For irregular shape, find volume and multiply by unit weight to get weight. Divide moment of each part by total weight to get COG.
To calculate force required for COG shift, use moment equation. Sum of moments about any point should be equal to zero.
For SFD and BMD, use equations of equilibrium and moment. Draw free body diagram to show all forces acting on the portal.
Understan...
Barge and lifting analysis involves determining the support conditions and lifting factors for equipment on a barge.
Barge and lifting analysis is used to ensure that equipment on a barge is properly supported and can be safely lifted.
The procedure involves analyzing the support conditions of the barge and the equipment, as well as determining the lifting factors required to safely lift the equipment.
Various factors mus...
I applied via Naukri.com and was interviewed before Nov 2019. There was 1 interview round.
Design parameters for steel structure
Load capacity and distribution
Material strength and durability
Environmental factors such as wind and seismic activity
Connection details and joint design
Fire resistance and protection measures
I have 5 years of exposure to STAAD software.
I have used STAAD for various structural analysis and design projects.
I am proficient in using STAAD for modeling, analysis, and design of steel and concrete structures.
I have experience in using STAAD for seismic analysis and design of structures.
I have also used STAAD for foundation design and analysis.
I keep myself updated with the latest versions and features of STAAD so
The boom length of a tower crane varies depending on the model and manufacturer.
Tower crane boom length can range from 30 meters to over 100 meters.
The boom length determines the maximum height and reach of the crane.
Factors such as weight capacity and wind speed also affect the boom length.
Some popular tower crane models and their boom lengths include: Potain MDT 98 (55 meters), Liebherr 630 EC-H 40 (40 meters), and T
I applied via Company Website and was interviewed in Feb 2022. There was 1 interview round.
I applied via Walk-in and was interviewed in Mar 2022. There was 1 interview round.
Sir casting yard area, bed alignment of survey department properly center shuttering palet panchang,and line perfect condition,
Precast segment- properly casting yard area bed alignment and survey department cordinate with checking proper center line, segment shuttering perfect ag pr drowning dimension, jig properly arrengement of bed area
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
based on 2 reviews
Rating in categories
BIM Engineer
205
salaries
| ₹2.5 L/yr - ₹7.2 L/yr |
BIM Architect
107
salaries
| ₹3 L/yr - ₹7.5 L/yr |
MEP Bim Engineer
56
salaries
| ₹4 L/yr - ₹7.2 L/yr |
Senior BIM Engineer
45
salaries
| ₹4.3 L/yr - ₹10 L/yr |
BIM Modeller
45
salaries
| ₹3 L/yr - ₹7.3 L/yr |
AECOM
AtkinsRealis
Saipem
Nasser S. Al Hajri Corporation