Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by G R Infraprojects Team. If you also belong to the team, you can get access from here

G R Infraprojects Verified Tick

Compare button icon Compare button icon Compare
4.1

based on 1.5k Reviews

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

G R Infraprojects QA QC Engineer Interview Questions and Answers

Updated 11 Aug 2024

G R Infraprojects QA QC Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Brief in QMS why it is adopted
  • Ans. 

    QMS is adopted to ensure consistent quality, meet customer requirements, and improve processes.

    • Ensures consistent quality of products or services

    • Helps meet customer requirements and expectations

    • Improves processes and efficiency

    • Reduces risks and errors

    • Enhances customer satisfaction

    • Provides a framework for continuous improvement

  • Answered by AI
  • Q2. Design mix procedure
  • Ans. 

    Design mix procedure involves determining the proportions of materials to create a concrete mix with desired properties.

    • Identify the required strength and durability of the concrete

    • Select suitable materials such as cement, aggregates, and water

    • Calculate the proportions of each material based on mix design methods

    • Test the mix to ensure it meets specifications

    • Adjust the mix if necessary to achieve desired properties

  • Answered by AI

QA QC Engineer Jobs at G R Infraprojects

View all

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Grade of concrete
  • Ans. 

    Grade of concrete refers to its strength and durability.

    • Grade of concrete is determined by its compressive strength.

    • It is denoted by a number followed by 'M' (e.g. M20, M25).

    • Higher grade concrete has higher strength and durability.

    • Different grades of concrete are used for different purposes.

    • For example, M20 grade is commonly used for residential construction.

  • Answered by AI
  • Q2. Mix design of concrete
  • Ans. 

    Mix design of concrete involves determining the proportions of ingredients to achieve desired properties.

    • Mix design is the process of determining the proportions of cement, water, aggregates, and admixtures in concrete.

    • It involves considering factors such as strength, workability, durability, and economy.

    • Various methods like the ACI method, British method, and DOE method can be used for mix design.

    • The mix design proces...

  • Answered by AI
Round 2 - Telephonic Call 

(2 Questions)

  • Q1. Status of my life style
  • Q2. My behaviour and other

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. What is pwht ?
  • Ans. 

    PWHT stands for Post Weld Heat Treatment, a process used to reduce residual stresses and improve the mechanical properties of welded joints.

    • PWHT involves heating the welded component to a specific temperature for a certain period of time, followed by controlled cooling.

    • The process helps to eliminate hydrogen cracking, improve toughness, and reduce distortion in the welded joint.

    • Common methods of PWHT include furnace he...

  • Answered by AI
  • Q2. What is wqt range ?
  • Ans. 

    WQT range refers to the range of values for Water Quality Testing in a specific context.

    • WQT range can vary depending on the parameters being tested, such as pH, turbidity, dissolved oxygen, etc.

    • For example, the WQT range for pH in drinking water may be 6.5-8.5.

    • Monitoring and maintaining WQT range is crucial for ensuring safe and clean water supply.

    • Regular testing and analysis of water samples help in determining if the

  • Answered by AI
  • Q3. Acceptance criteria of LPT
  • Ans. 

    LPT acceptance criteria ensure that the test results meet specified requirements.

    • Test results must meet specified requirements outlined in the acceptance criteria

    • Acceptance criteria should be clearly defined and documented

    • Criteria may include specific performance metrics or thresholds

    • Examples: minimum tensile strength, maximum elongation percentage

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Projects related construction questions
  • Q2. Staff to gather relationships
  • Q3. Clint coordination
  • Q4. Technical questions
  • Q5. Time for working

Interview Preparation Tips

Interview preparation tips for other job seekers - L&T company very good
Company employees very sincerely.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. NDT testing questions
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - As hybrid projects in solar&wind 

(2 Questions)

  • Q1. All Question Related to resume and experience in your privous jobs And Project.
  • Q2. All Testing, site related work question, MMS, DC & AC. Quality related documents work. FQP.

Interview Preparation Tips

Topics to prepare for L&T Construction QA QC Engineer interview:
  • All related to role & responsibi
  • All test knowledge. If you work
Interview preparation tips for other job seekers - Only mentioned resume those point you have working on daily practice.
Role and responsibilities.
Focus your target.
Round 1 - One-on-one 

(5 Questions)

  • Q1. What is the difference between qa and qc
  • Ans. 

    QA focuses on preventing defects while QC focuses on identifying and fixing defects.

    • QA is a process-oriented approach that ensures quality is built into the product from the beginning

    • QC is a product-oriented approach that involves testing and inspecting the product to identify defects

    • QA is proactive while QC is reactive

    • QA involves continuous improvement while QC involves finding and fixing defects

    • Examples of QA activit...

  • Answered by AI
  • Q2. Why you choose QC department
  • Ans. 

    I chose the QC department because of my passion for ensuring quality and my attention to detail.

    • I have always been meticulous and detail-oriented, which are essential qualities for a QC engineer.

    • I enjoy the process of identifying and resolving quality issues to improve overall product performance.

    • I find satisfaction in ensuring that products meet or exceed customer expectations.

    • I believe that quality control plays a cr...

  • Answered by AI
  • Q3. How you tackle NCR situation
  • Ans. 

    I investigate the root cause, propose corrective actions, and ensure implementation to prevent recurrence.

    • Identify the root cause of the NCR

    • Propose corrective actions to prevent recurrence

    • Ensure implementation of corrective actions

    • Document the NCR and corrective actions taken

    • Communicate with relevant stakeholders

  • Answered by AI
  • Q4. What is the procedure of soil and concrete strength testing
  • Ans. 

    Soil and concrete strength testing involves several steps including sample collection, preparation, and testing.

    • Collect soil and concrete samples from the site

    • Prepare the samples for testing by drying and crushing them

    • Perform compression tests on concrete samples to determine strength

    • Perform triaxial or unconfined compression tests on soil samples to determine strength

    • Record and analyze the test results to ensure compl

  • Answered by AI
  • Q5. How you convince your client representative on a critical situation
  • Ans. 

    To convince a client representative on a critical situation, it is important to communicate effectively, provide evidence and solutions, and build trust.

    • Listen actively to the client representative's concerns and understand their perspective.

    • Clearly explain the critical situation, its impact, and potential risks.

    • Present evidence such as test results, data analysis, or documentation to support your claims.

    • Offer alternat...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - To become a successfull QC Engineer. Practical, theoretical, logical, technical and design knowledege is required. When I started qc inspector job my target was qc engineers job. Then next qc supervisor and finally QC MANAGER.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Target mean strength of M-35 Grade concrete
  • Ans. 

    Target mean strength of M-35 Grade concrete is 35 MPa.

    • The target mean strength of M-35 Grade concrete is 35 MPa.

    • M-35 Grade concrete is designed for structural applications requiring high strength.

    • Quality control measures should be in place to ensure the concrete meets the target strength.

  • Answered by AI
  • Q2. What is the soil compaction percentage to be achieved in Embankment
  • Ans. 

    Soil compaction percentage in embankment typically ranges from 90% to 95% depending on the type of soil and project specifications.

    • Soil compaction percentage in embankment is usually between 90% to 95%

    • The exact percentage may vary based on the type of soil being compacted

    • Project specifications and requirements will dictate the specific compaction percentage to be achieved

  • Answered by AI

I applied via Naukri.com and was interviewed in Aug 2021. There were 4 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. What is grade of concrete?
  • Ans. 

    The grade of concrete refers to its strength and durability.

    • Grade of concrete is denoted by a number followed by 'M' which stands for mix.

    • The number represents the compressive strength of the concrete in megapascals (MPa).

    • For example, M20 grade concrete means the compressive strength is 20 MPa.

    • Different grades of concrete are used for different purposes, such as M10 for non-structural purposes and M40 for heavy-duty st

  • Answered by AI
  • Q2. Frequency tests of construction material as per cpwd?
  • Ans. 

    Frequency tests of construction material as per CPWD

    • Frequency tests of construction material are conducted as per the guidelines provided by CPWD (Central Public Works Department).

    • The frequency of tests depends on the type of material and its intended use in the construction project.

    • CPWD provides specific guidelines for different materials such as cement, aggregates, concrete, steel, etc.

    • The tests may include compressi...

  • Answered by AI
  • Q3. How to check brick and plaster and tiles work?
  • Ans. 

    Brick, plaster, and tile work can be checked by inspecting for proper alignment, levelness, and uniformity.

    • Check for proper alignment of bricks and tiles using a straight edge or level.

    • Inspect for levelness of plaster using a spirit level.

    • Check for uniformity of color and texture in tiles.

    • Ensure that the joints between bricks or tiles are consistent in size and shape.

    • Look for any cracks or gaps in the plaster or grout ...

  • Answered by AI
  • Q4. Lap length questions
  • Q5. How to check reinforcement as per drawing u have got any problem in slab steel how to solve.
  • Ans. 

    To check reinforcement as per drawing, use measuring tape and compare with the drawing. If there is a problem in slab steel, check for any missing bars or incorrect placement.

    • Use measuring tape to check the length and diameter of reinforcement bars

    • Compare the measurements with the drawing to ensure they match

    • Check for any missing bars or incorrect placement

    • If there is a problem, consult the structural engineer for a so

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - 1.15minutes interview
2.dont take tension in interview time

I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. Where do you see yourself in 5 years?
  • Q2. What are your salary expectations?
  • Q3. Dilip Build con Ltd is a very big and a good company. I am unable to leave the time due to non-improvement in the quality of food since few months and salary is not coming on time.
Round 2 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips

Interview Preparation Tips

Interview preparation tips for other job seekers - Dileep Buildcon is a very big and very good company. If I get a better salary from you again, I will definitely try to come.

G R Infraprojects Interview FAQs

How many rounds are there in G R Infraprojects QA QC Engineer interview?
G R Infraprojects interview process usually has 1 rounds. The most common rounds in the G R Infraprojects interview process are Technical.
How to prepare for G R Infraprojects QA QC Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at G R Infraprojects. The most common topics and skills that interviewers at G R Infraprojects expect are QC, Quality Audit, Quality Check, Quality Control and Quality Inspection.
What are the top questions asked in G R Infraprojects QA QC Engineer interview?

Some of the top questions asked at the G R Infraprojects QA QC Engineer interview -

  1. Brief in QMS why it is adop...read more
  2. Design mix proced...read more

Tell us how to improve this page.

G R Infraprojects QA QC Engineer Salary
based on 28 salaries
₹3 L/yr - ₹6.8 L/yr
17% less than the average QA QC Engineer Salary in India
View more details

G R Infraprojects QA QC Engineer Reviews and Ratings

based on 11 reviews

4.8/5

Rating in categories

4.3

Skill development

4.0

Work-Life balance

4.5

Salary & Benefits

4.3

Job Security

4.7

Company culture

4.5

Promotions/Appraisal

4.1

Work Satisfaction

Explore 11 Reviews and Ratings
Engineer QA/QC

Pachore

2-7 Yrs

Not Disclosed

Explore more jobs
Assistant Manager
386 salaries
unlock blur

₹4.6 L/yr - ₹11.5 L/yr

Senior Engineer
223 salaries
unlock blur

₹3.6 L/yr - ₹8.9 L/yr

Engineer
138 salaries
unlock blur

₹2 L/yr - ₹6.5 L/yr

Senior Executive
131 salaries
unlock blur

₹3 L/yr - ₹8 L/yr

Deputy Manager
126 salaries
unlock blur

₹6.6 L/yr - ₹17.5 L/yr

Explore more salaries
Compare G R Infraprojects with

Nagarjuna Construction Company

4.1
Compare

PNC Infratech

3.9
Compare

Ashoka Buildcon

4.1
Compare

IRB Infrastructure

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview