I applied via Job Portal and was interviewed in Sep 2021. There were 7 interview rounds.
I chose Database Administration job because of my interest in managing and organizing data.
I have a passion for working with data and ensuring its accuracy and security
I enjoy problem-solving and optimizing database performance
I appreciate the importance of data in decision-making and business operations
I have experience in database management and am constantly learning new skills
Example: In my previous job, I was resp...
Top trending discussions
Base plate design involves determining the size, thickness, and material of the plate to support the structural load.
Consider the load requirements and dimensions of the column being supported
Calculate the required thickness and size of the base plate based on the load
Select a suitable material for the base plate, such as steel or concrete
Ensure proper anchorage and connection details for the base plate
A base plate connection is a structural element used to connect a steel column to a concrete foundation.
Base plate connections are typically used in steel structures to transfer loads from the column to the foundation.
The base plate is usually welded to the bottom of the column and anchored to the concrete foundation using anchor bolts.
The base plate connection design must consider factors such as load transfer, bendin...
Dual case in finding R value in EQ refers to considering both the worst-case scenario and the best-case scenario.
Dual case involves analyzing the structure's response to both maximum and minimum loads.
It helps in determining the range of possible outcomes for the structure.
For example, in seismic design, dual case analysis considers both the maximum and minimum seismic forces that the structure may experience.
I applied via Approached by Company and was interviewed before Jan 2023. There was 1 interview round.
I am highly skilled in draughting and 3D modelling.
I have extensive experience in using CAD software for draughting and 3D modelling.
I am proficient in creating detailed technical drawings and 3D models.
I have successfully completed several projects involving complex draughting and 3D modelling tasks.
I am knowledgeable about industry standards and best practices in draughting and 3D modelling.
I continuously update my s...
I applied via Campus Placement and was interviewed before Aug 2022. There were 3 interview rounds.
Quantative aptitude /verbal and logical reasoning
The amount of material used in cubic meters can be calculated by multiplying the length, width, and height of the object.
Calculate the volume of the object by multiplying the length, width, and height in meters.
The formula for calculating volume is: Volume = Length x Width x Height
For example, if a rectangular prism has dimensions of 2m x 3m x 4m, the volume would be 2m x 3m x 4m = 24 cubic meters.
posted on 29 Aug 2024
I applied via Naukri.com
Technical questions about the Revit and MEP
The quantity for pile and pile cap is determined based on the design requirements and load calculations.
The quantity of piles is determined based on the structural load requirements and soil conditions.
The quantity of pile caps is determined based on the number of piles and the design of the structure.
Calculations for pile and pile cap quantities involve factors such as load distribution, material strength, and safety
based on 1 review
Rating in categories
Design Engineer
57
salaries
| ₹0 L/yr - ₹0 L/yr |
BIM Modeller
15
salaries
| ₹0 L/yr - ₹0 L/yr |
Tekla Modeller
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Structural Draftsman
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Quantity Surveyor
6
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company