Material Engineer

10+ Material Engineer Interview Questions and Answers

Updated 7 Jul 2025
search-icon

Q. If the required temperature of DBM or BC is not achieved at the time of laying, what actions would you take regarding the material?

Ans.

If temperature of DBM or BC is not achieved at the time of laying, the material should be reheated.

  • Reheat the material to achieve the required temperature before laying

  • Ensure that the temperature is monitored and maintained during the laying process

  • Consult with the manufacturer or supplier for specific instructions on temperature requirements

Q. If the slump of concrete is low during concreting, what will you do?

Ans.

Add water to increase the slump of concrete.

  • Add small amounts of water and mix thoroughly.

  • Check the slump again and repeat if necessary.

  • Avoid adding too much water as it can weaken the concrete.

Material Engineer Interview Questions and Answers for Freshers

illustration image

Asked in Tata Steel

1d ago

Q. what is tata steel company and what is the work of employees.

Ans.

Tata Steel is a leading global steel company with operations in multiple countries. Employees work in various departments such as production, quality control, research and development.

  • Tata Steel is a multinational steel-making company headquartered in India.

  • Employees work in departments such as production, quality control, research and development, sales, and marketing.

  • They are involved in manufacturing steel products, ensuring quality standards, conducting research for produ...read more

Asked in Fermator

1d ago

Q. What are the basic roles and responsibilities of a material resources planner?

Ans.

Material resources planners manage and optimize the use of materials in production processes to ensure efficiency and cost-effectiveness.

  • Forecasting material needs based on production schedules and demand.

  • Coordinating with suppliers to ensure timely delivery of materials.

  • Monitoring inventory levels to prevent shortages or excess stock.

  • Analyzing material usage data to identify cost-saving opportunities.

  • Collaborating with engineering teams to select appropriate materials for pr...read more

Are these interview questions helpful?

Q. What is the significance of the 1.65 factor in strength calculations?

Ans.

1.65 is used as a safety factor in strength calculations to account for uncertainties and variations in material properties.

  • 1.65 is typically used as a safety factor in engineering design to ensure that the structure or material can withstand loads beyond the expected maximum.

  • It accounts for uncertainties in material properties, manufacturing processes, and environmental conditions.

  • For example, if the calculated maximum stress in a material is 100 MPa, a safety factor of 1.65...read more

Asked in OEN India

4d ago

Q. Can you lift 40 kgs of weight?

Ans.

Yes, I can lift 40 kgs of weight.

  • Yes, I have experience lifting heavy weights in the gym.

  • I regularly lift weights as part of my fitness routine.

  • I have lifted heavy equipment in previous engineering projects.

Material Engineer Jobs

Siemens Limited logo
Materials Engineer (Metallurgist) 4-8 years
Siemens Limited
4.0
Gurgaon / Gurugram
T.EN GLOBAL BUSINESS SERVICES PRIVATE LIMITED  logo
Lead Engineer - Materials & Corrosion For Chennai 14-20 years
T.EN GLOBAL BUSINESS SERVICES PRIVATE LIMITED
4.0
Chennai
T.EN GLOBAL BUSINESS SERVICES PRIVATE LIMITED logo
Lead Engineer - Materials & Corrosion 14-20 years
T.EN GLOBAL BUSINESS SERVICES PRIVATE LIMITED
4.0
Chennai

Asked in Tata Steel

1d ago

Q. Explain the iron-carbon diagram.

Ans.

Steel and iron carbide diagram is a graphical representation of the phases present in steel at different temperatures.

  • Steel and iron carbide diagram shows the phases of steel (ferrite, austenite, cementite) at different temperatures.

  • It helps in understanding the microstructure and properties of steel.

  • The diagram is also known as the iron-carbon phase diagram.

  • It is used in heat treatment processes to control the properties of steel.

Q. What is a geotechnical investigation?

Ans.

Geotechnical investigation is the process of studying the properties of soil and rock below the ground surface to determine their suitability for construction projects.

  • It involves collecting soil and rock samples from various depths

  • Testing the samples to determine their strength, density, permeability, and other properties

  • Analyzing the data to assess the stability and load-bearing capacity of the site

  • The results of the investigation help engineers design foundations, slopes, ...read more

Share interview questions and help millions of jobseekers 🌟

man-with-laptop
1d ago

Q. What is the difference between metals and non-metals?

Ans.

Metals are elements that are typically shiny, malleable, and good conductors of heat and electricity, while non-metals are typically dull, brittle, and poor conductors.

  • Metals are typically shiny, while non-metals are dull.

  • Metals are malleable and ductile, while non-metals are brittle.

  • Metals are good conductors of heat and electricity, while non-metals are poor conductors.

  • Examples of metals include iron, copper, and gold, while examples of non-metals include sulfur, carbon, an...read more

Asked in AIES

5d ago

Q. what is ductile, toughness etc

Ans.

Ductile refers to a material's ability to deform under tensile stress without breaking, while toughness is the ability to absorb energy before fracturing.

  • Ductility is the ability of a material to stretch or deform without breaking when subjected to tensile stress.

  • Toughness is the ability of a material to absorb energy and plastically deform before fracturing.

  • Ductile materials include metals like copper and aluminum, while tough materials include steel and rubber.

  • Ductility is ...read more

3d ago

Q. What is the minimum bitumen content for BC-1, BC-2, and DBM?

Ans.

The minimum bitumen content of BC-1, BC-2, and DBM varies depending on the specifications of the project.

  • The minimum bitumen content is determined by the mix design of the project.

  • BC-1 typically has a minimum bitumen content of 4.5% by weight of total mix.

  • BC-2 typically has a minimum bitumen content of 5.0% by weight of total mix.

  • DBM typically has a minimum bitumen content of 5.5% by weight of total mix.

  • The minimum bitumen content may also vary depending on factors such as tr...read more

6d ago

Q. Technical difficulties in site

Ans.

Technical difficulties in site

  • Equipment malfunction

  • Material shortage

  • Environmental factors

  • Human error

  • Lack of proper planning

  • Communication breakdown

3d ago

Q. How often should core tests be performed?

Ans.

Core tests should be conducted at regular intervals depending on the project requirements.

  • Frequency of core tests depends on the type of material being tested and the project requirements.

  • For example, in construction projects, core tests may be conducted every 50 feet of concrete poured.

  • In manufacturing, core tests may be conducted daily or weekly to ensure consistent quality.

  • Regular core testing helps identify any issues early on and ensures the material meets the required s...read more

1d ago

Q. Define welding and its types.

Ans.

Welding is a process of joining two or more pieces of metal together by melting and fusing them.

  • Types of welding include arc welding, gas welding, resistance welding, and laser welding.

  • Arc welding uses an electric arc to create heat and melt the metal pieces together.

  • Gas welding involves using a gas flame to melt the metal and join the pieces.

  • Resistance welding uses pressure and heat to join the metal pieces.

  • Laser welding uses a high-powered laser beam to melt and fuse the me...read more

Interview Experiences of Popular Companies

Tata Steel Logo
4.0
 • 928 Interviews
vivo Logo
4.1
 • 209 Interviews
Hyundai Mobis Logo
3.8
 • 70 Interviews
View all
interview tips and stories logo
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Material Engineer Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
play-icon
play-icon
qr-code
Trusted by over 1.5 Crore job seekers to find their right fit company
80 L+

Reviews

10L+

Interviews

4 Cr+

Salaries

1.5 Cr+

Users

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2025 Info Edge (India) Ltd.

Follow Us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter
Profile Image
Hello, Guest
AmbitionBox Employee Choice Awards 2025
Winners announced!
awards-icon
Contribute to help millions!
Write a review
Write a review
Share interview
Share interview
Contribute salary
Contribute salary
Add office photos
Add office photos
Add office benefits
Add office benefits