the structural load.

    • Consider the load requirements and dimensions of the column being supported

    • Calculate the required thickness and size of the base plate based on the load

    • Select a suitable material for the base plate, such as steel or concrete

    • Ensure proper anchorage and connection details for the base plate

  • Answered by AI
  • Q2. Roughly draw a base plate connection
  • Ans. 

    A base plate connection is a structural element used to connect a steel column to a concrete foundation.

    • Base plate connections are typically used in steel structures to transfer loads from the column to the foundation.

    • The base plate is usually welded to the bottom of the column and anchored to the concrete foundation using anchor bolts.

    • The base plate connection design must consider factors such as load transfer, bendin...

  • Answered by AI
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Questions about monopile
  • Q2. Quantity for pile ,pile cap
  • Ans. 

    The quantity for pile and pile cap is determined based on the design requirements and load calculations.

    • The quantity of piles is determined based on the structural load requirements and soil conditions.

    • The quantity of pile caps is determined based on the number of piles and the design of the structure.

    • Calculations for pile and pile cap quantities involve factors such as load distribution, material strength, and safety

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is dual case in finding R value in EQ
  • Ans. 

    Dual case in finding R value in EQ refers to considering both the worst-case scenario and the best-case scenario.

    • Dual case involves analyzing the structure's response to both maximum and minimum loads.

    • It helps in determining the range of possible outcomes for the structure.

    • For example, in seismic design, dual case analysis considers both the maximum and minimum seismic forces that the structure may experience.

  • Answered by AI
  • Q2. Why you are shifting your job

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm and answer honestly

I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions relating to our job in deep. That's it

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever you know about say genuinely and be confident always. Don't hesitate at all.
Put your thoughts clearly.

Interview Questionnaire 

3 Questions

  • Q1. PSC girder
  • Q2. Minor bridge
  • Q3. Related

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Interview Questionnaire 

1 Question

  • Q1. Technical question

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI
Contribute & help others!
anonymous
You can choose to be anonymous

Recently Viewed

INTERVIEWS

Dainik Bhaskar Group

No Interviews

INTERVIEWS

Ernst & Young

No Interviews

INTERVIEWS

Macroland B-Serv

No Interviews

INTERVIEWS

J&F

No Interviews

SALARIES

Dainik Bhaskar Group

INTERVIEWS

Believe Cosmetics

No Interviews

INTERVIEWS

Dainik Bhaskar Group

No Interviews

INTERVIEWS

Dainik Bhaskar Group

No Interviews

INTERVIEWS

Dainik Bhaskar Group

20 top interview questions

LIST OF COMPANIES

Dainik Bhaskar Group

Locations

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 742 Interviews
Tata Projects Interview Questions
4.2
 • 425 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
Tractebel Interview Questions
4.1
 • 42 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
View all

Fast track your campus placements

View all

J&F Structural Engineer Reviews and Ratings

based on 4 reviews

4.7/5

Rating in categories

4.5

Skill development

4.5

Work-life balance

4.3

Salary

4.7

Job security

4.4

Company culture

4.5

Promotions

4.4

Work satisfaction

Explore 4 Reviews and Ratings
Design Engineer
57 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

BIM Modeller
15 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Tekla Modeller
11 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Structural Draftsman
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Quantity Surveyor
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare J&F with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview