I applied via Referral and was interviewed in Mar 2021. There were 3 interview rounds.
Cost control in construction activities through effective management of major items
Develop a detailed cost estimate for the project
Monitor and track actual costs against the estimate
Identify major cost drivers and implement cost-saving measures
Regularly review and update the project budget
Ensure effective communication and collaboration between all stakeholders
Use technology and software to streamline cost control proc...
Top trending discussions
posted on 27 Dec 2020
I applied via Naukri.com and was interviewed before Dec 2019. There was 1 interview round.
posted on 8 Sep 2022
Flexible pavement and rigid pavement are two types of pavements used in different types of road projects.
Flexible pavement is made of multiple layers of materials that can flex under traffic loads.
Rigid pavement is made of a single layer of concrete or asphalt that is rigid and does not flex.
New projects involve constructing roads from scratch, while realignment projects involve changing the alignment of existing roads...
The question describes the application of prime coat and tack coat on a WMM surface.
Prime coat is a low viscous cut back bitumen used to fill up pores and voids on a WMM surface.
Tack coat is a light application of bitumen, asphalt, emulsion, or dilute water applied on the prime coat.
The purpose of the prime coat is to bond the WMM surface with the subsequent layers of asphalt.
The tack coat helps in providing a strong b...
Design procedure for 150mm DLC thickness using M15 grade concrete with specific requirements for cement content, testing, mixing, transportation, compaction, and curing.
Use M15 grade concrete with maximum aggregate cement ratio of 12:1
Minimum cement content of 150kg per cum, or 120kg per cum if flyash is more than 20%
Perform 5 sample cube test after 7 day curing with strength of 10 MPA, and 1 sample cube test after 7 d...
Design procedure for Senior Project Manager role including cement content, strength, joint design, and surface finishing.
Minimum cement content of 360 kg per cum, or 310 kg per cum if fly ash is more than 20%
Flexure strength of cement concrete after 28 days curing is 4.5 MPA
Compressive strength of cement concrete after 28 days curing is 40 MPA
Dowel bar provided for expansion joint vehicle load transfer between slabs
Tie...
posted on 14 Sep 2023
I applied via Recruitment Consulltant
Project Management , Production Management and HSE
Deeply interested in RR PACKAGE
Well. We used to do everyday
posted on 1 Mar 2023
I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.
posted on 10 Sep 2017
I appeared for an interview before Sep 2016.
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 12 May 2018
based on 4 reviews
Rating in categories
Engineer
865
salaries
| ₹2.2 L/yr - ₹7 L/yr |
Senior Engineer
842
salaries
| ₹3.2 L/yr - ₹11.5 L/yr |
Associate Manager
513
salaries
| ₹4.8 L/yr - ₹15.8 L/yr |
Mechanical Engineer
388
salaries
| ₹2.1 L/yr - ₹7.3 L/yr |
Civil Engineer
344
salaries
| ₹2.2 L/yr - ₹7.6 L/yr |
Larsen & Toubro Limited
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies